Select Stations to Find Your Route
Agra Metro Yellow Line
Total Stations
6 Active / 8 Inactive
Line Length
14.27 km
Line Status
Active
Terminal Station
Taj East Gate Mankameshwar
Agra Metro Yellow Line Overview
Agra Metro Yellow Line Station List (6 Active)
Status legend: Parking Feeder Bus Bank ATM Sulabh/Restroom
| Active Metro Station | Station Amenities |
|---|---|
| Taj East Gate | . . . |
| Shahid Captain Shubham Gupta (Basai) | . . . |
| Fatehabad Road | . . . |
| Taj Mahal | . . . |
| Agra Fort | . . . |
| Mankameshwar | . . . |
Agra Metro Yellow Line Map 2026
View the updated Yellow Line map of Agra Metro, featuring active stations, under-construction stations, interchanges, and the metro Yellow line route.
Agra Metro Fare Chart
Agra Metro Yellow Line History, Facts and Expansion Plan
Get insights about the history, facts, and expansion plans of the Agra Metro Yellow Line, including details about its development, infrastructure growth, and future improvements in connectivity.
- The Yellow Line of the Agra Metro, also known as Line 1, is part of the Agra Metro network.
- The first section of the line opened on 6 March 2024.
- The Yellow Line is 14.27 km long and has 14 stations, including 6.57 km of elevated track and 7.68 km of underground section. Major stations include Sikandra, Guru Ka Tal, Taj Mahal and Agra Fort.
Agra Metro Network Yellow Line Extension in Phase 1
The remaining section is being extended from Sikandra to Mankameshwar Temple under the Agra Metro's Yellow Line Extension Project. This extension is part of Agra Metro's Phase 1, which is expected to be completed by 2026.
Agra Metro Yellow Line FAQs
Find answers to common Yellow Line FAQs of Agra Metro, covering stations, interchange points with other lines, timings, travel durations etc.
Agra Metro Yellow Line Timings
Agra Metro Yellow Line runs on regular schedule throughout the week between Taj East Gate and Mankameshwar.
Agra Metro Yellow Line Timings from Monday to Saturday:
- First train: 06:00:00 AM (Taj East Gate to Mankameshwar) | 06:00:00 AM (Mankameshwar to Taj East Gate)
- Last train: 22:00:00 PM
Agra Metro Yellow Line Timings on Sunday:
- First train: 06:00:00 AM (Taj East Gate to Mankameshwar) | 06:00:00 (Mankameshwar to Taj East Gate)
- Last train: 22:00:00 PM
Agra Yellow Line Metro News & Updates
Get the news and updates for Yellow Line of Agra Metro, including operational changes, expansion plans, station upgrades, and key announcements for commuters in Agra.
The Uttar Pradesh Metro Rail Corporation (UPMRC) plans to commission 12 metro stations in Agra by December. To this end, work on both corridors has been accelerated, and the deployment of machinery has also been increased. Track laying and civil engineering works are proceeding at a rapid pace, and weekly progress reports are being compiled. Panchanan Mishra, Deputy General Manager at UPMRC, stated that the first corridor is scheduled to be completed by December. This corridor comprises 12 stations; currently, metro services are operational across a stretch of six stations, extending from Taj East to Mankameshwar. Metro train operations on the subsequent five stations—up to the ISBT—are set to commence next month. Furthermore, construction work is progressing rapidly on the two stations immediately following this stretch: Guru Ka Tal and Sikandra. These stations are also expected to be ready by December, at which point metro train services will begin operating there as well.
आगरा मेट्रो प्रोजेक्ट में तरक्की हुई है, क्योंकि एफकॉन्स-SAM इंडिया टीम ने आगरा मेट्रो की लाइन 1 पर टेस्ट रन किया। यह लाइन सिकंदरा से ताज ईस्ट गेट तक 14.25 km तक फैली है और इसमें 14 स्टेशन हैं। एफकॉन्स-SAM इंडिया टीम ने मनकामेश्वर मेट्रो स्टेशन और ISBT के बीच लाइन 1 (अपलाइन कॉरिडोर) के 6 किलोमीटर के हिस्से पर सफल टेस्ट किए। इन टेस्ट के दौरान उत्तर प्रदेश मेट्रो रेल कॉर्पोरेशन (UPMRC) के सीनियर अधिकारी मौजूद थे।
आगरा मेट्रो के लिए उत्तर प्रदेश मेट्रो रेल कॉरपोरेशन की टीम 48 घंटे के अंदर आईएसबीटी से लेकर बिजली घर चौराहा तक अप लाइन में मेट्रो का ट्रायल करने जा रही है। सोमवार दोपहर बाद लखनऊ से उच्च अधिकारी आगरा आ जाएंगे और सबसे पहले ट्रैक का निरीक्षण करेंगे इसके बाद 1 से 2 मेट्रो का संचालन किया जाएगा। मेट्रो का परीक्षण दो माह तक चलेगा शुरुआत में मेट्रो की गति 10 किलोमीटर प्रति घंटा होगी जिसे बाद में बढ़कर 90 किलोमीटर किया जाएगा। डाउन लाइन पर मेट्रो का ट्रायल जनवरी से शुरू होगा। कारपोरेशन के एक अधिकारी ने बताया कि होली के आसपास मेट्रो का संचालन शुरू करने का प्रस्ताव तैयार किया गया है।
The Uttar Pradesh Metro Rail Corporation (UPMRC) is currently under construction on a metro project in Agra, costing approximately ₹8,000 crore. Construction work has been completed from the RBS College Metro Station to the Khandari Ramp, part of the first corridor from Sikandra to the Taj East Gate. Track laying is also progressing rapidly. The RBS College Metro Station will provide improved connectivity for commuters traveling to and from nearby areas such as Delhi Gate and Sanjay Place. Similarly, work on the SN Medical College Metro Station, Agra College Metro Station, and Raja Ki Mandi Metro Station has also reached its final stages.
Metro construction is underway on MG Road in Agra. The divider has been barricaded. During the day, increased traffic creates traffic jams. At night, the numerous Metro cranes operating at the site cause problems, forcing traffic to be halted. Vehicles are forced to take alternate routes. This makes a five-minute journey take up to half an hour.
Top Attractions covered by Agra Metro Yellow Line
Explore top tourist attractions, popular monuments, cultural sites, and landmarks near the Agra Metro Yellow Line, that easily accessible via Agra Yellow Line metro.
Agra Metro Other Lines & Routes
Agra Metro operates 1 active metro lines, including the Yellow Line. Explore other metro lines to understand their routes, stations, interchanges, and connectivity across the Agra Metro network.
Saved Routes
Tap Save Route on any route page.

