Find Another Metro Route
Guldhar RRTS to Azadpur Metro Route
- 1
-
2
Board the Line 1 towards New Ashok Nagar RRTS · from Platform 2
Ride 5 stops to Anand Vihar ISBT.Change lines here -
3
Board the Blue Branch Line towards Dwarka Sector 21 · from Platform 2
Ride 1 stop to Karkarduma.Change lines here · 10 min Walk Karkarduma Metro Station is an elevated interchange station connecting the Blue and Pink Lines -
4
Board the Pink Circular Line towards Maujpur Babarpur · from Platform 3
Ride 4 stops to Welcome.Change lines here -
5
Board the Red Line towards Rithala · from Platform 1
Ride 3 stops to Kashmere Gate.Change lines here -
6
Board the Yellow Line towards Samaypur Badli · from Platform 2
Ride 6 stops to Azadpur.
Delhi Metro Route Map 2026
Route from Guldhar RRTS to Azadpur on the map.
Route Summary
How to reach Azadpur from Guldhar RRTS by metro? Board the metro from Guldhar RRTS station and travel through 20 intermediate metro stations. During the journey, you will need to change train at 1 interchange station(s) before reaching Azadpur.
The approximate travel time between Guldhar RRTS and Azadpur is 0 hrs 26 mins. The total distance covered on this metro route is 34.9 Km. The first metro from Guldhar RRTS departs at 06:26 AM, while the last train leaves at 10:22 AM.
The estimated metro fare for this route is ₹104. Smart card users may receive discounted fares. Parking facility is available at both Guldhar RRTS and Azadpur stations.
Estimated Travel Cost Comparison and Savings based on distance & typical fares in Indian cities.
| Mode | Est. Cost | Savings vs Metro |
|---|---|---|
| 🚇 Metro | ₹104 | — |
| 🏍 Bike | ₹299 | ₹195 more |
| 🛺 Auto | ₹448 | ₹344 more |
| 🚕 Cab | ₹737 | ₹633 more |
Pre-calculated Weekly/Monthly Fare Chart
The fare shown below is calculated for daily, weekly, and monthly travel which includes both up and down journey and for a single person.
| Period | Cash | Smart Card |
|---|---|---|
| Daily | ₹208 | ₹187 |
| Weekly (5 days) | ₹1,040 | ₹936 |
| Weekly (6 days) | ₹1,248 | ₹1,123 |
| Weekly (7 days) | ₹1,456 | ₹1,310 |
| Monthly (20 days) | ₹4,160 | ₹3,744 |
| Monthly (24 days) | ₹4,992 | ₹4,493 |
| Monthly (28 days) | ₹5,824 | ₹5,242 |
Metro Ride Benefits
- 🌱 Carbon savings: 5.26 kg CO₂
- ⛽ Fuel savings: 2.32 litres
- ⏱ Time saved vs road: 78.4 minutes
- 🔥 Calories burned (walk to/from station): ~70 kcal
Safety Tips
- Stand behind the yellow line while waiting for the train.
- Keep your belongings secure and within sight at all times.
- Let passengers exit before boarding.
- Hold handrails while the train is moving.
- In an emergency, use the help point or alert station staff.
| Gate No. | Way To | Accessible |
|---|---|---|
| 1 | Towards Meerut end on road going to Meerut, near Raj Kumar Goel Institute of Technology | |
| 2 | Towards Delhi end on road going to Delhi |
| Peak | Off-Peak | |
|---|---|---|
| Weekdays | 10 min | 15 min |
| Saturday | 10 min | 15 min |
| Sunday | 10 min | 15 min |
| Gate No. | Way To | Accessible |
|---|---|---|
| 1 | Mahendru Enclave and Model Town-III | |
| 2 | Not Operational | |
| 3 | GT Karnal Road, Azadpur Railway Station, and Lal Bagh | |
| 4 | Municipal Colony, Model Town-III, and Chhatrasal Stadium |
| Peak | Off-Peak | |
|---|---|---|
| Weekdays | 6 min 30 sec | 7 min 00 sec |
| Saturday | 7 min 00 sec | 8 min 10 sec |
| Sunday | 8 min 10 sec | 8 min 10 sec |