Find a BMRC Route

Hopefarm Channasandra to Pattanagere Metro Route

Fare & Timings

Normal Fare: ₹90
Smart Card Fare: ₹86
First Train: 05:02 AM
Last Train: 10:47 PM
Powered by ixigo & ONDC

Station-by-Station Route

33 stations 0 interchanges 31 km 0 hrs 53 mins
  1. 1
    Start at Hopefarm Channasandra station.
  2. 2
    Board the Purple Line towards Challaghatta · from Platform 2
    Ride 33 stops to Pattanagere.
  3. Arrive at Pattanagere station. You have reached your destination.

Bangalore Metro Route Map 2026

Route from Hopefarm Channasandra to Pattanagere on the map.

Loading map…
100%
Scroll to zoom · Drag to pan

Route Summary

How to reach Pattanagere from Hopefarm Channasandra by metro? Board the metro from Hopefarm Channasandra station and travel through 31 intermediate metro stations. This is a direct route on the same line, with no train change required before reaching Pattanagere.

The approximate travel time between Hopefarm Channasandra and Pattanagere is 0 hrs 53 mins. The total distance covered on this metro route is 31 Km. The first metro from Hopefarm Channasandra departs at 05:02 AM, while the last train leaves at 10:47 PM.

The estimated metro fare for this route is ₹90. Smart card users may receive discounted fares. Parking facility is not available at either Hopefarm Channasandra or Pattanagere station.

Estimated Travel Cost Comparison and Savings based on distance & typical fares in Indian cities.

ModeEst. CostSavings vs Metro
🚇 Metro₹90
🏍 Bike₹268 ₹178 more
🛺 Auto₹402 ₹312 more
🚕 Cab₹660 ₹570 more

Pre-calculated Weekly/Monthly Fare Chart

The fare shown below is calculated for daily, weekly, and monthly travel which includes both up and down journey and for a single person.

PeriodCashSmart Card
Daily₹180₹171
Weekly (5 days)₹900₹855
Weekly (6 days)₹1,080₹1,026
Weekly (7 days)₹1,260₹1,197
Monthly (20 days)₹3,600₹3,420
Monthly (24 days)₹4,320₹4,104
Monthly (28 days)₹5,040₹4,788

Metro Ride Benefits

  • 🌱 Carbon savings: 4.68 kg CO₂
  • ⛽ Fuel savings: 2.07 litres
  • ⏱ Time saved vs road: 39.8 minutes
  • 🔥 Calories burned (walk to/from station): ~70 kcal

Safety Tips

  • Stand behind the yellow line while waiting for the train.
  • Keep your belongings secure and within sight at all times.
  • Let passengers exit before boarding.
  • Hold handrails while the train is moving.
  • In an emergency, use the help point or alert station staff.
Share route info feedback
Route Info
Fare Info
Timing Info
Platform Info

Address
Whitefield Main Road, Maithri Layout, Kadugodi, Bengaluru, Karnataka 560067
Network & Line
Bangalore Metro
Purple Line
Layout
Elevated
Platform
Side
Areas Around
Maithri Layout Kadugodi MVJ College AK Gopalan Colony Hopefarm Channasandra
Station Amenities
Accessible
ATM
Station Gates
Gate No.Way ToAccessible
A Towards Kadugodi Colony side
B Towards Kadugodi side

Address
RV Vidyaniketan, Mailasandra, Bengaluru, Karnataka 560059
Network & Line
Bangalore Metro
Purple Line
Layout
Elevated
Platform
Side
Areas Around
RV College of Engineering Duvasapalya Dubasi Palya Remco Housing Society Gnanabharathi Pattanagere
Station Amenities
Accessible
Station Gates
Gate No.Way ToAccessible
A Towards RV College of Engineering side
B Towards Duvasapalya Road side

Hopefarm Channasandra to Pattanagere Metro Route FAQs

There are 33 stations between Hopefarm Channasandra and Pattanagere on this metro route.

No, Hopefarm Channasandra to Pattanagere is a direct route on the same line — no train change is needed.

The journey from Hopefarm Channasandra to Pattanagere takes approximately 0 hrs 53 mins, covering a distance of about 31 km.

No, parking facility is not available at Hopefarm Channasandra metro station.

No, parking facility is not available at Pattanagere metro station.
Book Metro Tickets on ixigo — First Free Metro Ticket Book Metro Tickets on ixigo — First Free Metro Ticket
Saved Routes
No saved routes yet. Tap Save Route on any route page.