Select Stations to Find Your Route

South Extension to Ashok Park Main Metro Route

Fare & Timings

Normal Fare: ₹43
Smart Card Fare: ₹39
First Train: 06:18 AM
Last Train: 11:53 PM
Powered by ixigo
17 Stations 3 Interchanges 17.8 Km 0 hrs 33 mins Difficult Route
Starts here
Pink Circular Line • Platform 2 • Via Yamuna Vihar
Change here
Yellow Line • Platform 2 • Towards Samaypur Badli • 10 Mins Walk
Dilli Haat INA Metro Station connects Yellow and Pink Lines via underground interchange corridors.
Change here
Blue Line • Platform 4 • Towards Dwarka Sector 21 • 5 Mins Walk
Rajiv Chowk Metro Station links Blue and Yellow Lines via concourse and multiple foot overbridges.
Change here
Green Branch Line • Platform 3 • Towards Brigadier Hoshiar Singh • 5 Mins Walk
Kirti Nagar Metro Station is an elevated interchange station connecting Blue and Green Lines.
Ends here
Exit
View Route Map
Loading map…
100%
Scroll to zoom  ·  Drag to pan

Route Summary

How to reach Ashok Park Main from South Extension by metro? : Board the metro from South Extension station and travel through 17 intermediate metro stations. During the journey, you will need to change trains at 3 interchange stations before reaching Ashok Park Main.

The approximate travel time between South Extension and Ashok Park Main is 0 hrs 33 mins. The total distance covered on this metro route is 17.8 Km. The first metro from South Extension departs at 06:18 AM, while the last train leaves at 11:53 PM.

The estimated metro fare for this route is ₹43. Smart card users may receive discounted fares. Parking facilities are not available at either station.

Estimated Travel Cost Comparison and Savings based on distance & typical fares in Indian cities.

Travel Mode Estimated Cost Savings vs Metro
🚇 Metro ₹43
🏍 Bike ₹162 ₹119 more
🛺 Auto ₹244 ₹201 more
🚕 Cab ₹396 ₹353 more

Pre-calculated Weekly/Monthly Fare Chart

The fare shown below is calculated for daily, weekly, and monthly travel which includes both up and down journey and for a single person.

Travel Period Cash Fare Smart Card
Daily ₹86 ₹77
Weekly (5 Days) ₹430 ₹387
Weekly (6 Days) ₹516 ₹464
Weekly (7 Days) ₹602 ₹542
Monthly (20 Days) ₹1720 ₹1548
Monthly (24 Days) ₹2064 ₹1858
Monthly (28 Days) ₹2408 ₹2167

Taking this metro ride means

  • 🌱 Estimated Carbon Saving: 2.69 kg CO₂
  • ⛽ Fuel Saving (Petrol): 1.19 litres
  • ⏱ Time Saving in Rush Hour: 21.0 minutes
  • 🔥 Calories Burned: ~105 kcal

Safety Tips

  • Beware of pickpockets.
  • Don’t use mobile while onboard/deboard.
  • Don’t use mobile at coach gates.
  • Don’t force open the coach doors.
  • Avoid personal conversations with strangers.

Share route info feedback

Address
South Extension I, Block G, New Delhi, Delhi 110049
Network & Line
Delhi Metro / Pink Circular
Contact
9667396689
Station Details
Layout
Underground
Platform Type
Island Platform
Doors will open on the left.
Areas Around

East Kidwai Nagar, South Extension 2 Market, Amrit Nagar, Rishi Nagar, South Extension I

STATION AMENITIES
Divyang Friendly
Sulabh Toilet
STATION GATES
Gate no. Way to/from Divyang
1East Kidwai Nagar, NBCC Flats, Kale Khan Ka Makbara
2South Extension Part-1 Market, South Extension Part-1 Block C,D,E,G,H,N
3South Extension Part-2 Market, South Extension Part-2 Block E,D,L,M
4South Extension Part-2 Market, AIIMS Campus, National Medical Library
TRAIN FREQUENCY ON
Days Peak Hours Off-Peak Hours
Monday-Friday6 min 30 sec7 min 00 sec
Saturday7 min 00 sec8 min 10 sec
Sunday8 min 10 sec8 min 10 sec

Address
Rohtak Road, Block D, East Punjabi Bagh, Punjabi Bagh, New Delhi, Delhi 110026
Network & Line
Delhi Metro / Green Branch
Contact
8800793204
Station Details
Layout
Elevated
Platform Type
Side Platform
Doors will open on the right.
Areas Around

Madan Park, Ashok Park Extension, Omkar Nagar, Phool Bagh

STATION AMENITIES
Feeder Bus
Divyang Friendly
Sulabh Toilet
STATION GATES
Gate no. Way to/from Divyang
1Madan Park, Ashok Park Extn.
2Ashok Park Colony, Rampura
TRAIN FREQUENCY ON
Days Peak Hours Off-Peak Hours
Monday-Friday08 min 20 sec10 min 20 sec
Saturday10 min 00 sec10 min 20 sec
Sunday11 min 20 sec11 min 20 sec

Metro Routes FAQs

𝒜. The first metro from South Extension is at 06:18 AM and the last metro is at 11:53 PM

𝒜. The travel distance is approx 17.8 Km KM

𝒜. There are 17 stations on this route.

𝒜. Approx travel time: 0 hrs 33 mins

𝒜. Yes, paid parking is available.

𝒜. Yes, feeder buses operate approx 06:00 AM – 10:00 PM (paid separately).

Book Metro Tickets on ixigo — First Free Metro Ticket Book Metro Tickets on ixigo — First Free Metro Ticket
Saved Routes
No saved routes yet.
Tap Save Route on any route page.