Find a BMRC Route

Beratena Agarhara to Sri Balagangadharanatha Swamiji Station (Hosahalli) Metro Route

Beratena Agarhara Metro Station is — km away from you

Fare & Timings

Normal Fare: ₹70
Smart Card Fare: ₹67
First Train: 05:10 AM
Last Train: 10:55 PM
Powered by ixigo & ONDC
23 stations 2 interchanges 19.9 km 0 hrs 34 mins
  1. 1
    Start at Beratena Agarhara station.
  2. 2
    Board the Yellow Line towards Rashtreeya Vidyalaya Road · from Platform 1
    Ride 11 stops to Rashtreeya Vidyalaya Road.
    Change lines here
  3. 3
    Board the Green Line towards Madavara (BIEC) · from Platform 1
    Ride 7 stops to Nadaprabhu Kempegowda station (Majestic).
    Change lines here
  4. 4
    Board the Purple Line towards Challaghatta · from Platform 2
    Ride 3 stops to Sri Balagangadharanatha Swamiji Station (Hosahalli).
  5. Arrive at Sri Balagangadharanatha Swamiji Station (Hosahalli) station. You have reached your destination. Exit Gates
22 stations 2 interchanges 23.3 km 0 hrs 40 mins
  1. 1
    Start at Beratena Agarhara station.
  2. 2
    Board the Yellow Line towards Rashtreeya Vidyalaya Road · from Platform 1
    Ride 11 stops to Rashtreeya Vidyalaya Road.
    Change lines here
  3. 3
    Board the Green Line towards Madavara (BIEC) · from Platform 1
    Ride 7 stops to Nadaprabhu Kempegowda station (Majestic).
    Change lines here Rashtreeya Vidyalaya Road Metro Station connects Green Line and Yellow Line via direct interchange.
  4. 4
    Board the Purple Line towards Challaghatta · from Platform 2
    Ride 3 stops to Sri Balagangadharanatha Swamiji Station (Hosahalli).
  5. Arrive at Sri Balagangadharanatha Swamiji Station (Hosahalli) station. You have reached your destination. Exit Gates

Bangalore Metro Route Map 2026

Route from Beratena Agarhara to Sri Balagangadharanatha Swamiji Station (Hosahalli) on the map.

Download JPG
Loading map…
100%
Ctrl + Scroll to zoom · Drag to pan

Route Summary

How to reach Sri Balagangadharanatha Swamiji Station (Hosahalli) from Beratena Agarhara by metro? Board the metro from Beratena Agarhara station and travel through 21 intermediate metro stations. During the journey, you will need to change train at 2 interchange station(s) before reaching Sri Balagangadharanatha Swamiji Station (Hosahalli).

The approximate travel time between Beratena Agarhara and Sri Balagangadharanatha Swamiji Station (Hosahalli) is 0 hrs 34 mins. The total distance covered on this metro route is 19.9 Km. The first metro from Beratena Agarhara departs at 05:10 AM, while the last train leaves at 10:55 PM.

The estimated metro fare for this route is ₹70. Smart card users may receive discounted fares. Parking facility is available at Sri Balagangadharanatha Swamiji Station (Hosahalli) station.

Estimated Travel Cost Comparison and Savings based on distance & typical fares in Indian cities.

ModeEst. CostSavings vs Metro
🚇 Metro₹70—
🏍 Bike₹179 ₹109 more
🛺 Auto₹269 ₹199 more
🚕 Cab₹438 ₹368 more
Powered by ixigo & ONDC

Pre-calculated Weekly/Monthly Fare Chart

The fare shown below is calculated for daily, weekly, and monthly travel which includes both up and down journey and for a single person.

PeriodCashSmart Card
Daily₹140₹133
Weekly (5 days)₹700₹665
Weekly (6 days)₹840₹798
Weekly (7 days)₹980₹931
Monthly (20 days)₹2,800₹2,660
Monthly (24 days)₹3,360₹3,192
Monthly (28 days)₹3,920₹3,724

Commuting with a Bangalore Metro Smart Card saves up to ₹196 per month on this route.

Metro Ride Benefits

  • Carbon savings: 3.01 kg CO₂
  • Fuel savings: 1.33 litres
  • Time saved vs road: 25.6 minutes
  • Calories burned (walk to/from station): ~70 kcal

Safety Tips

  • Stand behind the yellow line while waiting for the train.
  • Keep your belongings secure and within sight at all times.
  • Let passengers exit before boarding.
  • Hold handrails while the train is moving.
  • In an emergency, use the help point or alert station staff.
Share route info feedback
Route Info
Fare Info
Timing Info
Platform Info

Address
Pragathi Nagar, Basapura, Bengaluru, Karnataka 560100
Line & Network
Yellow Line Bangalore Metro
Layout
Elevated (Side)
Areas Around
PES University Naganathapura Doctor Layout Shushruthi Nagar Beratena Agarhara
Station Amenities
Accessible
Train Frequency
PeakOff-Peak
Weekdays 9 min 14 min
Saturday 9 min 14 min
Sunday 9 min 14 min

Address
Chord Road, Govindaraja Nagar Ward, Stage 1, Vijayanagar, Bengaluru, Karnataka 560040
Line & Network
Purple Line Bangalore Metro
Layout
Elevated (Side)
Areas Around
Cholourpalya DMart Vijayanagar Veeresh Cinemas MC Layout Sri Balagangadharanatha Swamiji Station (Hosahalli)
Station Amenities
Parking
Accessible

Beratena Agarhara to Sri Balagangadharanatha Swamiji Station (Hosahalli) Metro Route FAQs

There are 23 stations between Beratena Agarhara and Sri Balagangadharanatha Swamiji Station (Hosahalli) on this metro route, spanning a total distance of approximately 19.9 km from end to end.

Yes, this journey starts on the Yellow Line from Beratena Agarhara and ends on the Purple Line at Sri Balagangadharanatha Swamiji Station (Hosahalli), so you will need to interchange 2 time(s) along the way.

The journey from Beratena Agarhara to Sri Balagangadharanatha Swamiji Station (Hosahalli) takes approximately 0 hrs 34 mins at an average metro speed of around 35 km/h, covering 19.9 km in total.

This entire route from Beratena Agarhara to Sri Balagangadharanatha Swamiji Station (Hosahalli) runs on Bangalore Metro.

No, parking facility is not currently available at Beratena Agarhara metro station, so if you are boarding the Yellow Line here, consider a drop-off or nearby alternate parking option.

Yes, parking facility is available at Sri Balagangadharanatha Swamiji Station (Hosahalli) metro station, making it convenient for passengers arriving from Beratena Agarhara to leave their vehicle if they plan to drive onward afterwards.

The total distance between Beratena Agarhara and Sri Balagangadharanatha Swamiji Station (Hosahalli) on this metro route is approximately 19.9 km, covered in about 0 hrs 34 mins at typical metro speeds.

Take the Yellow Line from Beratena Agarhara towards Sri Balagangadharanatha Swamiji Station (Hosahalli) on Bangalore Metro.

The estimated normal fare from Beratena Agarhara to Sri Balagangadharanatha Swamiji Station (Hosahalli) is ₹70, while smart card users can travel the same 19.9 km route for around ₹67.

The first metro from Beratena Agarhara towards Sri Balagangadharanatha Swamiji Station (Hosahalli) departs at 05:10 AM, and the last train on this route leaves at 10:55 PM, so plan your journey within this window.
Book Metro Tickets on ixigo — First Free Metro Ticket Book Metro Tickets on ixigo — First Free Metro Ticket
Saved Routes
No saved routes yet. Tap Save Route on any route page.