Find Another Metro Route

Yeshwanthpur to Konanakunte Cross Metro Route

Fare & Timings

Normal Fare: ₹70
Smart Card Fare: ₹67
First Train: 05:18 AM
Last Train: 12:43 AM
Powered by ixigo & ONDC

Station-by-Station Route

19 stations 0 interchanges 19.4 km 0 hrs 33 mins
  1. 1
    Start at Yeshwanthpur station.
  2. 2
    Board the Green Line towards Silk Institute · from Platform 2
    Ride 19 stops to Konanakunte Cross.
  3. Arrive at Konanakunte Cross station. You have reached your destination.

Bangalore Metro Route Map 2026

Route from Yeshwanthpur to Konanakunte Cross on the map.

Loading map…
100%
Scroll to zoom · Drag to pan

Route Summary

How to reach Konanakunte Cross from Yeshwanthpur by metro? Board the metro from Yeshwanthpur station and travel through 17 intermediate metro stations. This is a direct route on the same line, with no train change required before reaching Konanakunte Cross.

The approximate travel time between Yeshwanthpur and Konanakunte Cross is 0 hrs 33 mins. The total distance covered on this metro route is 19.4 Km. The first metro from Yeshwanthpur departs at 05:18 AM, while the last train leaves at 12:43 AM.

The estimated metro fare for this route is ₹70. Smart card users may receive discounted fares. Parking facility is not available at either Yeshwanthpur or Konanakunte Cross station.

Estimated Travel Cost Comparison and Savings based on distance & typical fares in Indian cities.

ModeEst. CostSavings vs Metro
🚇 Metro₹70
🏍 Bike₹175 ₹105 more
🛺 Auto₹263 ₹193 more
🚕 Cab₹428 ₹358 more

Pre-calculated Weekly/Monthly Fare Chart

The fare shown below is calculated for daily, weekly, and monthly travel which includes both up and down journey and for a single person.

PeriodCashSmart Card
Daily₹140₹133
Weekly (5 days)₹700₹665
Weekly (6 days)₹840₹798
Weekly (7 days)₹980₹931
Monthly (20 days)₹2,800₹2,660
Monthly (24 days)₹3,360₹3,192
Monthly (28 days)₹3,920₹3,724

Metro Ride Benefits

  • 🌱 Carbon savings: 2.93 kg CO₂
  • ⛽ Fuel savings: 1.29 litres
  • ⏱ Time saved vs road: 25.0 minutes
  • 🔥 Calories burned (walk to/from station): ~70 kcal

Safety Tips

  • Stand behind the yellow line while waiting for the train.
  • Keep your belongings secure and within sight at all times.
  • Let passengers exit before boarding.
  • Hold handrails while the train is moving.
  • In an emergency, use the help point or alert station staff.
Share route info feedback
Route Info
Fare Info
Timing Info
Platform Info

Address
Tumkur Main Road, Yeshwanthpur Industrial Area, Bengaluru, Karnataka 560022
Network & Line
Bangalore Metro
Green Line
Layout
Elevated
Platform
Side
Areas Around
APMC Yard Subedarpalya Kamla Nehru Extension HMT Layout Yeshwantpur Yeshwanthpura Yeshwanthpur
Station Amenities
Accessible
IR Connect
ATM
Station Gates
Gate No.Way ToAccessible
A
B
C
D
E Connects directly to the Yesvantpur Junction Railway Station (Platform 6) via a dedicated skywalk, making train transfers highly convenient
F
G

Address
Anjanadri Layout, Konanakunte, Bengaluru, Karnataka 560062
Network & Line
Bangalore Metro
Green Line
Layout
Elevated
Platform
Side
Areas Around
Manasa Theater Mango Garden Layout Ganapathipura Konanakunte Anjanadri Layout Konanakunte Cross
Station Amenities
Accessible
Station Gates
Gate No.Way ToAccessible
A Towards Prestige Falcon City side
B Towards Siddalingappa Memorial Hospital side

Yeshwanthpur to Konanakunte Cross Metro Route FAQs

There are 19 stations between Yeshwanthpur and Konanakunte Cross on this metro route.

No, Yeshwanthpur to Konanakunte Cross is a direct route on the same line — no train change is needed.

The journey from Yeshwanthpur to Konanakunte Cross takes approximately 0 hrs 33 mins, covering a distance of about 19.4 km.

No, parking facility is not available at Yeshwanthpur metro station.

No, parking facility is not available at Konanakunte Cross metro station.
Book Metro Tickets on ixigo — First Free Metro Ticket Book Metro Tickets on ixigo — First Free Metro Ticket
Saved Routes
No saved routes yet. Tap Save Route on any route page.