Find Another Metro Route

Chickpete to Attiguppe Metro Route

Fare & Timings

Normal Fare: ₹30
Smart Card Fare: ₹29
First Train: 05:28 AM
Last Train: 11:33 PM
Powered by ixigo & ONDC

Station-by-Station Route

8 stations 1 interchange 5.8 km 0 hrs 10 mins
Starts here
Green Line · Platform No.: 1 · Towards: Madavara (BIEC)
Change here
Purple Line · Platform No.: 2 · Towards: Challaghatta
Ends here
Exit
  1. 1
    Start at Chickpete station.
  2. 2
    Board the Green Line towards Madavara (BIEC) · from Platform 1
    Ride 2 stops to Nadaprabhu Kempegowda station (Majestic).
    Change lines here
  3. 3
    Board the Purple Line towards Challaghatta · from Platform 2
    Ride 5 stops to Attiguppe.
  4. Arrive at Attiguppe station. You have reached your destination.

Bangalore Metro Route Map 2026

Route from Chickpete to Attiguppe on the map.

Loading map…
100%
Scroll to zoom · Drag to pan

Route Summary

How to reach Attiguppe from Chickpete by metro? Board the metro from Chickpete station and travel through 6 intermediate metro stations. During the journey, you will need to change train at 1 interchange station(s) before reaching Attiguppe.

The approximate travel time between Chickpete and Attiguppe is 0 hrs 10 mins. The total distance covered on this metro route is 5.8 Km. The first metro from Chickpete departs at 05:28 AM, while the last train leaves at 11:33 PM.

The estimated metro fare for this route is ₹30. Smart card users may receive discounted fares. Parking facility is available at both Chickpete and Attiguppe stations.

Estimated Travel Cost Comparison and Savings based on distance & typical fares in Indian cities.

ModeEst. CostSavings vs Metro
🚇 Metro₹30
🏍 Bike₹67 ₹37 more
🛺 Auto₹100 ₹70 more
🚕 Cab₹157 ₹127 more

Pre-calculated Weekly/Monthly Fare Chart

The fare shown below is calculated for daily, weekly, and monthly travel which includes both up and down journey and for a single person.

PeriodCashSmart Card
Daily₹60₹57
Weekly (5 days)₹300₹285
Weekly (6 days)₹360₹342
Weekly (7 days)₹420₹399
Monthly (20 days)₹1,200₹1,140
Monthly (24 days)₹1,440₹1,368
Monthly (28 days)₹1,680₹1,596

Metro Ride Benefits

  • 🌱 Carbon savings: 0.88 kg CO₂
  • ⛽ Fuel savings: 0.39 litres
  • ⏱ Time saved vs road: 7.5 minutes
  • 🔥 Calories burned (walk to/from station): ~70 kcal

Safety Tips

  • Stand behind the yellow line while waiting for the train.
  • Keep your belongings secure and within sight at all times.
  • Let passengers exit before boarding.
  • Hold handrails while the train is moving.
  • In an emergency, use the help point or alert station staff.
Share route info feedback
Route Info
Fare Info
Timing Info
Platform Info

Address
Old Tharagupet, Mamulpet, Chickpet, Bengaluru, Karnataka 560053
Network & Line
Bangalore Metro
Green Line
Layout
Underground
Platform
Island
Areas Around
KR Market Sultanpete Nagarathpete Cubbonpete Chickpete
Station Amenities
Parking
Accessible
Station Gates
Gate No.Way ToAccessible
A Towards Manivartapete (Sultanpete) side
B Towards KR Market side
C Towards Sultanpete side
D Towards Manivartapete side

Address
Chord Road, Govindaraja Nagar Ward, Attiguppe, Bengaluru, Karnataka 560040
Network & Line
Bangalore Metro
Purple Line
Layout
Elevated
Platform
Side
Areas Around
RPC Layout 2nd Stage Maruthi Nagar Byraveshwaranagar Attiguppe
Station Amenities
Parking
Accessible
Feeder Bus
Station Gates
Gate No.Way ToAccessible
A Attiguppe
B Chord Road
B Towards Attiguppe side with wheelchair accessibility
C Vijayanagar
C Towards Attiguppe side

Chickpete to Attiguppe Metro Route FAQs

There are 8 stations between Chickpete and Attiguppe on this metro route.

The journey from Chickpete to Attiguppe takes approximately 0 hrs 10 mins, covering a distance of about 5.8 km.
Book Metro Tickets on ixigo — First Free Metro Ticket Book Metro Tickets on ixigo — First Free Metro Ticket
Saved Routes
No saved routes yet. Tap Save Route on any route page.