- 1
-
2
Board the Pink Circular Line towards Maujpur Babarpur · from Platform 3
Ride 5 stops to Sarai Kale Khan Nizamuddin.Change lines here -
3
Board the Line 1 towards Modipuram RRTS
Ride 6 stops to Guldhar RRTS.
Find Another Metro Route
South Extension to Guldhar RRTS Metro Route
- 1
-
2
Board the Pink Circular Line towards Maujpur Babarpur · from Platform 3
Ride 5 stops to Sarai Kale Khan Nizamuddin.Change lines here -
3
Board the Line 1 towards Modipuram RRTS
Ride 6 stops to Guldhar RRTS.
Delhi Metro Route Map 2026
Route from South Extension to Guldhar RRTS on the map.
Route Summary
How to reach Guldhar RRTS from South Extension by metro? Board the metro from South Extension station and travel through 10 intermediate metro stations. During the journey, you will need to change train at 1 interchange station(s) before reaching Guldhar RRTS.
The approximate travel time between South Extension and Guldhar RRTS is 0 hrs 37 mins. The total distance covered on this metro route is 28.1 Km. The first metro from South Extension departs at 06:12 AM, while the last train leaves at 11:45 PM.
The estimated metro fare for this route is ₹102. Smart card users may receive discounted fares. Parking facility is available at Guldhar RRTS station.
Estimated Travel Cost Comparison and Savings based on distance & typical fares in Indian cities.
| Mode | Est. Cost | Savings vs Metro |
|---|---|---|
| 🚇 Metro | ₹102 | — |
| 🏍 Bike | ₹245 | ₹143 more |
| 🛺 Auto | ₹367 | ₹265 more |
| 🚕 Cab | ₹602 | ₹500 more |
Pre-calculated Weekly/Monthly Fare Chart
The fare shown below is calculated for daily, weekly, and monthly travel which includes both up and down journey and for a single person.
| Period | Cash | Smart Card |
|---|---|---|
| Daily | ₹204 | ₹184 |
| Weekly (5 days) | ₹1,020 | ₹918 |
| Weekly (6 days) | ₹1,224 | ₹1,102 |
| Weekly (7 days) | ₹1,428 | ₹1,285 |
| Monthly (20 days) | ₹4,080 | ₹3,672 |
| Monthly (24 days) | ₹4,896 | ₹4,406 |
| Monthly (28 days) | ₹5,712 | ₹5,141 |
Metro Ride Benefits
- 🌱 Carbon savings: 4.25 kg CO₂
- ⛽ Fuel savings: 1.87 litres
- ⏱ Time saved vs road: 46.9 minutes
- 🔥 Calories burned (walk to/from station): ~70 kcal
Safety Tips
- Stand behind the yellow line while waiting for the train.
- Keep your belongings secure and within sight at all times.
- Let passengers exit before boarding.
- Hold handrails while the train is moving.
- In an emergency, use the help point or alert station staff.
| Gate No. | Way To | Accessible |
|---|---|---|
| 1 | East Kidwai Nagar, NBCC Flats, Kale Khan Ka Makbara | |
| 2 | South Extension Part-1 Market, South Extension Part-1 Block C,D,E,G,H,N | |
| 3 | South Extension Part-2 Market, South Extension Part-2 Block E,D,L,M | |
| 4 | South Extension Part-2 Market, AIIMS Campus, National Medical Library |
| Peak | Off-Peak | |
|---|---|---|
| Weekdays | 6 min 30 sec | 7 min 00 sec |
| Saturday | 7 min 00 sec | 8 min 10 sec |
| Sunday | 8 min 10 sec | 8 min 10 sec |
| Gate No. | Way To | Accessible |
|---|---|---|
| 1 | Towards Meerut end on road going to Meerut, near Raj Kumar Goel Institute of Technology | |
| 2 | Towards Delhi end on road going to Delhi |
| Peak | Off-Peak | |
|---|---|---|
| Weekdays | 10 min | 15 min |
| Saturday | 10 min | 15 min |
| Sunday | 10 min | 15 min |