Find Another Metro Route

Anand Nagar to Marol Naka Metro Route

Fare & Timings

Normal Fare: ₹40
Smart Card Fare: ₹38
First Train: 06:32 AM
Last Train: 10:56 PM
Powered by ixigo & ONDC
23 stations 1 interchange 23.1 km 0 hrs 43 mins
  1. 1
    Start at Anand Nagar station.
  2. 2
    Board the Yellow Line towards Andheri West · from Platform 2
    Ride 16 stops to Andheri West.
    Change lines here
  3. 3
    Board the Blue Line towards Andheri West · from Platform 1
    Ride 7 stops to Marol Naka.
  4. Arrive at Marol Naka station. You have reached your destination.
21 stations 2 interchanges 18.8 km 0 hrs 35 mins
Starts here
Yellow Line · Platform No.: 1 · Towards: Dahisar East
Change here
Red Line · Platform No.: 2 · Towards: Gundavali
Change here
Blue Line · Platform No.: 1 · Towards: Ghatkopar
Ends here
Exit
  1. 1
    Start at Anand Nagar station.
  2. 2
    Board the Yellow Line towards Dahisar East · from Platform 1
    Ride 2 stops to Dahisar East.
    Change lines here
  3. 3
    Board the Red Line towards Gundavali · from Platform 2
    Ride 14 stops to Western Express Highway.
    Change lines here
  4. 4
    Board the Blue Line towards Ghatkopar · from Platform 1
    Ride 3 stops to Marol Naka.
  5. Arrive at Marol Naka station. You have reached your destination.

Mumbai Metro Route Map 2026

Route from Anand Nagar to Marol Naka on the map.

Loading map…
100%
Scroll to zoom · Drag to pan

Route Summary

How to reach Marol Naka from Anand Nagar by metro? Board the metro from Anand Nagar station and travel through 21 intermediate metro stations. During the journey, you will need to change train at 1 interchange station(s) before reaching Marol Naka.

The approximate travel time between Anand Nagar and Marol Naka is 0 hrs 43 mins. The total distance covered on this metro route is 23.1 Km. The first metro from Anand Nagar departs at 06:32 AM, while the last train leaves at 10:56 PM.

The estimated metro fare for this route is ₹40. Smart card users may receive discounted fares. Parking facility is not available at either Anand Nagar or Marol Naka station.

Estimated Travel Cost Comparison and Savings based on distance & typical fares in Indian cities.

ModeEst. CostSavings vs Metro
🚇 Metro₹40
🏍 Bike₹205 ₹165 more
🛺 Auto₹308 ₹268 more
🚕 Cab₹503 ₹463 more

Pre-calculated Weekly/Monthly Fare Chart

The fare shown below is calculated for daily, weekly, and monthly travel which includes both up and down journey and for a single person.

PeriodCashSmart Card
Daily₹80₹76
Weekly (5 days)₹400₹380
Weekly (6 days)₹480₹456
Weekly (7 days)₹560₹532
Monthly (20 days)₹1,600₹1,520
Monthly (24 days)₹1,920₹1,824
Monthly (28 days)₹2,240₹2,128

Metro Ride Benefits

  • 🌱 Carbon savings: 3.49 kg CO₂
  • ⛽ Fuel savings: 1.54 litres
  • ⏱ Time saved vs road: 26.0 minutes
  • 🔥 Calories burned (walk to/from station): ~70 kcal

Safety Tips

  • Stand behind the yellow line while waiting for the train.
  • Keep your belongings secure and within sight at all times.
  • Let passengers exit before boarding.
  • Hold handrails while the train is moving.
  • In an emergency, use the help point or alert station staff.
Share route info feedback
Route Info
Fare Info
Timing Info
Platform Info

Address
Anand Nagar, Dahisar East, Mumbai, Maharashtra 400068
Network & Line
Mumbai Metro
Yellow Line
Layout
Elevated
Platform
Side
Areas Around
Nl Complex Avdhut Nagar Ashish Complex Siddhi Vinayak Nagar Anand Nagar
Station Amenities
Accessible
Train Frequency
PeakOff-Peak
Weekdays 3.5 min 8 min
Saturday 3.5 min 8 min
Sunday 8 min 8 min

Address
Andheri - Kurla Rd, near Fire Brigade, Gamdevi, Marol, Andheri (E, Mumbai, Maharashtra 400059)
Network & Line
Mumbai Metro
Blue Line
Layout
Elevated
Platform
Side
Areas Around
Sag Baug Chimatpada Marol Naka
Station Amenities
Accessible
Station Gates
Gate No.Way ToAccessible
1 Near We Work, Pearl Academy
1A Towards Fire Brigade, Seven Hills Hospital
2 Near SM Centre
3 Towards Mittal Industrial Estate, Litolier Chamber
4 Medicare Hospital
5 Towards Mumbai International Airport
Train Frequency
PeakOff-Peak
Weekdays 3.5 min 8 min
Saturday 3.5 min 8 min
Sunday 8 min 8 min

Anand Nagar to Marol Naka Metro Route FAQs

There are 23 stations between Anand Nagar and Marol Naka on this metro route.

The journey from Anand Nagar to Marol Naka takes approximately 0 hrs 43 mins, covering a distance of about 23.1 km.

No, parking facility is not available at Anand Nagar metro station.

No, parking facility is not available at Marol Naka metro station.
Book Metro Tickets on ixigo — First Free Metro Ticket Book Metro Tickets on ixigo — First Free Metro Ticket
Saved Routes
No saved routes yet. Tap Save Route on any route page.