-
1
Start at Phase 3 station.
-
2
Board the Rapid Line towards Modipuram RRTS
Ride 2 stops to Sikandarpur.Change lines here -
3
Board the Yellow Line towards Samaypur Badli · from Platform 2
Ride 12 stops to Dilli Haat INA.Change lines here Sikandarpur Metro Station connects Yellow Line and Rapid Metro via foot overbridge. -
4
Board the Pink Circular Line towards Maujpur Babarpur · from Platform 1
Ride 5 stops to Sarai Kale Khan Nizamuddin.Change lines here · 10 min Walk Dilli Haat INA Metro Station connects Yellow and Pink Lines via underground interchange corridors. -
5
Board the Line 1 towards Modipuram RRTS
Ride 2 stops to New Ashok Nagar RRTS. -
Arrive at New Ashok Nagar RRTS station. You have reached your destination.
Find Another Metro Route
Phase 3 to New Ashok Nagar RRTS Metro Route
-
1
Start at Phase 3 station.
-
2
Board the Rapid Line towards Sector 55 56 · from Platform 1
Ride 6 stops to Sikandarpur.Change lines here -
3
Board the Yellow Line towards Samaypur Badli · from Platform 2
Ride 12 stops to Dilli Haat INA.Change lines here -
4
Board the Pink Circular Line towards Maujpur Babarpur · from Platform 1
Ride 5 stops to Sarai Kale Khan Nizamuddin.Change lines here -
5
Board the Line 1 towards Modipuram RRTS
Ride 2 stops to New Ashok Nagar RRTS. -
Arrive at New Ashok Nagar RRTS station. You have reached your destination.
Gurgaon Metro Route Map 2026
Route from Phase 3 to New Ashok Nagar RRTS on the map.
Route Summary
How to reach New Ashok Nagar RRTS from Phase 3 by metro? Board the metro from Phase 3 station and travel through 21 intermediate metro stations. During the journey, you will need to change train at 3 interchange station(s) before reaching New Ashok Nagar RRTS.
The approximate travel time between Phase 3 and New Ashok Nagar RRTS is 0 hrs 54 mins. The total distance covered on this metro route is 31.4 Km. The first metro from Phase 3 departs at 06:19 AM, while the last train leaves at 08:09 PM.
The estimated metro fare for this route is ₹104. Smart card users may receive discounted fares. Parking facility is not available at either Phase 3 or New Ashok Nagar RRTS station.
Estimated Travel Cost Comparison and Savings based on distance & typical fares in Indian cities.
| Mode | Est. Cost | Savings vs Metro |
|---|---|---|
| 🚇 Metro | ₹104 | — |
| 🏍 Bike | ₹271 | ₹167 more |
| 🛺 Auto | ₹407 | ₹303 more |
| 🚕 Cab | ₹668 | ₹564 more |
Pre-calculated Weekly/Monthly Fare Chart
The fare shown below is calculated for daily, weekly, and monthly travel which includes both up and down journey and for a single person.
| Period | Cash | Smart Card |
|---|---|---|
| Daily | ₹208 | ₹191 |
| Weekly (5 days) | ₹1,040 | ₹956 |
| Weekly (6 days) | ₹1,248 | ₹1,147 |
| Weekly (7 days) | ₹1,456 | ₹1,338 |
| Monthly (20 days) | ₹4,160 | ₹3,824 |
| Monthly (24 days) | ₹4,992 | ₹4,589 |
| Monthly (28 days) | ₹5,824 | ₹5,354 |
Metro Ride Benefits
- 🌱 Carbon savings: 4.74 kg CO₂
- ⛽ Fuel savings: 2.09 litres
- ⏱ Time saved vs road: 40.4 minutes
- 🔥 Calories burned (walk to/from station): ~70 kcal
Safety Tips
- Stand behind the yellow line while waiting for the train.
- Keep your belongings secure and within sight at all times.
- Let passengers exit before boarding.
- Hold handrails while the train is moving.
- In an emergency, use the help point or alert station staff.
| Peak | Off-Peak | |
|---|---|---|
| Weekdays | 10 min | 15 min |
| Saturday | 10 min | 15 min |
| Sunday | 10 min | 15 min |