Select Stations to Find Your Route

Duhai RRTS to Phase 2 Metro Route

Fare & Timings

Normal Fare: ₹154
NCRTC ₹80 DMRC ₹54 HMRTC ₹20
Smart Card Fare: ₹141
First Train: 06:24 AM
Last Train: 10:20 AM
Powered by ixigo
26 Stations 3 Interchanges 55.4 Km 1 hrs 44 mins Difficult Route
Starts here
Line 1 Line • Platform 2 • Towards New Ashok Nagar RRTS
Change here
Pink Circular Line • Platform 2 • Via Yamuna Vihar
Change here
Yellow Line • Platform 1 • Towards Millennium City Centre (HUDA City Centre) • 10 Mins Walk
Dilli Haat INA Metro Station connects Yellow and Pink Lines via underground interchange corridors.
Change here
Rapid Line • Platform 2 • Towards Phase 3
Sikandarpur Metro Station connects Yellow Line and Rapid Metro via foot overbridge.
Ends here
Exit
View Route Map
Loading map…
100%
Scroll to zoom  ·  Drag to pan

Route Summary

How to reach Phase 2 from Duhai RRTS by metro? : Board the metro from Duhai RRTS station and travel through 26 intermediate metro stations. During the journey, you will need to change trains at 3 interchange stations before reaching Phase 2.

The approximate travel time between Duhai RRTS and Phase 2 is 1 hrs 44 mins. The total distance covered on this metro route is 55.4 Km. The first metro from Duhai RRTS departs at 06:24 AM, while the last train leaves at 10:20 AM.

The estimated metro fare for this route is ₹154. Smart card users may receive discounted fares. Parking facility is available at Duhai RRTS station.

Estimated Travel Cost Comparison and Savings based on distance & typical fares in Indian cities.

Travel Mode Estimated Cost Savings vs Metro
🚇 Metro ₹154
🏍 Bike ₹463 ₹309 more
🛺 Auto ₹695 ₹541 more
🚕 Cab ₹1,148 ₹994 more

Pre-calculated Weekly/Monthly Fare Chart

The fare shown below is calculated for daily, weekly, and monthly travel which includes both up and down journey and for a single person.

Travel Period Cash Fare Smart Card
Daily ₹308 ₹281
Weekly (5 Days) ₹1540 ₹1406
Weekly (6 Days) ₹1848 ₹1687
Weekly (7 Days) ₹2156 ₹1968
Monthly (20 Days) ₹6160 ₹5624
Monthly (24 Days) ₹7392 ₹6749
Monthly (28 Days) ₹8624 ₹7874

Taking this metro ride means

  • 🌱 Estimated Carbon Saving: 8.37 kg CO₂
  • ⛽ Fuel Saving (Petrol): 3.69 litres
  • ⏱ Time Saving in Rush Hour: 65.5 minutes
  • 🔥 Calories Burned: ~70 kcal

Safety Tips

  • Beware of pickpockets.
  • Don’t use mobile while onboard/deboard.
  • Don’t use mobile at coach gates.
  • Don’t force open the coach doors.
  • Avoid personal conversations with strangers.

Share route info feedback

Address
Duhai, Ghaziabad, Basantpur Saitli, Uttar Pradesh 201206
Network & Line
Delhi Meerut RRTS Metro / Line 1
Contact
9289928707
Station Details
Layout
Elevated
Platform Type
Side Platform
Doors will open on the right.
Areas Around

IAMR, Babu Banarsi Das Institute of Technology, BBDIT A Block, Drizzling Land

STATION AMENITIES
Parking
Divyang Friendly
Sulabh Toilet
STATION GATES
Gate no. Way to/from Divyang
1Towards Delhi end on road going to Meerut, near Drizzling Land Water Park
2Towards Meerut end on road going to Meerut, near Babu Banarasi Das Institute of Technology
3Towards Meerut end on road going to Delhi, near IAMR Group of Institution's
4Towards Delhi end on road going to Delhi
TRAIN FREQUENCY ON
Days Peak Hours Off-Peak Hours
Monday-Friday10 min15 min
Saturday10 min15 min
Sunday10 min15 min

Address
U Block, DLF Phase 2, Sector 25, Gurugram, Haryana 122002
Network & Line
Gurgaon Metro / Rapid
Contact
Station Details
Layout
Elevated
Platform Type
Side Platform
Doors will open on the right.
Areas Around

Nathupur, Balveer Market, DLF Phase 2, Shahpur, S Block

STATION AMENITIES
Divyang Friendly
STATION GATES
Gate no. Way to/from Divyang
1Towards Building no-5
2Towards Yadav Bus Service Side
TRAIN FREQUENCY ON
Days Peak Hours Off-Peak Hours
Monday-Friday
Saturday
Sunday

Metro Routes FAQs

𝒜. The first metro from Duhai RRTS is at 06:24 AM and the last metro is at 10:20 AM

𝒜. The travel distance is approx 55.4 Km KM

𝒜. There are 26 stations on this route.

𝒜. Approx travel time: 1 hrs 44 mins

𝒜. Yes, paid parking is available.

𝒜. Yes, feeder buses operate approx 06:00 AM – 10:00 PM (paid separately).

Was this page helpful?
0 people found this helpful
Saved Routes
No saved routes yet.
Tap Save Route on any route page.