Find a HMRTC Route
● Rapid Line
Gurgaon Metro Rapid Line Overview
Rapid Line Station List 2026 (11 Active)
Parking Feeder Bus ATM Restroom
| # | Station | Amenities |
|---|---|---|
| 1 |
Sector 55 56
|
|
| 2 |
Sector 54 Chowk
|
|
| 3 |
Sector 53 54
|
|
| 4 |
Sector 42 43
|
|
| 5 |
Phase 1
|
|
| 6 |
Sikandarpur
Interchange
|
|
| 7 |
Phase 2
|
|
| 8 |
Belvedere Towers
|
|
| 9 |
Cyber City
|
|
| 10 |
Moulsari Avenue
|
|
| 11 |
Phase 3
|
Rapid Line Route Map 2026
Pan and zoom to explore the HMRTC Rapid Line.
Rapid Line History, Facts & Expansion
- Rapid Metro Gurugram was built by Rapid Metro Gurgaon Limited and was India's first privately financed metro system.
- Phase 1, the Cyber City loop, opened on 14 November 2013, and Phase 2 to Sector 55-56 opened on 31 March 2017.
- The system is fully elevated, about 12.85 km long, with 11 stations.
- It connects with the Delhi Metro Yellow Line at Sikanderpur.
- After the IL&FS-led concessionaire exited, the Delhi Metro Rail Corporation took over operations in 2019.
- It was the first metro in India to sell naming rights for its stations.
- Average daily ridership is roughly 30,000-48,000 passengers.
- Trains on the Rapid Metro are 3-coach sets built by Siemens.
- The original Phase 1 runs as a loop around DLF Cyber City.
- Phase 2 runs along Golf Course Road, serving Sectors 42-43, 53-54 and 55-56.
- Sikanderpur station is the interchange with the Delhi Metro Yellow Line.
- Stations carry sponsor names under naming-rights agreements.
Rapid Metro Gurugram Phase-wise Expansion
Phase 1 (2013-2014) (Completed)
The Cyber City loop of about 5.1 km opened on 14 November 2013, with Cyber City station following in May 2014.
Phase 2 (2017) (Completed)
Sikanderpur-Sector 55-56 along Golf Course Road, about 7 km, opened on 31 March 2017.
Operations Takeover (2019) (Completed)
DMRC took over operations after the IL&FS-led concessionaire exited.
Gurugram Metro: Millennium City Centre-Cyber City (Under construction)
About 28.5 km with 27 elevated stations, approved at about Rs 5,452 crore, targeted around 2029; it will join the Rapid Metro at Cyber City.
Future: Sector 55-56-Pachgaon (Planned)
A southern extension towards Pachgaon is planned; alignment and timeline are being finalised.
Rapid Line FAQs
Gurgaon Metro Rapid Line Timings
Gurgaon Metro Rapid Line runs on regular schedule throughout the week between Sector 55 56 and Phase 3.
Gurgaon Metro Rapid Line Timings from Monday to Saturday:
- First train: 06:00:00 AM (Sector 55 56 to Phase 3) | 06:00:00 AM (Phase 3 to Sector 55 56 )
- Last train: 22:00:00 PM
Gurgaon Metro Rapid Line Timings on Sunday:
- First train: 06:00:00 AM (Sector 55 56 to Phase 3) | 06:00:00 (Phase 3 to Sector 55 56 )
- Last train: 22:00:00 PM