Find a BMRC Route

Cubbon Park to Hosa Road Metro Route

Cubbon Park Metro Station is — km away from you

Fare & Timings

Normal Fare: ₹70
Smart Card Fare: ₹67
First Train: 05:38 AM
Last Train: 11:23 PM
Powered by ixigo & ONDC

Station-by-Station Route

22 stations 2 interchanges 19.6 km 0 hrs 34 mins
  1. 1
    Start at Cubbon Park station. Entry Gates
  2. 2
    Board the Purple Line towards Challaghatta · from Platform 2
    Ride 4 stops to Nadaprabhu Kempegowda station (Majestic).
    Change lines here
  3. 3
    Board the Green Line towards Silk Institute · from Platform 4
    Ride 7 stops to Rashtreeya Vidyalaya Road.
    Change lines here
  4. 4
    Board the Yellow Line towards Delta Electronics Bommasandra · from Platform 3
    Ride 9 stops to Hosa Road.
  5. Arrive at Hosa Road station. You have reached your destination.

Bangalore Metro Route Map 2026

Route from Cubbon Park to Hosa Road on the map.

Download JPG
Loading map…
100%
Ctrl + Scroll to zoom · Drag to pan

Route Summary

How to reach Hosa Road from Cubbon Park by metro? Board the metro from Cubbon Park station and travel through 20 intermediate metro stations. During the journey, you will need to change train at 2 interchange station(s) before reaching Hosa Road.

The approximate travel time between Cubbon Park and Hosa Road is 0 hrs 34 mins. The total distance covered on this metro route is 19.6 Km. The first metro from Cubbon Park departs at 05:38 AM, while the last train leaves at 11:23 PM.

The estimated metro fare for this route is ₹70. Smart card users may receive discounted fares. Parking facility is not available at either Cubbon Park or Hosa Road station.

Estimated Travel Cost Comparison and Savings based on distance & typical fares in Indian cities.

ModeEst. CostSavings vs Metro
🚇 Metro₹70—
🏍 Bike₹177 ₹107 more
🛺 Auto₹265 ₹195 more
🚕 Cab₹432 ₹362 more
Powered by ixigo & ONDC

Pre-calculated Weekly/Monthly Fare Chart

The fare shown below is calculated for daily, weekly, and monthly travel which includes both up and down journey and for a single person.

PeriodCashSmart Card
Daily₹140₹133
Weekly (5 days)₹700₹665
Weekly (6 days)₹840₹798
Weekly (7 days)₹980₹931
Monthly (20 days)₹2,800₹2,660
Monthly (24 days)₹3,360₹3,192
Monthly (28 days)₹3,920₹3,724

Commuting with a Bangalore Metro Smart Card saves up to ₹196 per month on this route.

Metro Ride Benefits

  • Carbon savings: 2.96 kg CO₂
  • Fuel savings: 1.31 litres
  • Time saved vs road: 25.2 minutes
  • Calories burned (walk to/from station): ~70 kcal

Safety Tips

  • Stand behind the yellow line while waiting for the train.
  • Keep your belongings secure and within sight at all times.
  • Let passengers exit before boarding.
  • Hold handrails while the train is moving.
  • In an emergency, use the help point or alert station staff.
Share route info feedback
Route Info
Fare Info
Timing Info
Platform Info

Address
Shivaji Nagar, Bengaluru, Karnataka 560001
Line & Network
Purple Line Bangalore Metro
Layout
Underground (Island)
Areas Around
Swamy Shivanandapuram Shivaji Nagar Visvesvaraya Industrial & Technological Museum Nandi Durga Road Extension Cubbon Park
Station Amenities
Accessible

Address
Aishwarya Crystal Layout, Begur, Bengaluru, Karnataka 560068
Line & Network
Yellow Line Bangalore Metro
Layout
Elevated (Side)
Areas Around
Parappana Agrahara NaganathapuraYellama Layout Hosa Road
Station Amenities
Accessible
Train Frequency
PeakOff-Peak
Weekdays 9 min 14 min
Saturday 9 min 14 min
Sunday 9 min 14 min

Cubbon Park to Hosa Road Metro Route FAQs

There are 22 stations between Cubbon Park and Hosa Road on this metro route, spanning a total distance of approximately 19.6 km from end to end.

Yes, this journey starts on the Purple Line from Cubbon Park and ends on the Yellow Line at Hosa Road, so you will need to interchange 2 time(s) along the way.

The journey from Cubbon Park to Hosa Road takes approximately 0 hrs 34 mins at an average metro speed of around 35 km/h, covering 19.6 km in total.

This entire route from Cubbon Park to Hosa Road runs on Bangalore Metro.

No, parking facility is not currently available at Cubbon Park metro station, so if you are boarding the Purple Line here, consider a drop-off or nearby alternate parking option.

No, parking facility is not currently available at Hosa Road metro station, so passengers planning to drive from this end are advised to arrange alternate parking nearby in advance.

The total distance between Cubbon Park and Hosa Road on this metro route is approximately 19.6 km, covered in about 0 hrs 34 mins at typical metro speeds.

Take the Purple Line from Cubbon Park towards Hosa Road on Bangalore Metro.

The estimated normal fare from Cubbon Park to Hosa Road is ₹70, while smart card users can travel the same 19.6 km route for around ₹67.

The first metro from Cubbon Park towards Hosa Road departs at 05:38 AM, and the last train on this route leaves at 11:23 PM, so plan your journey within this window.
Book Metro Tickets on ixigo — First Free Metro Ticket Book Metro Tickets on ixigo — First Free Metro Ticket
Saved Routes
No saved routes yet. Tap Save Route on any route page.