Find a KMRC Route

Ritwik Ghatak to Maidan Metro Route

Ritwik Ghatak Metro Station is — km away from you

Fare & Timings

Normal Fare: ₹40
Smart Card Fare: ₹32
First Train: 08:16 AM
Last Train: 08:50 PM

Station-by-Station Route

20 stations 1 interchange 25.3 km 0 hrs 51 mins
  1. 1
    Start at Ritwik Ghatak station.
  2. 2
    Board the Orange Line towards Kavi Subhash (New Garia) · from Platform 2
    Ride 7 stops to Kavi Subhash (New Garia).
    Change lines here
  3. 3
    Board the Blue Line towards Dakshineswar · from Platform 1
    Ride 12 stops to Maidan.
  4. Arrive at Maidan station. You have reached your destination. Exit Gates

Kolkata Metro Route Map 2026

Route from Ritwik Ghatak to Maidan on the map.

Download JPG
Loading map…
100%
Ctrl + Scroll to zoom · Drag to pan

Route Summary

How to reach Maidan from Ritwik Ghatak by metro? Board the metro from Ritwik Ghatak station and travel through 18 intermediate metro stations. During the journey, you will need to change train at 1 interchange station(s) before reaching Maidan.

The approximate travel time between Ritwik Ghatak and Maidan is 0 hrs 51 mins. The total distance covered on this metro route is 25.3 Km. The first metro from Ritwik Ghatak departs at 08:16 AM, while the last train leaves at 08:50 PM.

The estimated metro fare for this route is ₹40. Smart card users may receive discounted fares. Parking facility is not available at either Ritwik Ghatak or Maidan station.

Estimated Travel Cost Comparison and Savings based on distance & typical fares in Indian cities.

ModeEst. CostSavings vs Metro
🚇 Metro₹40—
🏍 Bike₹222 ₹182 more
🛺 Auto₹334 ₹294 more
🚕 Cab₹546 ₹506 more

Pre-calculated Weekly/Monthly Fare Chart

The fare shown below is calculated for daily, weekly, and monthly travel which includes both up and down journey and for a single person.

PeriodCashSmart Card
Daily₹80₹64
Weekly (5 days)₹400₹320
Weekly (6 days)₹480₹384
Weekly (7 days)₹560₹448
Monthly (20 days)₹1,600₹1,280
Monthly (24 days)₹1,920₹1,536
Monthly (28 days)₹2,240₹1,792

Commuting with a Kolkata Metro Smart Card saves up to ₹448 per month on this route.

Metro Ride Benefits

  • Carbon savings: 3.82 kg CO₂
  • Fuel savings: 1.69 litres
  • Time saved vs road: 25.3 minutes
  • Calories burned (walk to/from station): ~70 kcal

Safety Tips

  • Stand behind the yellow line while waiting for the train.
  • Keep your belongings secure and within sight at all times.
  • Let passengers exit before boarding.
  • Hold handrails while the train is moving.
  • In an emergency, use the help point or alert station staff.
Share route info feedback
Route Info
Fare Info
Timing Info
Platform Info

Address
EM Bypass, near the Ruby Hospital area in Kolkata
Line & Network
Orange Line Kolkata Metro
Layout
Elevated (Side)
Areas Around
Topsia Uttar Panchanagram Unity One Mall Ritwik Ghatak
Station Amenities
Accessible
ATM

Address
Middleton St, Maidan, Park Street area, Kolkata, West Bengal 700071
Line & Network
Blue Line Kolkata Metro
Layout
Underground (Island)
Areas Around
Vardaan Market Mullick Bazar Park Street area Maidan
Station Amenities
Accessible

Ritwik Ghatak to Maidan Metro Route FAQs

There are 20 stations between Ritwik Ghatak and Maidan on this metro route, spanning a total distance of approximately 25.3 km from end to end.

Yes, this journey starts on the Orange Line from Ritwik Ghatak and ends on the Blue Line at Maidan, so you will need to interchange 1 time(s) along the way.

The journey from Ritwik Ghatak to Maidan takes approximately 0 hrs 51 mins at an average metro speed of around 30 km/h, covering 25.3 km in total.

This entire route from Ritwik Ghatak to Maidan runs on Kolkata Metro.

No, parking facility is not currently available at Ritwik Ghatak metro station, so if you are boarding the Orange Line here, consider a drop-off or nearby alternate parking option.

No, parking facility is not currently available at Maidan metro station, so passengers planning to drive from this end are advised to arrange alternate parking nearby in advance.

The total distance between Ritwik Ghatak and Maidan on this metro route is approximately 25.3 km, covered in about 0 hrs 51 mins at typical metro speeds.

Take the Orange Line from Ritwik Ghatak towards Maidan on Kolkata Metro.

The estimated normal fare from Ritwik Ghatak to Maidan is ₹40, while smart card users can travel the same 25.3 km route for around ₹32.

The first metro from Ritwik Ghatak towards Maidan departs at 08:16 AM, and the last train on this route leaves at 08:50 PM, so plan your journey within this window.
Book Metro Tickets on ixigo — First Free Metro Ticket Book Metro Tickets on ixigo — First Free Metro Ticket
Saved Routes
No saved routes yet. Tap Save Route on any route page.