Find Another Metro Route

Chikkabidarakallu to Nallurhalli Metro Route

Fare & Timings

Normal Fare: ₹90
Smart Card Fare: ₹86
First Train: 05:02 AM
Last Train: 10:59 PM
Powered by ixigo & ONDC

Station-by-Station Route

34 stations 1 interchange 35.3 km 1 hrs 0 mins
  1. 1
    Start at Chikkabidarakallu station.
  2. 2
    Board the Green Line towards Silk Institute · from Platform 2
    Ride 16 stops to Nadaprabhu Kempegowda station (Majestic).
    Change lines here
  3. 3
    Board the Purple Line towards Whitefield (Kadugodi) · from Platform 1
    Ride 17 stops to Nallurhalli.
  4. Arrive at Nallurhalli station. You have reached your destination.

Bangalore Metro Route Map 2026

Route from Chikkabidarakallu to Nallurhalli on the map.

Loading map…
100%
Scroll to zoom · Drag to pan

Route Summary

How to reach Nallurhalli from Chikkabidarakallu by metro? Board the metro from Chikkabidarakallu station and travel through 32 intermediate metro stations. During the journey, you will need to change train at 1 interchange station(s) before reaching Nallurhalli.

The approximate travel time between Chikkabidarakallu and Nallurhalli is 1 hrs 0 mins. The total distance covered on this metro route is 35.3 Km. The first metro from Chikkabidarakallu departs at 05:02 AM, while the last train leaves at 10:59 PM.

The estimated metro fare for this route is ₹90. Smart card users may receive discounted fares. Parking facility is not available at either Chikkabidarakallu or Nallurhalli station.

Estimated Travel Cost Comparison and Savings based on distance & typical fares in Indian cities.

ModeEst. CostSavings vs Metro
🚇 Metro₹90
🏍 Bike₹302 ₹212 more
🛺 Auto₹453 ₹363 more
🚕 Cab₹745 ₹655 more

Pre-calculated Weekly/Monthly Fare Chart

The fare shown below is calculated for daily, weekly, and monthly travel which includes both up and down journey and for a single person.

PeriodCashSmart Card
Daily₹180₹171
Weekly (5 days)₹900₹855
Weekly (6 days)₹1,080₹1,026
Weekly (7 days)₹1,260₹1,197
Monthly (20 days)₹3,600₹3,420
Monthly (24 days)₹4,320₹4,104
Monthly (28 days)₹5,040₹4,788

Metro Ride Benefits

  • 🌱 Carbon savings: 5.32 kg CO₂
  • ⛽ Fuel savings: 2.35 litres
  • ⏱ Time saved vs road: 45.3 minutes
  • 🔥 Calories burned (walk to/from station): ~70 kcal

Safety Tips

  • Stand behind the yellow line while waiting for the train.
  • Keep your belongings secure and within sight at all times.
  • Let passengers exit before boarding.
  • Hold handrails while the train is moving.
  • In an emergency, use the help point or alert station staff.
Share route info feedback
Route Info
Fare Info
Timing Info
Platform Info

Address
Chibidharkalu, Anchepalya, Bengaluru, Karnataka 560073
Network & Line
Bangalore Metro
Green Line
Layout
Elevated
Platform
Side
Areas Around
Inventure Academy Jindal Nagar Shrikantapura Anchepalya Chikkabidarakallu
Station Amenities
Accessible

Address
Vijayanagar, KIADB Export Promotion Industrial Area, Whitefield, Bengaluru, Karnataka 560048
Network & Line
Bangalore Metro
Purple Line
Layout
Elevated
Platform
Side
Areas Around
Kundalahalli Nallurhalli
Station Amenities
Accessible
Station Gates
Gate No.Way ToAccessible
A Towards GE HealthCare side
B Towards Prasad Tech Park side

Chikkabidarakallu to Nallurhalli Metro Route FAQs

There are 34 stations between Chikkabidarakallu and Nallurhalli on this metro route.

The journey from Chikkabidarakallu to Nallurhalli takes approximately 1 hrs 0 mins, covering a distance of about 35.3 km.

No, parking facility is not available at Chikkabidarakallu metro station.

No, parking facility is not available at Nallurhalli metro station.
Book Metro Tickets on ixigo — First Free Metro Ticket Book Metro Tickets on ixigo — First Free Metro Ticket
Saved Routes
No saved routes yet. Tap Save Route on any route page.