Find a HMRTC Route

Phase 3 to Terminal 1 IGI Airport Metro Route

Phase 3 Metro Station is km away from you

Fare & Timings

Normal Fare: ₹74
HMRTC ₹20 · DMRC ₹54
Smart Card Fare: ₹69
First Train: 06:19 AM
Last Train: 08:09 PM
Powered by ixigo & ONDC

Station-by-Station Route

23 stations 2 interchanges 26.6 km 0 hrs 46 mins
Starts here
Rapid Line · Platform No.: 1 · Towards: Sector 55 56
Change here
Yellow Line · Platform No.: 2 · Towards: Samaypur Badli
Change here
Magenta Line · Platform No.: 4 · Towards: Krishna Park Extension · 10 min Walk
Ends here
Exit
  1. 1
    Start at Phase 3 station.
  2. 2
    Board the Rapid Line towards Sector 55 56 · from Platform 1
    Ride 6 stops to Sikandarpur.
    Change lines here
  3. 3
    Board the Yellow Line towards Samaypur Badli · from Platform 2
    Ride 9 stops to Hauz Khas.
    Change lines here
  4. 4
    Board the Magenta Line towards Krishna Park Extension · from Platform 4
    Ride 6 stops to Terminal 1 IGI Airport.
  5. Arrive at Terminal 1 IGI Airport station. You have reached your destination.

Gurgaon Metro Route Map 2026

Route from Phase 3 to Terminal 1 IGI Airport on the map.

Loading map…
100%
Ctrl + Scroll to zoom · Drag to pan

Route Summary

How to reach Terminal 1 IGI Airport from Phase 3 by metro? Board the metro from Phase 3 station and travel through 21 intermediate metro stations. During the journey, you will need to change train at 2 interchange station(s) before reaching Terminal 1 IGI Airport.

The approximate travel time between Phase 3 and Terminal 1 IGI Airport is 0 hrs 46 mins. The total distance covered on this metro route is 26.6 Km. The first metro from Phase 3 departs at 06:19 AM, while the last train leaves at 08:09 PM.

The estimated metro fare for this route is ₹74. Smart card users may receive discounted fares. Parking facility is not available at either Phase 3 or Terminal 1 IGI Airport station.

Estimated Travel Cost Comparison and Savings based on distance & typical fares in Indian cities.

ModeEst. CostSavings vs Metro
🚇 Metro₹74
🏍 Bike₹233 ₹159 more
🛺 Auto₹349 ₹275 more
🚕 Cab₹572 ₹498 more
Powered by ixigo & ONDC

Pre-calculated Weekly/Monthly Fare Chart

The fare shown below is calculated for daily, weekly, and monthly travel which includes both up and down journey and for a single person.

PeriodCashSmart Card
Daily₹148₹137
Weekly (5 days)₹740₹686
Weekly (6 days)₹888₹823
Weekly (7 days)₹1,036₹960
Monthly (20 days)₹2,960₹2,744
Monthly (24 days)₹3,552₹3,293
Monthly (28 days)₹4,144₹3,842

Metro Ride Benefits

  • 🌱 Carbon savings: 4.01 kg CO₂
  • ⛽ Fuel savings: 1.77 litres
  • ⏱ Time saved vs road: 34.2 minutes
  • 🔥 Calories burned (walk to/from station): ~70 kcal

Safety Tips

  • Stand behind the yellow line while waiting for the train.
  • Keep your belongings secure and within sight at all times.
  • Let passengers exit before boarding.
  • Hold handrails while the train is moving.
  • In an emergency, use the help point or alert station staff.
Share route info feedback
Route Info
Fare Info
Timing Info
Platform Info

Address
Cyber City, Road Number 19, U block, DLF Phase 3, Sector 24, Gurugram, Haryana 122002
Network & Line
Gurgaon Metro
Rapid Line
Layout
Elevated
Platform
Side
Areas Around
S Block Balveer Market Sector 24 Nathupur Phase 3
Station Amenities
Accessible

Address
Indira Gandhi International Airport, Terminal 1, Mehram Nagar, New Delhi, Delhi 110037
Network & Line
Delhi Metro
Silver Line
Contact
Layout
Underground
Platform
Island
Areas Around
Mehram Nagar West Dhaula Kuan Mehram Nagar East Sport View Mehram Nagar Terminal 1 IGI Airport
Station Amenities
Accessible
Station Gates
Gate No.Way ToAccessible
1 Mehram Nagar West, Dhaula Kuan
2 Domestic Departure, T-1 Parking
3 Domestic Arrival, G5 Building
4 T-1 IGI Airport, Feeder Bus available
5 T-1 IGI Airport
Train Frequency
PeakOff-Peak
Weekdays 5 min 10 sec 7 min 05 sec
Saturday 6 min 00 sec 9 min 05 sec
Sunday 8 min 00 sec 7 min 45 sec

Phase 3 to Terminal 1 IGI Airport Metro Route FAQs

There are 23 stations between Phase 3 and Terminal 1 IGI Airport on this metro route, spanning a total distance of approximately 26.6 km from end to end.

Yes, this journey starts on the Rapid Line from Phase 3 and ends on the Silver Line at Terminal 1 IGI Airport, so you will need to interchange 2 time(s) along the way.

The journey from Phase 3 to Terminal 1 IGI Airport takes approximately 0 hrs 46 mins at an average metro speed of around 35 km/h, covering 26.6 km in total.

This route starts on Gurgaon Metro at Phase 3 and ends on Delhi Metro at Terminal 1 IGI Airport, so you will interchange between two different operators' systems during the journey.

No, parking facility is not currently available at Phase 3 metro station, so if you are boarding the Rapid Line here, consider a drop-off or nearby alternate parking option.

No, parking facility is not currently available at Terminal 1 IGI Airport metro station, so passengers planning to drive from this end are advised to arrange alternate parking nearby in advance.

The total distance between Phase 3 and Terminal 1 IGI Airport on this metro route is approximately 26.6 km, covered in about 0 hrs 46 mins at typical metro speeds.

Start on the Rapid Line at Phase 3 on Gurgaon Metro, then interchange onto the Silver Line to reach Terminal 1 IGI Airport on the Delhi Metro network at the other end.

The estimated normal fare from Phase 3 to Terminal 1 IGI Airport is ₹74, while smart card users can travel the same 26.6 km route for around ₹69.

The first metro from Phase 3 towards Terminal 1 IGI Airport departs at 06:19 AM, and the last train on this route leaves at 08:09 PM, so plan your journey within this window.
Book Metro Tickets on ixigo — First Free Metro Ticket Book Metro Tickets on ixigo — First Free Metro Ticket
Saved Routes
No saved routes yet. Tap Save Route on any route page.