Find a BMRC Route

Sir M. Visveshwaraya Station (Central College) to Attiguppe Metro Route

Sir M. Visveshwaraya Station (Central College) Metro Station is — km away from you

Fare & Timings

Normal Fare: ₹40
Smart Card Fare: ₹38
First Train: 05:42 AM
Last Train: 11:27 PM
Powered by ixigo & ONDC

Station-by-Station Route

7 stations 0 interchanges 6.1 km 0 hrs 10 mins
  1. 1
    Start at Sir M. Visveshwaraya Station (Central College) station. Entry Gates
  2. 2
    Board the Purple Line towards Challaghatta · from Platform 2
    Ride 7 stops to Attiguppe.
  3. Arrive at Attiguppe station. You have reached your destination. Exit Gates

Bangalore Metro Route Map 2026

Route from Sir M. Visveshwaraya Station (Central College) to Attiguppe on the map.

Download JPG
Loading map…
100%
Ctrl + Scroll to zoom · Drag to pan

Route Summary

How to reach Attiguppe from Sir M. Visveshwaraya Station (Central College) by metro? Board the metro from Sir M. Visveshwaraya Station (Central College) station and travel through 5 intermediate metro stations. This is a direct route on the same line, with no train change required before reaching Attiguppe.

The approximate travel time between Sir M. Visveshwaraya Station (Central College) and Attiguppe is 0 hrs 10 mins. The total distance covered on this metro route is 6.1 Km. The first metro from Sir M. Visveshwaraya Station (Central College) departs at 05:42 AM, while the last train leaves at 11:27 PM.

The estimated metro fare for this route is ₹40. Smart card users may receive discounted fares. Parking facility is available at Attiguppe station.

Estimated Travel Cost Comparison and Savings based on distance & typical fares in Indian cities.

ModeEst. CostSavings vs Metro
🚇 Metro₹40—
🏍 Bike₹69 ₹29 more
🛺 Auto₹103 ₹63 more
🚕 Cab₹162 ₹122 more
Powered by ixigo & ONDC

Pre-calculated Weekly/Monthly Fare Chart

The fare shown below is calculated for daily, weekly, and monthly travel which includes both up and down journey and for a single person.

PeriodCashSmart Card
Daily₹80₹76
Weekly (5 days)₹400₹380
Weekly (6 days)₹480₹456
Weekly (7 days)₹560₹532
Monthly (20 days)₹1,600₹1,520
Monthly (24 days)₹1,920₹1,824
Monthly (28 days)₹2,240₹2,128

Commuting with a Bangalore Metro Smart Card saves up to ₹112 per month on this route.

Metro Ride Benefits

  • Carbon savings: 0.92 kg CO₂
  • Fuel savings: 0.41 litres
  • Time saved vs road: 7.8 minutes
  • Calories burned (walk to/from station): ~70 kcal

Safety Tips

  • Stand behind the yellow line while waiting for the train.
  • Keep your belongings secure and within sight at all times.
  • Let passengers exit before boarding.
  • Hold handrails while the train is moving.
  • In an emergency, use the help point or alert station staff.
Share route info feedback
Route Info
Fare Info
Timing Info
Platform Info

Address
Post Office Road, Ambedkar Veedhi, Sampangi Rama Nagar, Bengaluru, Karnataka 560009
Line & Network
Purple Line Bangalore Metro
Layout
Underground (Island)
Areas Around
Bengaluru City University Nrupathunga University Sir M. Visveshwaraya Station (Central College)
Station Amenities
Accessible

Address
Chord Road, Govindaraja Nagar Ward, Attiguppe, Bengaluru, Karnataka 560040
Line & Network
Purple Line Bangalore Metro
Layout
Elevated (Side)
Areas Around
RPC Layout 2nd Stage Maruthi Nagar Byraveshwaranagar Attiguppe
Station Amenities
Parking
Accessible
Feeder Bus

Sir M. Visveshwaraya Station (Central College) to Attiguppe Metro Route FAQs

There are 7 stations between Sir M. Visveshwaraya Station (Central College) and Attiguppe on this metro route, spanning a total distance of approximately 6.1 km from end to end.

No, Sir M. Visveshwaraya Station (Central College) to Attiguppe runs entirely on the Purple Line, so you can stay on the same train for the whole journey without switching platforms or lines.

The journey from Sir M. Visveshwaraya Station (Central College) to Attiguppe takes approximately 0 hrs 10 mins at an average metro speed of around 35 km/h, covering 6.1 km in total.

This entire route from Sir M. Visveshwaraya Station (Central College) to Attiguppe runs on Bangalore Metro.

No, parking facility is not currently available at Sir M. Visveshwaraya Station (Central College) metro station, so if you are boarding the Purple Line here, consider a drop-off or nearby alternate parking option.

Yes, parking facility is available at Attiguppe metro station, making it convenient for passengers arriving from Sir M. Visveshwaraya Station (Central College) to leave their vehicle if they plan to drive onward afterwards.

The total distance between Sir M. Visveshwaraya Station (Central College) and Attiguppe on this metro route is approximately 6.1 km, covered in about 0 hrs 10 mins at typical metro speeds.

Take the Purple Line from Sir M. Visveshwaraya Station (Central College) towards Attiguppe on Bangalore Metro.

The estimated normal fare from Sir M. Visveshwaraya Station (Central College) to Attiguppe is ₹40, while smart card users can travel the same 6.1 km route for around ₹38.

The first metro from Sir M. Visveshwaraya Station (Central College) towards Attiguppe departs at 05:42 AM, and the last train on this route leaves at 11:27 PM, so plan your journey within this window.
Book Metro Tickets on ixigo — First Free Metro Ticket Book Metro Tickets on ixigo — First Free Metro Ticket
Saved Routes
No saved routes yet. Tap Save Route on any route page.