Find a NMRC Route

Noida Sector 148 to Phase 2 Metro Route

Noida Sector 148 Metro Station is km away from you

Fare & Timings

Normal Fare: ₹134
NMRC ₹50 · DMRC ₹64 · HMRTC ₹20
Smart Card Fare: ₹123
First Train: 04:15 PM
Last Train: 10:14 PM
Powered by ixigo & ONDC

Station-by-Station Route

47 stations 4 interchanges 54.5 km 1 hrs 33 mins
  1. 1
    Start at Noida Sector 148 station.
  2. 2
    Board the Aqua Line towards Noida Sector 51 · from Platform 1
    Ride 16 stops to Noida Sector 52.
    Change lines here
  3. 3
    Board the Blue Line towards Dwarka Sector 21 · from Platform 2
    Ride 4 stops to Botanical Garden.
    Change lines here
  4. 4
    Board the Magenta Line towards Krishna Park Extension · from Platform 4
    Ride 13 stops to Hauz Khas.
    Change lines here
  5. 5
    Board the Yellow Line towards Millennium City Centre (HUDA City Centre) · from Platform 1
    Ride 9 stops to Sikandarpur.
    Change lines here
  6. 6
    Board the Rapid Line towards Phase 3 · from Platform 2
    Ride 1 stop to Phase 2.
  7. Arrive at Phase 2 station. You have reached your destination.

Noida Metro Route Map 2026

Route from Noida Sector 148 to Phase 2 on the map.

Loading map…
100%
Ctrl + Scroll to zoom · Drag to pan

Route Summary

How to reach Phase 2 from Noida Sector 148 by metro? Board the metro from Noida Sector 148 station and travel through 45 intermediate metro stations. During the journey, you will need to change train at 4 interchange station(s) before reaching Phase 2.

The approximate travel time between Noida Sector 148 and Phase 2 is 1 hrs 33 mins. The total distance covered on this metro route is 54.5 Km. The first metro from Noida Sector 148 departs at 04:15 PM, while the last train leaves at 10:14 PM.

The estimated metro fare for this route is ₹134. Smart card users may receive discounted fares. Parking facility is available at Noida Sector 148 station.

Estimated Travel Cost Comparison and Savings based on distance & typical fares in Indian cities.

ModeEst. CostSavings vs Metro
🚇 Metro₹134
🏍 Bike₹456 ₹322 more
🛺 Auto₹684 ₹550 more
🚕 Cab₹1,131 ₹997 more
Powered by ixigo & ONDC

Pre-calculated Weekly/Monthly Fare Chart

The fare shown below is calculated for daily, weekly, and monthly travel which includes both up and down journey and for a single person.

PeriodCashSmart Card
Daily₹268₹245
Weekly (5 days)₹1,340₹1,226
Weekly (6 days)₹1,608₹1,471
Weekly (7 days)₹1,876₹1,716
Monthly (20 days)₹5,360₹4,904
Monthly (24 days)₹6,432₹5,885
Monthly (28 days)₹7,504₹6,866

Metro Ride Benefits

  • 🌱 Carbon savings: 8.24 kg CO₂
  • ⛽ Fuel savings: 3.64 litres
  • ⏱ Time saved vs road: 70.1 minutes
  • 🔥 Calories burned (walk to/from station): ~70 kcal

Safety Tips

  • Stand behind the yellow line while waiting for the train.
  • Keep your belongings secure and within sight at all times.
  • Let passengers exit before boarding.
  • Hold handrails while the train is moving.
  • In an emergency, use the help point or alert station staff.
Share route info feedback
Route Info
Fare Info
Timing Info
Platform Info

Address
Kondli Khadar, Noida, Uttar Pradesh 201310
Network & Line
Noida Metro
Aqua Line
Layout
Elevated
Platform
Side
Areas Around
Kondli Khadar Noida Sector 152 Shafipur Kondali Bangar Noida Sector 149 Noida Sector 148
Station Amenities
Parking
Accessible
Train Frequency
PeakOff-Peak
Weekdays 10 min 15 min
Saturday 10 min 15 min
Sunday 10 min 15 min

Address
U Block, DLF Phase 2, Sector 25, Gurugram, Haryana 122002
Network & Line
Gurgaon Metro
Rapid Line
Layout
Elevated
Platform
Side
Areas Around
Nathupur Balveer Market DLF Phase 2 Shahpur S Block Phase 2
Station Amenities
Accessible
ATM
Station Gates
Gate No.Way ToAccessible
1 DLF Phase 2 residential areas
2 DLF Epitome (Building No. 5)

Noida Sector 148 to Phase 2 Metro Route FAQs

There are 47 stations between Noida Sector 148 and Phase 2 on this metro route, spanning a total distance of approximately 54.5 km from end to end.

Yes, this journey starts on the Aqua Line from Noida Sector 148 and ends on the Rapid Line at Phase 2, so you will need to interchange 4 time(s) along the way.

The journey from Noida Sector 148 to Phase 2 takes approximately 1 hrs 33 mins at an average metro speed of around 35 km/h, covering 54.5 km in total.

This route starts on Noida Metro at Noida Sector 148 and ends on Gurgaon Metro at Phase 2, so you will interchange between two different operators' systems during the journey.

Yes, parking facility is available at Noida Sector 148 metro station, so you can conveniently park your vehicle here before boarding the Aqua Line towards Phase 2.

No, parking facility is not currently available at Phase 2 metro station, so passengers planning to drive from this end are advised to arrange alternate parking nearby in advance.

The total distance between Noida Sector 148 and Phase 2 on this metro route is approximately 54.5 km, covered in about 1 hrs 33 mins at typical metro speeds.

Start on the Aqua Line at Noida Sector 148 on Noida Metro, then interchange onto the Rapid Line to reach Phase 2 on the Gurgaon Metro network at the other end.

The estimated normal fare from Noida Sector 148 to Phase 2 is ₹134, while smart card users can travel the same 54.5 km route for around ₹123.

The first metro from Noida Sector 148 towards Phase 2 departs at 04:15 PM, and the last train on this route leaves at 10:14 PM, so plan your journey within this window.
Book Metro Tickets on ixigo — First Free Metro Ticket Book Metro Tickets on ixigo — First Free Metro Ticket
Saved Routes
No saved routes yet. Tap Save Route on any route page.