Find Another Metro Route

Kengeri Bus Terminal to Manjunatha Nagara Metro Route

Fare & Timings

Normal Fare: ₹90
Smart Card Fare: ₹86
First Train: 05:04 AM
Last Train: 11:09 PM
Powered by ixigo & ONDC

Station-by-Station Route

28 stations 1 interchange 28.7 km 0 hrs 49 mins
  1. 1
    Start at Kengeri Bus Terminal station.
  2. 2
    Board the Purple Line towards Whitefield (Kadugodi) · from Platform 1
    Ride 13 stops to Nadaprabhu Kempegowda station (Majestic).
    Change lines here
  3. 3
    Board the Green Line towards Madavara (BIEC) · from Platform 3
    Ride 14 stops to Manjunatha Nagara.
  4. Arrive at Manjunatha Nagara station. You have reached your destination.

Bangalore Metro Route Map 2026

Route from Kengeri Bus Terminal to Manjunatha Nagara on the map.

Loading map…
100%
Scroll to zoom · Drag to pan

Route Summary

How to reach Manjunatha Nagara from Kengeri Bus Terminal by metro? Board the metro from Kengeri Bus Terminal station and travel through 26 intermediate metro stations. During the journey, you will need to change train at 1 interchange station(s) before reaching Manjunatha Nagara.

The approximate travel time between Kengeri Bus Terminal and Manjunatha Nagara is 0 hrs 49 mins. The total distance covered on this metro route is 28.7 Km. The first metro from Kengeri Bus Terminal departs at 05:04 AM, while the last train leaves at 11:09 PM.

The estimated metro fare for this route is ₹90. Smart card users may receive discounted fares. Parking facility is not available at either Kengeri Bus Terminal or Manjunatha Nagara station.

Estimated Travel Cost Comparison and Savings based on distance & typical fares in Indian cities.

ModeEst. CostSavings vs Metro
🚇 Metro₹90
🏍 Bike₹250 ₹160 more
🛺 Auto₹375 ₹285 more
🚕 Cab₹615 ₹525 more

Pre-calculated Weekly/Monthly Fare Chart

The fare shown below is calculated for daily, weekly, and monthly travel which includes both up and down journey and for a single person.

PeriodCashSmart Card
Daily₹180₹171
Weekly (5 days)₹900₹855
Weekly (6 days)₹1,080₹1,026
Weekly (7 days)₹1,260₹1,197
Monthly (20 days)₹3,600₹3,420
Monthly (24 days)₹4,320₹4,104
Monthly (28 days)₹5,040₹4,788

Metro Ride Benefits

  • 🌱 Carbon savings: 4.34 kg CO₂
  • ⛽ Fuel savings: 1.92 litres
  • ⏱ Time saved vs road: 36.9 minutes
  • 🔥 Calories burned (walk to/from station): ~70 kcal

Safety Tips

  • Stand behind the yellow line while waiting for the train.
  • Keep your belongings secure and within sight at all times.
  • Let passengers exit before boarding.
  • Hold handrails while the train is moving.
  • In an emergency, use the help point or alert station staff.
Share route info feedback
Route Info
Fare Info
Timing Info
Platform Info

Address
Mysore Road, Harsha Layout, Kengeri Satellite Town, Bengaluru, Karnataka 560059
Network & Line
Bangalore Metro
Purple Line
Layout
Elevated
Platform
Side
Areas Around
Vijayashree Layout Harsha Layout Mailasandra Vinayaka Nagar Kengeri Bus Terminal
Station Amenities
Accessible
Station Gates
Gate No.Way ToAccessible
A Towards Kengeri Bus Terminal
B Towards Kengeri Satellite Town
C Towards Mysuru Road

Address
Arch, No 45, Gomatha Complex Bagalgunte, Manjunatha Nagar, Bagalakunte, Bengaluru, Karnataka 560073
Network & Line
Bangalore Metro
Green Line
Layout
Elevated
Platform
Side
Areas Around
Bagalakunte Manjunatha Nagar Rukmini Nagar Karnataka German Technical Training Institute Manjunatha Nagara
Station Amenities
Accessible

Kengeri Bus Terminal to Manjunatha Nagara Metro Route FAQs

There are 28 stations between Kengeri Bus Terminal and Manjunatha Nagara on this metro route.

The journey from Kengeri Bus Terminal to Manjunatha Nagara takes approximately 0 hrs 49 mins, covering a distance of about 28.7 km.

No, parking facility is not available at Kengeri Bus Terminal metro station.

No, parking facility is not available at Manjunatha Nagara metro station.
Book Metro Tickets on ixigo — First Free Metro Ticket Book Metro Tickets on ixigo — First Free Metro Ticket
Saved Routes
No saved routes yet. Tap Save Route on any route page.