Select Stations to Find Your Route

Phase 2 to New Ashok Nagar RRTS Metro Route

Fare & Timings

Normal Fare: ₹104
HMRTC ₹20 DMRC ₹54 NCRTC ₹30
Smart Card Fare: ₹96
First Train: 06:21 AM
Last Train: 10:21 PM
Powered by ixigo
21 Stations 3 Interchanges 30.8 Km 0 hrs 58 mins Difficult Route
Starts here
Rapid Line • Platform 1 • Towards Sector 55 56
Change here
Yellow Line • Platform 2 • Towards Samaypur Badli
Sikandarpur Metro Station connects Yellow Line and Rapid Metro via foot overbridge.
Change here
Pink Circular Line • Platform 1 • Via Maujpur Babarpur • 10 Mins Walk
Dilli Haat INA Metro Station connects Yellow and Pink Lines via underground interchange corridors.
Change here
Line 1 Line • Platform 0 • Towards Modipuram RRTS
Ends here
Exit
View Route Map
Loading map…
100%
Scroll to zoom  ·  Drag to pan

Route Summary

How to reach New Ashok Nagar RRTS from Phase 2 by metro? : Board the metro from Phase 2 station and travel through 21 intermediate metro stations. During the journey, you will need to change trains at 3 interchange stations before reaching New Ashok Nagar RRTS.

The approximate travel time between Phase 2 and New Ashok Nagar RRTS is 0 hrs 58 mins. The total distance covered on this metro route is 30.8 Km. The first metro from Phase 2 departs at 06:21 AM, while the last train leaves at 10:21 PM.

The estimated metro fare for this route is ₹104. Smart card users may receive discounted fares. Parking facilities are not available at either station.

Estimated Travel Cost Comparison and Savings based on distance & typical fares in Indian cities.

Travel Mode Estimated Cost Savings vs Metro
🚇 Metro ₹104
🏍 Bike ₹266 ₹162 more
🛺 Auto ₹400 ₹296 more
🚕 Cab ₹656 ₹552 more

Pre-calculated Weekly/Monthly Fare Chart

The fare shown below is calculated for daily, weekly, and monthly travel which includes both up and down journey and for a single person.

Travel Period Cash Fare Smart Card
Daily ₹208 ₹191
Weekly (5 Days) ₹1040 ₹956
Weekly (6 Days) ₹1248 ₹1147
Weekly (7 Days) ₹1456 ₹1338
Monthly (20 Days) ₹4160 ₹3824
Monthly (24 Days) ₹4992 ₹4589
Monthly (28 Days) ₹5824 ₹5354

Taking this metro ride means

  • 🌱 Estimated Carbon Saving: 4.65 kg CO₂
  • ⛽ Fuel Saving (Petrol): 2.05 litres
  • ⏱ Time Saving in Rush Hour: 36.4 minutes
  • 🔥 Calories Burned: ~70 kcal

Safety Tips

  • Beware of pickpockets.
  • Don’t use mobile while onboard/deboard.
  • Don’t use mobile at coach gates.
  • Don’t force open the coach doors.
  • Avoid personal conversations with strangers.

Share route info feedback

Address
U Block, DLF Phase 2, Sector 25, Gurugram, Haryana 122002
Network & Line
Gurgaon Metro / Rapid
Contact
Station Details
Layout
Elevated
Platform Type
Side Platform
Doors will open on the right.
Areas Around

Nathupur, Balveer Market, DLF Phase 2, Shahpur, S Block

STATION AMENITIES
Divyang Friendly
STATION GATES
Gate no. Way to/from Divyang
1Towards Building no-5
2Towards Yadav Bus Service Side
TRAIN FREQUENCY ON
Days Peak Hours Off-Peak Hours
Monday-Friday
Saturday
Sunday

Address
A-706, Block B, New Ashok Nagar, New Delhi, Delhi 110096
Network & Line
Delhi Meerut RRTS Metro / Line 1
Contact
9289928745
Station Details
Layout
Elevated
Platform Type
Side Platform
Doors will open on the right.
Areas Around

Mayur Kunj, Sector 1 Noida, Block E New Ashok Nagar, Star City Mall

STATION AMENITIES
Divyang Friendly
Sulabh Toilet
TRAIN FREQUENCY ON
Days Peak Hours Off-Peak Hours
Monday-Friday10 min15 min
Saturday10 min15 min
Sunday10 min15 min

Metro Routes FAQs

𝒜. The first metro from Phase 2 is at 06:21 AM and the last metro is at 10:21 PM

𝒜. The travel distance is approx 30.8 Km KM

𝒜. There are 21 stations on this route.

𝒜. Approx travel time: 0 hrs 58 mins

𝒜. Yes, paid parking is available.

𝒜. Yes, feeder buses operate approx 06:00 AM – 10:00 PM (paid separately).

More routes from Phase 2

More routes from New Ashok Nagar RRTS

Saved Routes
No saved routes yet.
Tap Save Route on any route page.