Select Stations to Find Your Route

South Extension to Phase 3 Metro Route

Fare & Timings

Normal Fare: ₹63
DMRC ₹43 HMRTC ₹20
Smart Card Fare: ₹59
First Train: 06:18 AM
Last Train: 11:53 PM
15 Stations 2 Interchanges 20.5 Km Distance 0 hrs 37 mins Travel Time Moderate Route
Starts here
Pink Circular Line • Platform 2 • Via Yamuna Vihar
Change here
Yellow Line • Platform 1 • Towards Millennium City Centre (HUDA City Centre) • 10 Mins Walk
Dilli Haat INA Metro Station connects Yellow and Pink Lines via underground interchange corridors.
Change here
Rapid Line • Platform • Towards
Sikandarpur Metro Station connects Yellow Line and Rapid Metro via foot overbridge.
Ends here
Exit
19 Stations 2 Interchanges 22.5 Km Distance 0 hrs 41 mins Travel Time Moderate Route
Starts here
Pink Circular Line • Platform 2 • Via Yamuna Vihar
Change here
Yellow Line • Platform 1 • Towards Millennium City Centre (HUDA City Centre) • 10 Mins Walk
Change here
Rapid Line • Platform 2 • Towards Phase 3
Ends here
Exit
Saved Routes
No saved routes yet.
Tap Save Route on any route page.
View Route Map
Loading map…
100%
Scroll to zoom  ·  Drag to pan
Route Summary

How to reach Phase 3 from South Extension by metro? : Board the metro from South Extension station and travel through 19 intermediate metro stations. During the journey, you will need to change trains at 2 interchange stations before reaching Phase 3.

The approximate travel time between South Extension and Phase 3 is 0 hrs 41 mins. The total distance covered on this metro route is 22.5 Km. The first metro from South Extension departs at 06:18 AM, while the last train leaves at 11:53 PM.

The estimated metro fare for this route is ₹63. Smart card users may receive discounted fares. Parking facilities are not available at either station.

Estimated Travel Cost Comparison and Savings based on distance & typical fares in Indian cities.

Travel Mode Estimated Cost Savings vs Metro
🚇 Metro ₹63
🏍 Bike ₹184 ₹121 more
🛺 Auto ₹276 ₹213 more
🚕 Cab ₹450 ₹387 more
Pre-calculated Weekly/Monthly Fare Chart

The fare shown below is calculated for daily, weekly, and monthly travel which includes both up and down journey and for a single person.

Travel Period Cash Fare Smart Card
Daily ₹126 ₹117
Weekly (5 Days) ₹630 ₹587
Weekly (6 Days) ₹756 ₹704
Weekly (7 Days) ₹882 ₹822
Monthly (20 Days) ₹2520 ₹2348
Monthly (24 Days) ₹3024 ₹2818
Monthly (28 Days) ₹3528 ₹3287
Taking this metro ride means
  • 🌱 Estimated Carbon Saving: 3.10 kg CO₂
  • ⛽ Fuel Saving (Petrol): 1.37 litres
  • ⏱ Time Saving in Rush Hour: 24.2 minutes
  • 🔥 Calories Burned: ~105 kcal
Safety Tips
  • Beware of pickpockets.
  • Don’t use mobile while onboard/deboard.
  • Don’t use mobile at coach gates.
  • Don’t force open the coach doors.
  • Avoid personal conversations with strangers.
Share route info feedback

Address
South Extension I, Block G, New Delhi, Delhi 110049
Network & Line
Gurgaon Metro / Rapid
Contact
9667396689
Station Details
Layout
Underground
Platform Type
Island Platform
Doors will open on the left.
Areas Around

East Kidwai Nagar, South Extension 2 Market, Amrit Nagar, Rishi Nagar, South Extension I

STATION AMENITIES
Divyang Friendly
Sulabh Toilet
STATION GATES
Gate no. Way to/from Divyang
1East Kidwai Nagar, NBCC Flats, Kale Khan Ka Makbara
2South Extension Part-1 Market, South Extension Part-1 Block C,D,E,G,H,N
3South Extension Part-2 Market, South Extension Part-2 Block E,D,L,M
4South Extension Part-2 Market, AIIMS Campus, National Medical Library
TRAIN FREQUENCY ON
Days Peak Hours Off-Peak Hours
Monday-Friday6 min 30 sec7 min 00 sec
Saturday7 min 00 sec8 min 10 sec
Sunday8 min 10 sec8 min 10 sec

Address
Cyber City, Road Number 19, U block, DLF Phase 3, Sector 24, Gurugram, Haryana 122002
Network & Line
Gurgaon Metro / Rapid
Contact
Station Details
Layout
Elevated
Platform Type
Side Platform
Doors will open on the right.
Areas Around

S Block, Balveer Market, Sector 24, Nathupur

STATION AMENITIES
Divyang Friendly
Sulabh Toilet
TRAIN FREQUENCY ON
Days Peak Hours Off-Peak Hours
Monday-Friday
Saturday
Sunday
Metro Routes FAQs

𝒜. The first metro from South Extension is at 06:18 AM and the last metro is at 11:53 PM

𝒜. The travel distance is approx 20.5 Km KM

𝒜. There are 15 stations on this route.

𝒜. Approx travel time: 0 hrs 37 mins

𝒜. Yes, paid parking is available.

𝒜. Yes, feeder buses operate approx 06:00 AM – 10:00 PM (paid separately).

99 views . 🙏 Happy Journey. Safe Journey.
Was this page helpful?
0 people found this helpful
Saved Routes
No saved routes yet.
Tap Save Route on any route page.