Find Another Metro Route

Bengal Chemical to Kavi Sukanta Metro Route

Fare & Timings

Normal Fare: ₹40
Smart Card Fare: ₹32
First Train: 07:04 AM
Last Train: 09:42 PM

Station-by-Station Route

24 stations 2 interchanges 27.4 km 0 hrs 55 mins
  1. 1
    Start at Bengal Chemical station.
  2. 2
    Board the Green Line towards Howrah Maidan · from Platform 2
    Ride 5 stops to Esplanade.
    Change lines here
  3. 3
    Board the Blue Line towards Kavi Subhash (New Garia) · from Platform 2
    Ride 14 stops to Kavi Subhash (New Garia).
    Change lines here Park Street Metro Station links Blue Line and Green Line through an internal corridor
  4. 4
    Board the Orange Line towards Beliaghata · from Platform 3
    Ride 3 stops to Kavi Sukanta.
  5. Arrive at Kavi Sukanta station. You have reached your destination.

Kolkata Metro Route Map 2026

Route from Bengal Chemical to Kavi Sukanta on the map.

Loading map…
100%
Scroll to zoom · Drag to pan

Route Summary

How to reach Kavi Sukanta from Bengal Chemical by metro? Board the metro from Bengal Chemical station and travel through 22 intermediate metro stations. During the journey, you will need to change train at 2 interchange station(s) before reaching Kavi Sukanta.

The approximate travel time between Bengal Chemical and Kavi Sukanta is 0 hrs 55 mins. The total distance covered on this metro route is 27.4 Km. The first metro from Bengal Chemical departs at 07:04 AM, while the last train leaves at 09:42 PM.

The estimated metro fare for this route is ₹40. Smart card users may receive discounted fares. Parking facility is not available at either Bengal Chemical or Kavi Sukanta station.

Estimated Travel Cost Comparison and Savings based on distance & typical fares in Indian cities.

ModeEst. CostSavings vs Metro
🚇 Metro₹40
🏍 Bike₹239 ₹199 more
🛺 Auto₹358 ₹318 more
🚕 Cab₹587 ₹547 more

Pre-calculated Weekly/Monthly Fare Chart

The fare shown below is calculated for daily, weekly, and monthly travel which includes both up and down journey and for a single person.

PeriodCashSmart Card
Daily₹80₹64
Weekly (5 days)₹400₹320
Weekly (6 days)₹480₹384
Weekly (7 days)₹560₹448
Monthly (20 days)₹1,600₹1,280
Monthly (24 days)₹1,920₹1,536
Monthly (28 days)₹2,240₹1,792

Metro Ride Benefits

  • 🌱 Carbon savings: 4.13 kg CO₂
  • ⛽ Fuel savings: 1.82 litres
  • ⏱ Time saved vs road: 27.4 minutes
  • 🔥 Calories burned (walk to/from station): ~70 kcal

Safety Tips

  • Stand behind the yellow line while waiting for the train.
  • Keep your belongings secure and within sight at all times.
  • Let passengers exit before boarding.
  • Hold handrails while the train is moving.
  • In an emergency, use the help point or alert station staff.
Share route info feedback
Route Info
Fare Info
Timing Info
Platform Info

Address
SH 3, Kadapara, Phool Bagan, Kankurgachi, Kolkata, West Bengal 700054
Network & Line
Kolkata Metro
Green Line
Layout
Elevated
Platform
Side
Areas Around
FB Block Bidhannagar DA Block Bidhannagar Bengal Chemical
Station Amenities
Accessible
ATM

Address
Sector H, East Kolkata Twp, Kolkata, West Bengal 700107
Network & Line
Kolkata Metro
Orange Line
Layout
Elevated
Platform
Side
Areas Around
Purbachal Kalitala Madurdaha Sector H East Kolkata Purbachal Kavi Sukanta
Station Amenities
Accessible

Bengal Chemical to Kavi Sukanta Metro Route FAQs

There are 24 stations between Bengal Chemical and Kavi Sukanta on this metro route.

The journey from Bengal Chemical to Kavi Sukanta takes approximately 0 hrs 55 mins, covering a distance of about 27.4 km.

No, parking facility is not available at Bengal Chemical metro station.

No, parking facility is not available at Kavi Sukanta metro station.
Book Metro Tickets on ixigo — First Free Metro Ticket Book Metro Tickets on ixigo — First Free Metro Ticket
Saved Routes
No saved routes yet. Tap Save Route on any route page.