Find a KMRC Route

Central Park to Mahanayak Uttam Kumar (Tollygunge) Metro Route

Central Park Metro Station is — km away from you

Fare & Timings

Normal Fare: ₹30
Smart Card Fare: ₹24
First Train: 07:00 AM
Last Train: 09:46 PM

Station-by-Station Route

16 stations 1 interchange 16.2 km 0 hrs 32 mins
  1. 1
    Start at Central Park station.
  2. 2
    Board the Green Line towards Howrah Maidan · from Platform 2
    Ride 7 stops to Esplanade.
    Change lines here
  3. 3
    Board the Blue Line towards Kavi Subhash (New Garia) · from Platform 2
    Ride 8 stops to Mahanayak Uttam Kumar (Tollygunge).
  4. Arrive at Mahanayak Uttam Kumar (Tollygunge) station. You have reached your destination.

Kolkata Metro Route Map 2026

Route from Central Park to Mahanayak Uttam Kumar (Tollygunge) on the map.

Download JPG
Loading map…
100%
Ctrl + Scroll to zoom · Drag to pan

Route Summary

How to reach Mahanayak Uttam Kumar (Tollygunge) from Central Park by metro? Board the metro from Central Park station and travel through 14 intermediate metro stations. During the journey, you will need to change train at 1 interchange station(s) before reaching Mahanayak Uttam Kumar (Tollygunge).

The approximate travel time between Central Park and Mahanayak Uttam Kumar (Tollygunge) is 0 hrs 32 mins. The total distance covered on this metro route is 16.2 Km. The first metro from Central Park departs at 07:00 AM, while the last train leaves at 09:46 PM.

The estimated metro fare for this route is ₹30. Smart card users may receive discounted fares. Parking facility is available at Mahanayak Uttam Kumar (Tollygunge) station.

Estimated Travel Cost Comparison and Savings based on distance & typical fares in Indian cities.

ModeEst. CostSavings vs Metro
🚇 Metro₹30—
🏍 Bike₹150 ₹120 more
🛺 Auto₹225 ₹195 more
🚕 Cab₹364 ₹334 more

Pre-calculated Weekly/Monthly Fare Chart

The fare shown below is calculated for daily, weekly, and monthly travel which includes both up and down journey and for a single person.

PeriodCashSmart Card
Daily₹60₹48
Weekly (5 days)₹300₹240
Weekly (6 days)₹360₹288
Weekly (7 days)₹420₹336
Monthly (20 days)₹1,200₹960
Monthly (24 days)₹1,440₹1,152
Monthly (28 days)₹1,680₹1,344

Commuting with a Kolkata Metro Smart Card saves up to ₹336 per month on this route.

Metro Ride Benefits

  • Carbon savings: 2.45 kg CO₂
  • Fuel savings: 1.08 litres
  • Time saved vs road: 16.2 minutes
  • Calories burned (walk to/from station): ~70 kcal

Safety Tips

  • Stand behind the yellow line while waiting for the train.
  • Keep your belongings secure and within sight at all times.
  • Let passengers exit before boarding.
  • Hold handrails while the train is moving.
  • In an emergency, use the help point or alert station staff.
Share route info feedback
Route Info
Fare Info
Timing Info
Platform Info

Address
DF Block, Sector 1, Bidhannagar, Kolkata, West Bengal 700064
Line & Network
Green Line Kolkata Metro
Layout
Elevated (Side)
Areas Around
CF Block Bidhannagar Sector II Bidhannagar BF Block Bidhannagar Central Park
Station Amenities
Accessible
ATM

Address
Deshpran Sasmal Road, Tollygunge Golf Club, Tollygunge, Kolkata, West Bengal 700040
Line & Network
Blue Line Kolkata Metro
Layout
At Grade (Side)
Areas Around
Jubilee Park Tollygunge Rajendra Prasad Colony Navina Cinema Sirity Mahanayak Uttam Kumar (Tollygunge)
Station Amenities
Parking
Accessible
ATM

Central Park to Mahanayak Uttam Kumar (Tollygunge) Metro Route FAQs

There are 16 stations between Central Park and Mahanayak Uttam Kumar (Tollygunge) on this metro route, spanning a total distance of approximately 16.2 km from end to end.

Yes, this journey starts on the Green Line from Central Park and ends on the Blue Line at Mahanayak Uttam Kumar (Tollygunge), so you will need to interchange 1 time(s) along the way.

The journey from Central Park to Mahanayak Uttam Kumar (Tollygunge) takes approximately 0 hrs 32 mins at an average metro speed of around 30 km/h, covering 16.2 km in total.

This entire route from Central Park to Mahanayak Uttam Kumar (Tollygunge) runs on Kolkata Metro.

No, parking facility is not currently available at Central Park metro station, so if you are boarding the Green Line here, consider a drop-off or nearby alternate parking option.

Yes, parking facility is available at Mahanayak Uttam Kumar (Tollygunge) metro station, making it convenient for passengers arriving from Central Park to leave their vehicle if they plan to drive onward afterwards.

The total distance between Central Park and Mahanayak Uttam Kumar (Tollygunge) on this metro route is approximately 16.2 km, covered in about 0 hrs 32 mins at typical metro speeds.

Take the Green Line from Central Park towards Mahanayak Uttam Kumar (Tollygunge) on Kolkata Metro.

The estimated normal fare from Central Park to Mahanayak Uttam Kumar (Tollygunge) is ₹30, while smart card users can travel the same 16.2 km route for around ₹24.

The first metro from Central Park towards Mahanayak Uttam Kumar (Tollygunge) departs at 07:00 AM, and the last train on this route leaves at 09:46 PM, so plan your journey within this window.
Book Metro Tickets on ixigo — First Free Metro Ticket Book Metro Tickets on ixigo — First Free Metro Ticket
Saved Routes
No saved routes yet. Tap Save Route on any route page.