Jaipur Metro Pink Line Route Map
The Pink Line is a metro line of the Jaipur Metro, a rapid transit system in Jaipur, India. It consists of 11 active stations of all Jaipur Metro network and operated by Jaipur Metro Rail Corporation (JMRC). Explore Jaipur Metro Pink Line route details like stations list, route map, interchange, fares, time and distance between source and destination, and top attractions nearby etc.
Sign: 🚆 Elevated, 🚇 Underground, 🚝 At Grade, 🅿️ Parking
Pink Line Metro Stations List 2024 | Interchange | Layout |
---|---|---|
◉ Mansarovar | ⇓ | 🚆️🅿️ |
◉ New Aatish Market | ⇅ | 🚆️🅿️ |
◉ Vivek Vihar | ⇅ | 🚆️🅿️ |
◉ Shyam Nagar | ⇅ | 🚆️🅿️ |
◉ Ram Nagar | ⇅ | 🚆️🅿️ |
◉ Civil Lines | ⇅ | 🚆️🅿️ |
◉ Railway Station | ⇅ | 🚆️🅿️ |
◉ Sindhi Camp | ⇅ ⇄ | 🚆️🅿️ |
◉ Chandpole | ⇅ | 🚇️🅿️ |
◉ Chhoti Chaupar | ⇅ | 🚇️ |
◉ Badi Chaupar | ⇑ | 🚇️ |
Jaipur Metro Pink Line Details
Line colorLine color is for indication purpose only. | Pink ▣ |
Length of linePhysical length (distance between start and end) of Pink line. | 28 KM |
Active stationsActive and functional stations count of Pink Line. | 11 stations |
Inactive stationsCount of proposed or under-construction stations for Pink line extension. | No station |
Terminal stationsStart and End Stations of Pink Line | Mansarovar ⇄ Badi Chaupar |
InterchangeNo. of lines connected or interchange count on Pink line. | 1 Interchange Stations - Sindhi Camp, |
Interesting facts about Jaipur Metro Pink line
- The Jaipur metro Pink line known by our second name is the East-West Corridor of Jaipur.
- Jaipur metro Pink line has been named as Pink Line, as the line passes through the Pink City.
- This is the Metro line that got flagged off on 3 June 2015.
- For Phase 1C, Jaipur Metro Rail Corporation (JMRC) plans to extend the Pink Line from Badi Chaupar to Transport Nagar.
- According to the extension plan of DPR, the estimated project cost will be Rs 856 crore.
- The total length of the project will be 2.85km (2.26km Underground and 0.59km Elevated).
- This project is expected to be completed by March 2025 if the construction takes place.
Jaipur Metro News & Updates 2024
Jaipur Metro Pink Line Route FAQs:
𝒜. The Jaipur Metro Pink line has total 11 stations which includes elevated, overground, and underground stations.
𝒜. The Jaipur Metro Pink line has 1 interchange stations those are connected with other lines of the metro. The name of interchange stations are: Sindhi Camp, .
𝒜. You should check the official website or offical twitter handle for this information.
𝒜. The length of Jaipur Metro Pink Line is 28 KM, and it's terminal stations are Mansarovar & Badi Chaupar.