Find a BMRC Route

Kudlu Gate to Yelachenahalli Metro Route

Kudlu Gate Metro Station is — km away from you

Fare & Timings

Normal Fare: ₹60
Smart Card Fare: ₹57
First Train: 05:16 AM
Last Train: 11:01 PM
Powered by ixigo & ONDC

Station-by-Station Route

12 stations 1 interchange 11.7 km 0 hrs 20 mins
Starts here
Yellow Line · Platform No.: 1 · Towards: Rashtreeya Vidyalaya Road
Change here
Green Line · Platform No.: 2 · Towards: Silk Institute
Ends here Exit Gates
  1. 1
    Start at Kudlu Gate station.
  2. 2
    Board the Yellow Line towards Rashtreeya Vidyalaya Road · from Platform 1
    Ride 8 stops to Rashtreeya Vidyalaya Road.
    Change lines here
  3. 3
    Board the Green Line towards Silk Institute · from Platform 2
    Ride 3 stops to Yelachenahalli.
  4. Arrive at Yelachenahalli station. You have reached your destination. Exit Gates

Bangalore Metro Route Map 2026

Route from Kudlu Gate to Yelachenahalli on the map.

Download JPG
Loading map…
100%
Ctrl + Scroll to zoom · Drag to pan

Route Summary

How to reach Yelachenahalli from Kudlu Gate by metro? Board the metro from Kudlu Gate station and travel through 10 intermediate metro stations. During the journey, you will need to change train at 1 interchange station(s) before reaching Yelachenahalli.

The approximate travel time between Kudlu Gate and Yelachenahalli is 0 hrs 20 mins. The total distance covered on this metro route is 11.7 Km. The first metro from Kudlu Gate departs at 05:16 AM, while the last train leaves at 11:01 PM.

The estimated metro fare for this route is ₹60. Smart card users may receive discounted fares. Parking facility is available at Yelachenahalli station.

Estimated Travel Cost Comparison and Savings based on distance & typical fares in Indian cities.

ModeEst. CostSavings vs Metro
🚇 Metro₹60—
🏍 Bike₹114 ₹54 more
🛺 Auto₹170 ₹110 more
🚕 Cab₹274 ₹214 more
Powered by ixigo & ONDC

Pre-calculated Weekly/Monthly Fare Chart

The fare shown below is calculated for daily, weekly, and monthly travel which includes both up and down journey and for a single person.

PeriodCashSmart Card
Daily₹120₹114
Weekly (5 days)₹600₹570
Weekly (6 days)₹720₹684
Weekly (7 days)₹840₹798
Monthly (20 days)₹2,400₹2,280
Monthly (24 days)₹2,880₹2,736
Monthly (28 days)₹3,360₹3,192

Commuting with a Bangalore Metro Smart Card saves up to ₹168 per month on this route.

Metro Ride Benefits

  • Carbon savings: 1.77 kg CO₂
  • Fuel savings: 0.78 litres
  • Time saved vs road: 15.0 minutes
  • Calories burned (walk to/from station): ~70 kcal

Safety Tips

  • Stand behind the yellow line while waiting for the train.
  • Keep your belongings secure and within sight at all times.
  • Let passengers exit before boarding.
  • Hold handrails while the train is moving.
  • In an emergency, use the help point or alert station staff.
Share route info feedback
Route Info
Fare Info
Timing Info
Platform Info

Address
Hosur Rd, Kudlu Gate, Industrial Layout, Singasandra, Bengaluru, Karnataka 560068
Line & Network
Yellow Line Bangalore Metro
Layout
Elevated (Side)
Areas Around
Kudlu Gate Dayananda Sagar University (DSU) CliniLaunch
Station Amenities
Accessible
Train Frequency
PeakOff-Peak
Weekdays 9 min 14 min
Saturday 9 min 14 min
Sunday 9 min 14 min

Address
Kanakapura Road Harsha Layout Kumaraswamy Layout Bengaluru, Arisinakunte, Karnataka 560078
Line & Network
Green Line Bangalore Metro
Layout
Elevated (Side)
Areas Around
JP Nagar 6th Phase Mango Garden Layout Ganapathipura ISRO Layout Yelachenahalli
Station Amenities
Parking
Accessible
Feeder Bus

Kudlu Gate to Yelachenahalli Metro Route FAQs

There are 12 stations between Kudlu Gate and Yelachenahalli on this metro route, spanning a total distance of approximately 11.7 km from end to end.

Yes, this journey starts on the Yellow Line from Kudlu Gate and ends on the Green Line at Yelachenahalli, so you will need to interchange 1 time(s) along the way.

The journey from Kudlu Gate to Yelachenahalli takes approximately 0 hrs 20 mins at an average metro speed of around 35 km/h, covering 11.7 km in total.

This entire route from Kudlu Gate to Yelachenahalli runs on Bangalore Metro.

No, parking facility is not currently available at Kudlu Gate metro station, so if you are boarding the Yellow Line here, consider a drop-off or nearby alternate parking option.

Yes, parking facility is available at Yelachenahalli metro station, making it convenient for passengers arriving from Kudlu Gate to leave their vehicle if they plan to drive onward afterwards.

The total distance between Kudlu Gate and Yelachenahalli on this metro route is approximately 11.7 km, covered in about 0 hrs 20 mins at typical metro speeds.

Take the Yellow Line from Kudlu Gate towards Yelachenahalli on Bangalore Metro.

The estimated normal fare from Kudlu Gate to Yelachenahalli is ₹60, while smart card users can travel the same 11.7 km route for around ₹57.

The first metro from Kudlu Gate towards Yelachenahalli departs at 05:16 AM, and the last train on this route leaves at 11:01 PM, so plan your journey within this window.
Book Metro Tickets on ixigo — First Free Metro Ticket Book Metro Tickets on ixigo — First Free Metro Ticket
Saved Routes
No saved routes yet. Tap Save Route on any route page.