Jaipur Metro

Jaipur Metro Green Line

Operator: Jaipur Metro Rail Corporation (JMRC)

Total Stations

0 Active / 19 Inactive

Line Length

23 km

Line Status

Inactive

Jaipur Metro Green Line Overview

The Jaipur Metro Green Line is an upcoming metro line under Phase II of the Jaipur Metro network. It features 20 stations currently under construction, aimed at enhancing connectivity across major residential and commercial zones in Jaipur. Explore complete details of the Green Line metro route, including the station list, route map, interchanges, fares, travel time, distance between stations, and top nearby attractions etc.

Jaipur Metro Green Line Station List (0 Active)

Status legend: Parking Feeder Bus Bank ATM Sulabh/Restroom

Under Construction / Planned Station
Sitapura Industrial Area
Pratap Nagar
Haldi Ghati Gate
Sanganer
Laxmi Nagar
Durgapura
Mahavir Nagar
Gopalpura
Dev Nagar
Tonk Phatak
Gandhi Nagar Mode
Sawai Mansingh Stadium
Narayan Singh Circle
Sawai Man Singh Hospital
Ajmeri Gate
Government Hostel
Sindhi Camp
Interchange
Subhash Nagar
Pani Pench
Ambabari

Jaipur Metro Green Line Map 2026

View the updated Green Line map of Jaipur Metro, featuring active stations, under-construction stations, interchanges, and the metro Green line route.

View Route Map
Loading map…
100%
Scroll to zoom  ·  Drag to pan

Jaipur Metro Fare Chart

Jaipur Metro Green Line History, Facts and Expansion Plan

Get insights about the history, facts, and expansion plans of the Jaipur Metro Green Line, including details about its development, infrastructure growth, and future improvements in connectivity.

  • The Orange Line of the Jaipur Metro is a proposed rapid transit line for the city of Jaipur, India.
  • The line is planned to run from Sitapura (near India Gate) in the south to Ambabari in the north.
  • It is 23.099 km (14.353 mi) long and will have 20 stations – 5 underground and 15 elevated.
  • The Orange Line is part of the planned Phase 2 of the Jaipur Metro system.
  • The proposed design includes standard gauge tracks and modern metro trains, aimed at providing an efficient and comfortable transportation option for passengers.
  • The line will meet the Pink Line at Sindhi Camp, creating an important interchange point for passengers.

Jaipur Metro Orange Line to be Extended in Phase 2

For Phase 2, officials have prepared a proposal for the Orange Line. The line will have a total length of 23.099 km (14.353 mi) and will include 20 stations. Five of these stations will be underground, while 15 will be elevated. The line will connect the Sitapura Industrial Area in the south to Ambabari in the north, and will pass through major areas such as Ajmeri Gate and MI Road. However, the plan may undergo changes to improve its service life before construction begins.

Jaipur Green Line Metro News & Updates

Get the news and updates for Green Line of Jaipur Metro, including operational changes, expansion plans, station upgrades, and key announcements for commuters in Jaipur.

2026-05-12 jaipur Amar Ujala

Following the receipt of central approval for the Jaipur Metro Phase-2 project, the pace of work has been further accelerated. This 41-kilometer-long metro corridor will feature 36 stations, with a total estimated cost of ₹13,500 crore—of which the Asian Development Bank (ADB) will provide a loan of approximately ₹6,565 crore to Rajasthan.

2026-04-08 Jaipur DD News

The Union Cabinet, chaired by Prime Minister Narendra Modi, has approved the Jaipur Metro Phase-2 project, a major infrastructure initiative aimed at transforming urban mobility in the Rajasthan capital. The project involves the development of a 41-kilometer north-south metro corridor from Prahladpura to Todi Mor, with 36 stations, at an estimated cost of ₹13,037.66 crore. The first phase of Jaipur's existing metro system covers 11.64 kilometers on the east-west corridor from Mansarovar to Badi Chaupar and has 11 stations. The second phase will further expand the network by adding a north-south axis, creating a more comprehensive transportation system across the city.

2026-02-17 Jaipur Patrika

Prime Minister Narendra Modi may lay the foundation stone for the second phase of the Jaipur Metro during his proposed visit to Ajmer. Although it has not yet been officially confirmed, Metro officials have begun preparations. Prime Minister Modi's visit to Ajmer is scheduled for February 28.

2026-01-12 Jaipur Metro Rail News

राजस्थान मेट्रो रेल निगम लिमिटेड (आरएमआरसी) को जयपुर मेट्रो चरण 2 के पहले सिविल अनुबंध के लिए 13 फर्मों से बोलियां प्राप्त हुई हैं। अक्टूबर 2025 में, आरएमआरसी ने इस अनुबंध के लिए 1145.14 करोड़ रुपये का निविदा जारी किया था और यह पैकेज एनसीबी: 2सी-01 के अंतर्गत आता है ।

2025-12-28 Jaipur Swarajya Marg

जयपुर मेट्रो की लाइन 2 शहर के हवाई अड्डे से कनेक्टिविटी को काफी हद तक बेहतर बनाने के लिए तैयार है, जिसमें एयरपोर्ट मेट्रो स्टेशन से सभी यात्री टर्मिनलों तक सीधे भूमिगत मार्ग की सुविधा प्रदान करने की योजना है। जयपुर मेट्रो रेल निगम (जेएमआरसी) और हवाई अड्डा अधिकारियों के बीच हाल ही में हुए परामर्श के बाद, यह पुष्टि की गई कि यात्री समर्पित सुरंगों और समर्थित शटल सेवाओं के माध्यम से मेट्रो स्टेशन और तीन टर्मिनलों के बीच आवागमन कर सकेंगे। जयपुर हवाई अड्डे पर, जो वर्तमान में दो टर्मिनल भवनों के साथ संचालित होता है, लाइन 2 के चालू होने तक एक तीसरी सुविधा भी जुड़ जाएगी।

Jaipur Metro Other Lines & Routes

Jaipur Metro operates 1 active metro lines, including the Green Line. Explore other metro lines to understand their routes, stations, interchanges, and connectivity across the Jaipur Metro network.

Was this page helpful?
0 people found this helpful
Saved Routes
No saved routes yet.
Tap Save Route on any route page.