Ahmedabad Metro Yellow Overview
The Yellow Line is Ahmedabad Metro's Phase 2 corridor, running about 23 km from Motera Stadium to Mahatma Mandir in Gandhinagar with around 20 stations. It links Ahmedabad with Koba, GNLU, Infocity, Sector 1 and the Gujarat Secretariat (Sachivalaya). Services began on 17 September 2024, and the line was fully opened to Mahatma Mandir on 11 January 2026. Explore the Ahmedabad Metro Yellow Line route map, full station list, interchange stations, fares, first and last train timings and top attractions nearby.
Yellow Station List 2026 (21 Active)
Parking Feeder Bus ATM Restroom
| # | Station | Amenities |
|---|---|---|
| 1 |
Mahatma Mandir
|
|
| 2 |
Sector 24
|
|
| 3 |
Sector 16
|
|
| 4 |
Juna Sachivalaya
|
|
| 5 |
Akshardham
|
|
| 6 |
Sachivalaya
|
|
| 7 |
Sector 10A
|
|
| 8 |
Sector 1
|
|
| 9 |
Infocity
|
|
| 10 |
Dholakuva Circle
|
|
| 11 |
Randesan
|
|
| 12 |
Raysan
|
|
| 13 |
GNLU
Interchange
|
|
| 14 |
Koba Gam
|
|
| 15 |
Juna Koba
|
|
| 16 |
Koba Circle
|
|
| 17 |
Narmada Canal
|
|
| 18 |
Tapovan Circle
|
|
| 19 |
Vishwakarma College
|
|
| 20 |
Koteshwar Road
|
|
| 21 |
Motera Stadium
Interchange
|
Yellow Route Map 2026
Pan and zoom to explore the GMRC Yellow.
Loading map…
100%
Ctrl + Scroll to zoom · Drag to pan
Yellow History, Facts & Expansion
- The Yellow Line extends Ahmedabad's North-South corridor from Motera Stadium to Mahatma Mandir in Gandhinagar.
- It is about 23 km long with around 20 stations.
- Prime Minister Narendra Modi laid the foundation stone of Phase 2 on 18 January 2021.
- The Motera Stadium-Sector 1 section opened on 17 September 2024.
- Seven more stations opened on 27 April 2025, and Juna Koba and Koba Gam opened on 28 September 2025.
- The final Sachivalaya-Mahatma Mandir section opened on 11 January 2026, completing the line.
- It interchanges with the Red Line at Motera Stadium and the Violet Line at GNLU.
- Mahatma Mandir is Gandhinagar's convention centre.
- Infocity station serves Gandhinagar's IT park.
- The line includes stations in Gandhinagar's sectors.
- Gandhinagar metro service makes it one of India's best-connected state capitals.
Ahmedabad Metro Yellow Line Phase-wise Expansion
Phase 2 - Stage 1 (2024) (Completed)
Motera Stadium-Sector 1 opened in September 2024.
Phase 2 - Stage 2 (2025) (Completed)
Seven stations in April 2025, Juna Koba and Koba Gam in September 2025.
Phase 2 - Stage 3 (2026) (Completed)
Sachivalaya-Mahatma Mandir opened on 11 January 2026.
Future (Under study)
Further Gandhinagar links under study.
Yellow FAQs
The Ahmedabad Yellow Line Metro currently has an interchange station at Old High Court, where it connects with the Ahmedabad Metro Red Line.
Yes, the Ahmedabad Metro Yellow Line is operational today. It runs as per its scheduled time. However, for any updates regarding delays or maintenance work, it is advisable to check the official website or app of Gujarat Metro Rail Corporation Limited (GMRC).
Ahmedabad Metro Yellow Line Timings
Ahmedabad Metro Yellow Line runs on a regular schedule throughout the week between Vastral Gam and Thaltej Gam.
Ahmedabad Metro Yellow Line Timings from Monday to Saturday:
- First train: 06:20:00 AM (Vastral Gam to Thaltej Gam) | 06:20:00 AM (Thaltej Gam to Vastral Gam)
- Last train: 22:00:00 PM
Ahmedabad Metro Yellow Line Timings on Sunday:
- First train: 06:20:00 AM (Vastral Gam to Thaltej Gam) | 06:20:00 AM (Thaltej Gam to Vastral Gam)
- Last train: 22:00:00 PM
Kalupur Metro Station on the Yellow Line of the Ahmedabad Metro is directly connected to Ahmedabad Junction (Kalupur) Railway Station, ensuring smooth connectivity with Indian Railways.
To change between the Yellow and Red lines of the Ahmedabad Metro, commuters can use the Old High Court station, which serves as the interchange point.
The average ticket fare on the Yellow Line is the same as other corridors of Ahmedabad Metro. Fares begin at ₹5 for the first 2.5 km, increasing gradually with distance, with the maximum fare being around ₹25 for end-to-end journeys.
Trains on the Yellow Line run at a frequency of every 12 minutes during peak hours. Services operate between 6:20 AM and 10:00 PM, ensuring consistent connectivity throughout the day.
No, the Yellow Line does not currently provide direct connectivity to Sardar Vallabhbhai Patel International Airport. However, metro connectivity to the airport is being planned through an extension of the Ahmedabad Metro Phase 2 (via Motera Stadium to Airport), which will eventually ensure seamless access to the airport.