Find Another Metro Route

Dholakuva Circle to Vijay Nagar Metro Route

Fare & Timings

Normal Fare: ₹25
Smart Card Fare: ₹23
First Train: 08:31 AM
Last Train: 07:52 PM

Station-by-Station Route

19 stations 1 interchange 19.1 km 0 hrs 35 mins
  1. 1
    Start at Dholakuva Circle station.
  2. 2
    Board the Yellow towards Motera Stadium · from Platform 2
    Ride 12 stops to Motera Stadium.
    Change lines here
  3. 3
    Board the Red Line towards APMC · from Platform 2
    Ride 6 stops to Vijay Nagar.
  4. Arrive at Vijay Nagar station. You have reached your destination.

Ahmedabad Metro Route Map 2026

Route from Dholakuva Circle to Vijay Nagar on the map.

Loading map…
100%
Scroll to zoom · Drag to pan

Route Summary

How to reach Vijay Nagar from Dholakuva Circle by metro? Board the metro from Dholakuva Circle station and travel through 17 intermediate metro stations. During the journey, you will need to change train at 1 interchange station(s) before reaching Vijay Nagar.

The approximate travel time between Dholakuva Circle and Vijay Nagar is 0 hrs 35 mins. The total distance covered on this metro route is 19.1 Km. The first metro from Dholakuva Circle departs at 08:31 AM, while the last train leaves at 07:52 PM.

The estimated metro fare for this route is ₹25. Smart card users may receive discounted fares. Parking facility is not available at either Dholakuva Circle or Vijay Nagar station.

Estimated Travel Cost Comparison and Savings based on distance & typical fares in Indian cities.

ModeEst. CostSavings vs Metro
🚇 Metro₹25
🏍 Bike₹173 ₹148 more
🛺 Auto₹259 ₹234 more
🚕 Cab₹422 ₹397 more

Pre-calculated Weekly/Monthly Fare Chart

The fare shown below is calculated for daily, weekly, and monthly travel which includes both up and down journey and for a single person.

PeriodCashSmart Card
Daily₹50₹45
Weekly (5 days)₹250₹225
Weekly (6 days)₹300₹270
Weekly (7 days)₹350₹315
Monthly (20 days)₹1,000₹900
Monthly (24 days)₹1,200₹1,080
Monthly (28 days)₹1,400₹1,260

Metro Ride Benefits

  • 🌱 Carbon savings: 2.89 kg CO₂
  • ⛽ Fuel savings: 1.27 litres
  • ⏱ Time saved vs road: 22.6 minutes
  • 🔥 Calories burned (walk to/from station): ~70 kcal

Safety Tips

  • Stand behind the yellow line while waiting for the train.
  • Keep your belongings secure and within sight at all times.
  • Let passengers exit before boarding.
  • Hold handrails while the train is moving.
  • In an emergency, use the help point or alert station staff.
Share route info feedback
Route Info
Fare Info
Timing Info
Platform Info

Address
Gandhinagar, Gujarat 382421
Network & Line
Ahmedabad Metro
Yellow
Layout
Elevated
Platform
Side
Areas Around
Astittva Welfare foundation Randesan Sahjanand Park Dholakuva Circle
Station Amenities
Accessible
Train Frequency
PeakOff-Peak
Weekdays 10 min 12 min
Saturday 12 min 12 min
Sunday 12 min 12 min

Address
Sardar Colony, Ahmedabad, Gujarat 380013
Network & Line
Ahmedabad Metro
Red Line
Layout
Elevated
Platform
Side
Areas Around
Sardar Colony Bhimjipura Shiv Sankalp Society Sundar Nagar Vijay Nagar
Station Amenities
Accessible
Train Frequency
PeakOff-Peak
Weekdays 10 min 12 min
Saturday 12 min 12 min
Sunday 12 min 12 min

Dholakuva Circle to Vijay Nagar Metro Route FAQs

There are 19 stations between Dholakuva Circle and Vijay Nagar on this metro route.

The journey from Dholakuva Circle to Vijay Nagar takes approximately 0 hrs 35 mins, covering a distance of about 19.1 km.

No, parking facility is not available at Dholakuva Circle metro station.

No, parking facility is not available at Vijay Nagar metro station.
Book Metro Tickets on ixigo — First Free Metro Ticket Book Metro Tickets on ixigo — First Free Metro Ticket
Saved Routes
No saved routes yet. Tap Save Route on any route page.