Find Another Metro Route

Attiguppe to Challaghatta Metro Route

Fare & Timings

Normal Fare: ₹60
Smart Card Fare: ₹57
First Train: 05:54 AM
Last Train: 11:39 PM
Powered by ixigo & ONDC

Station-by-Station Route

10 stations 0 interchanges 13 km 0 hrs 22 mins
  1. 1
    Start at Attiguppe station.
  2. 2
    Board the Purple Line towards Challaghatta · from Platform 2
    Ride 10 stops to Challaghatta.
  3. Arrive at Challaghatta station. You have reached your destination.

Bangalore Metro Route Map 2026

Route from Attiguppe to Challaghatta on the map.

Loading map…
100%
Scroll to zoom · Drag to pan

Route Summary

How to reach Challaghatta from Attiguppe by metro? Board the metro from Attiguppe station and travel through 8 intermediate metro stations. This is a direct route on the same line, with no train change required before reaching Challaghatta.

The approximate travel time between Attiguppe and Challaghatta is 0 hrs 22 mins. The total distance covered on this metro route is 13 Km. The first metro from Attiguppe departs at 05:54 AM, while the last train leaves at 11:39 PM.

The estimated metro fare for this route is ₹60. Smart card users may receive discounted fares. Parking facility is available at Attiguppe station.

Estimated Travel Cost Comparison and Savings based on distance & typical fares in Indian cities.

ModeEst. CostSavings vs Metro
🚇 Metro₹60
🏍 Bike₹124 ₹64 more
🛺 Auto₹186 ₹126 more
🚕 Cab₹300 ₹240 more

Pre-calculated Weekly/Monthly Fare Chart

The fare shown below is calculated for daily, weekly, and monthly travel which includes both up and down journey and for a single person.

PeriodCashSmart Card
Daily₹120₹114
Weekly (5 days)₹600₹570
Weekly (6 days)₹720₹684
Weekly (7 days)₹840₹798
Monthly (20 days)₹2,400₹2,280
Monthly (24 days)₹2,880₹2,736
Monthly (28 days)₹3,360₹3,192

Metro Ride Benefits

  • 🌱 Carbon savings: 1.96 kg CO₂
  • ⛽ Fuel savings: 0.87 litres
  • ⏱ Time saved vs road: 16.7 minutes
  • 🔥 Calories burned (walk to/from station): ~70 kcal

Safety Tips

  • Stand behind the yellow line while waiting for the train.
  • Keep your belongings secure and within sight at all times.
  • Let passengers exit before boarding.
  • Hold handrails while the train is moving.
  • In an emergency, use the help point or alert station staff.
Share route info feedback
Route Info
Fare Info
Timing Info
Platform Info

Address
Chord Road, Govindaraja Nagar Ward, Attiguppe, Bengaluru, Karnataka 560040
Network & Line
Bangalore Metro
Purple Line
Layout
Elevated
Platform
Side
Areas Around
RPC Layout 2nd Stage Maruthi Nagar Byraveshwaranagar Attiguppe
Station Amenities
Parking
Accessible
Feeder Bus
Station Gates
Gate No.Way ToAccessible
A Attiguppe
B Chord Road
B Towards Attiguppe side with wheelchair accessibility
C Vijayanagar
C Towards Attiguppe side

Address
Mysore Main Road, Mysore Road, BSM Extension, Kengeri Satellite Town, Bengaluru, Karnataka 560060
Network & Line
Bangalore Metro
Purple Line
Layout
Elevated
Platform
Side
Areas Around
Kengeri Hobli Anchepalya ACS College RajaRajeswari Medical College Challaghatta
Station Amenities
Accessible
Station Gates
Gate No.Way ToAccessible
A Towards the Mysore Road side
B Towards the Kengeri side

Attiguppe to Challaghatta Metro Route FAQs

There are 10 stations between Attiguppe and Challaghatta on this metro route.

No, Attiguppe to Challaghatta is a direct route on the same line — no train change is needed.

The journey from Attiguppe to Challaghatta takes approximately 0 hrs 22 mins, covering a distance of about 13 km.

No, parking facility is not available at Challaghatta metro station.
Book Metro Tickets on ixigo — First Free Metro Ticket Book Metro Tickets on ixigo — First Free Metro Ticket
Saved Routes
No saved routes yet. Tap Save Route on any route page.