Find a BMRC Route

Nallurhalli to Chikkabidarakallu Metro Route

Nallurhalli Metro Station is — km away from you

Fare & Timings

Normal Fare: ₹90
Smart Card Fare: ₹86
First Train: 05:10 AM
Last Train: 10:55 PM
Powered by ixigo & ONDC

Station-by-Station Route

34 stations 1 interchange 35.3 km 1 hrs 0 mins
  1. 1
    Start at Nallurhalli station. Entry Gates
  2. 2
    Board the Purple Line towards Challaghatta · from Platform 2
    Ride 18 stops to Nadaprabhu Kempegowda station (Majestic).
    Change lines here
  3. 3
    Board the Green Line towards Madavara (BIEC) · from Platform 3
    Ride 15 stops to Chikkabidarakallu.
  4. Arrive at Chikkabidarakallu station. You have reached your destination.

Bangalore Metro Route Map 2026

Route from Nallurhalli to Chikkabidarakallu on the map.

Download JPG
Loading map…
100%
Ctrl + Scroll to zoom · Drag to pan

Route Summary

How to reach Chikkabidarakallu from Nallurhalli by metro? Board the metro from Nallurhalli station and travel through 32 intermediate metro stations. During the journey, you will need to change train at 1 interchange station(s) before reaching Chikkabidarakallu.

The approximate travel time between Nallurhalli and Chikkabidarakallu is 1 hrs 0 mins. The total distance covered on this metro route is 35.3 Km. The first metro from Nallurhalli departs at 05:10 AM, while the last train leaves at 10:55 PM.

The estimated metro fare for this route is ₹90. Smart card users may receive discounted fares. Parking facility is not available at either Nallurhalli or Chikkabidarakallu station.

Estimated Travel Cost Comparison and Savings based on distance & typical fares in Indian cities.

ModeEst. CostSavings vs Metro
🚇 Metro₹90—
🏍 Bike₹302 ₹212 more
🛺 Auto₹453 ₹363 more
🚕 Cab₹745 ₹655 more
Powered by ixigo & ONDC

Pre-calculated Weekly/Monthly Fare Chart

The fare shown below is calculated for daily, weekly, and monthly travel which includes both up and down journey and for a single person.

PeriodCashSmart Card
Daily₹180₹171
Weekly (5 days)₹900₹855
Weekly (6 days)₹1,080₹1,026
Weekly (7 days)₹1,260₹1,197
Monthly (20 days)₹3,600₹3,420
Monthly (24 days)₹4,320₹4,104
Monthly (28 days)₹5,040₹4,788

Commuting with a Bangalore Metro Smart Card saves up to ₹252 per month on this route.

Metro Ride Benefits

  • Carbon savings: 5.32 kg CO₂
  • Fuel savings: 2.35 litres
  • Time saved vs road: 45.3 minutes
  • Calories burned (walk to/from station): ~70 kcal

Safety Tips

  • Stand behind the yellow line while waiting for the train.
  • Keep your belongings secure and within sight at all times.
  • Let passengers exit before boarding.
  • Hold handrails while the train is moving.
  • In an emergency, use the help point or alert station staff.
Share route info feedback
Route Info
Fare Info
Timing Info
Platform Info

Address
Vijayanagar, KIADB Export Promotion Industrial Area, Whitefield, Bengaluru, Karnataka 560048
Line & Network
Purple Line Bangalore Metro
Layout
Elevated (Side)
Areas Around
Kundalahalli Nallurhalli
Station Amenities
Accessible

Address
Chibidharkalu, Anchepalya, Bengaluru, Karnataka 560073
Line & Network
Green Line Bangalore Metro
Layout
Elevated (Side)
Areas Around
Inventure Academy Jindal Nagar Shrikantapura Anchepalya Chikkabidarakallu
Station Amenities
Accessible

Nallurhalli to Chikkabidarakallu Metro Route FAQs

There are 34 stations between Nallurhalli and Chikkabidarakallu on this metro route, spanning a total distance of approximately 35.3 km from end to end.

Yes, this journey starts on the Purple Line from Nallurhalli and ends on the Green Line at Chikkabidarakallu, so you will need to interchange 1 time(s) along the way.

The journey from Nallurhalli to Chikkabidarakallu takes approximately 1 hrs 0 mins at an average metro speed of around 35 km/h, covering 35.3 km in total.

This entire route from Nallurhalli to Chikkabidarakallu runs on Bangalore Metro.

No, parking facility is not currently available at Nallurhalli metro station, so if you are boarding the Purple Line here, consider a drop-off or nearby alternate parking option.

No, parking facility is not currently available at Chikkabidarakallu metro station, so passengers planning to drive from this end are advised to arrange alternate parking nearby in advance.

The total distance between Nallurhalli and Chikkabidarakallu on this metro route is approximately 35.3 km, covered in about 1 hrs 0 mins at typical metro speeds.

Take the Purple Line from Nallurhalli towards Chikkabidarakallu on Bangalore Metro.

The estimated normal fare from Nallurhalli to Chikkabidarakallu is ₹90, while smart card users can travel the same 35.3 km route for around ₹86.

The first metro from Nallurhalli towards Chikkabidarakallu departs at 05:10 AM, and the last train on this route leaves at 10:55 PM, so plan your journey within this window.
Book Metro Tickets on ixigo — First Free Metro Ticket Book Metro Tickets on ixigo — First Free Metro Ticket
Saved Routes
No saved routes yet. Tap Save Route on any route page.