Bhoj Metro Route

The Bhoj Metro is a rapid transit system serving the city of Bhopal in Madhya Pradesh, India. Currently Bhoj Metro network has 0 active stations. Find important and useful information like Bhoj Metro route, metro lines, service operation timings, first train, last train, route map, fare chart, top attractions near metro station, metro station nearby, news and more.

OperatorMadhya Pradesh Metro Rail Corporation (MPMRC)
Operation start2023
Number of lines6 Metro Lines
Train length3 Coaches

Bhoj Metro Lines & Terminal Stations 2024

Metro linesTerminal stations
Green Line
Orange Line
Red Line
Yellow Line
Blue Line
Brown Line

Bhoj Metro Route Map 2024

Official Website 🔗 | Official Map 🔗

Interesting Facts about Bhoj Metro

  • The total number of metro lines in Bhopal Metro is 06, 02 metro lines is Under Construction, and Other 04 lines proposed.
  • The total number of metro stations is 123 (approx) and in this 28 Under Construction
  • The total length of Bhopal Metro is not been disclosed yet because curretly 04 metro lines is proposed but, 27.88 km length is under construction.
  • The total number of coaches in Bhopal Metro is 3.
  • Bhopal Metro is a rapid transit system.
  • The total estimated cost of Bhopal Metro is 6941.40 cr.

About Bhoj Metro

The Bhopal Metro, also known as the Bhoj Metro project, is currently being constructed as a mass rapid transit system (MRTS) to cater to the transportation needs of Bhopal, the capital city of Madhya Pradesh, by the Madhya Pradesh Metro Rail Co Limited (MPMRCL).

The comprehensive master plan for the Bhopal Metro, spanning a distance of 105 km, was developed by Rohit Associates Cities & Rails Pvt. Ltd. It outlines the vision of establishing six metro lines that will intersect across the city. For the initial phase of implementation, two lines, namely Line 2 and Line 5, have been selected. These lines are currently in progress.

Bhopal Metro Construction work:

The Detailed Project Report (DPR) for Phase 1 of the Bhopal Metro, covering a distance of 27.90 km, received approval from the state government in December 2016 and later from the Central Government's cabinet in October 2018. However, there have been delays in the construction of the Priority Corridor, which is now anticipated to be finished and inaugurated in March 2024, surpassing the initial deadline of August 2023. The entire Phase 1 of the Bhopal Metro project is expected to be fully completed by 2027.

The project aims to receive financial support from multiple sources, including an official development assistance (ODA) loan from the Asian Development Bank (ADB) and a 400 million euro loan from the European Investment Bank (EIB), which was signed on December 20, 2019. Phase 1 of the construction work began in January 2019 and is projected to conclude in 2026. In September 2019, the state's Chief Minister laid the foundation stone for the project, affectionately known as Bhoj Metro.

Bhopal Metro Fares (Ticket Prices)

The fare structure, prices, and regulations for the Bhopal Metro have not been disclosed yet. These details will be announced closer to the commencement of operations. The Bhopal Metro Rail Corporation Limited (MPMRCL) intends to employ cutting-edge technologies for its automatic fare collection (AFC) system, enabling passengers to utilize QR codes and Near Field Communication (NFC) enabled smartphones for fare transactions.

List of Bhopal Metro Lines in 2023:
LinesTotal LengthTotal no. of Stations
Line-2 (Orange Line): Karond Circle – AIIMS15 km (Approved Line)16
Line-5 (Blue Line): Bhadbhada Square – Ratnagiri Tiraha12.88 km (Approved Line)14
Line-1 (Green Line): Bairgarh – AwadhpuriProposed Line24
Line-3 (Red Line): Bhauri Bypass (NH12 Junction) – Vasant Kunj Bus StopProposed Line24
Line-4 (Yellow Line): Ashok Garden Auto Stand – Mother Teresa SchoolProposed Line21
Line-6 (Brown Line): Habibganj Naka – MandideepProposed Line12

Bhoj Metro News & Updates 2024

2024-07-17
The work of Bhopal Metro Train Project beyond Pul Bogda will be done at night. This has been decided so that there is no hindrance in the traffic here. URC is working here for the underground line. The agency has been asked to complete its survey work at night. Here the metro line will be laid in about 3.34 km long twin tunnel from Pul Bogda to DIG. For this, boring is being done up to 40 meters deep in the ground. At many places it is up to 60 to 70 meters. This boring will be done at night, while during the day the road will be kept open for general traffic.
2023-12-18
The structure work of Bhopal Metro is going on at a very fast pace. Work on 5 stations from Subhash Nagar to AIIMS has been completed, while work on DRMA Alkapuri and AIIMS metro stations is in the final stages. Whereas, as soon as the work of three stations is completed, Madhya Pradesh Metro Company will send a letter to the CMRS team of the Railways. After this, the CMRS team will hand over the safety certificate to the company after inspection. According to Metro officials, the interior work of Subhash Nagar, Kendriya Vidyalaya, Board Office, MP Nagar and Rani Kamalapati Railway Station has been completed. While the work of metro stations of DRM, Alkapuri and AIIMS is going on in the fina
2023-12-11
Two steel bridges for Bhopal Metro have been completed in Alwar, Rajasthan. Most of their major ports have been reached. These bridges have been designed like Delhi Metro. Whose total length will be 103 meters. If Metro Corporation officials are to be believed, the work will start in January after the approval from Railways. A bridge will pass over the railway track, which will be built at the DRM office intersection.
2023-10-03
मध्य प्रदेश के मुख्यमंत्री शिवराज सिंह चौहान आज 3 अक्टूबर, मंगलवार को राजधानी भोपाल मेट्रो रेल ट्रयल रन का हरी झंडी दिखाकर शुभारंभ करेंगे. भोपाल मेट्रो रेल परियोजना की स्वीकृत लागत 6941 करोड़ रुपए है. भोपाल में पहले चरण में लगभग 30.95 किलोमीटर पर मेट्रो रेल का काम चल रहा है. इसमें 16.77 किलोमीटर ऑरेंज लाइन- एम्स से करोंद चौराहा और 14.18 किलोमीटर ब्लू लाइन- भदभदा चौराहा से रत्नागिरी तिराहे को जोड़ेगी.
2023-09-25
The first rake of Bhopal Metro has reached the depot located in Subhash Nagar. The work of assembling the coach, which was going on since Tuesday, has also been completed. Now on Monday, it will be run on the test track located in the depot, after which it will reach the viaduct with the help of metro ramp. Before this, the work of charging the third rail has also started on the trial track, with the help of which the metro will be operated.

More Bhopal Metro news and updates ..

Views: 2217