Find a BMRC Route

Swami Vivekananda Road to Thalaghattapura Metro Route

Swami Vivekananda Road Metro Station is km away from you

Fare & Timings

Normal Fare: ₹80
Smart Card Fare: ₹76
First Train: 05:28 AM
Last Train: 11:13 PM
Powered by ixigo & ONDC

Station-by-Station Route

24 stations 1 interchange 23.2 km 0 hrs 40 mins
  1. 1
    Start at Swami Vivekananda Road station.
  2. 2
    Board the Purple Line towards Challaghatta · from Platform 2
    Ride 9 stops to Nadaprabhu Kempegowda station (Majestic).
    Change lines here
  3. 3
    Board the Green Line towards Silk Institute · from Platform 4
    Ride 14 stops to Thalaghattapura.
  4. Arrive at Thalaghattapura station. You have reached your destination.

Bangalore Metro Route Map 2026

Route from Swami Vivekananda Road to Thalaghattapura on the map.

Loading map…
100%
Ctrl + Scroll to zoom · Drag to pan

Route Summary

How to reach Thalaghattapura from Swami Vivekananda Road by metro? Board the metro from Swami Vivekananda Road station and travel through 22 intermediate metro stations. During the journey, you will need to change train at 1 interchange station(s) before reaching Thalaghattapura.

The approximate travel time between Swami Vivekananda Road and Thalaghattapura is 0 hrs 40 mins. The total distance covered on this metro route is 23.2 Km. The first metro from Swami Vivekananda Road departs at 05:28 AM, while the last train leaves at 11:13 PM.

The estimated metro fare for this route is ₹80. Smart card users may receive discounted fares. Parking facility is available at Swami Vivekananda Road station.

Estimated Travel Cost Comparison and Savings based on distance & typical fares in Indian cities.

ModeEst. CostSavings vs Metro
🚇 Metro₹80
🏍 Bike₹205 ₹125 more
🛺 Auto₹308 ₹228 more
🚕 Cab₹503 ₹423 more
Powered by ixigo & ONDC

Pre-calculated Weekly/Monthly Fare Chart

The fare shown below is calculated for daily, weekly, and monthly travel which includes both up and down journey and for a single person.

PeriodCashSmart Card
Daily₹160₹152
Weekly (5 days)₹800₹760
Weekly (6 days)₹960₹912
Weekly (7 days)₹1,120₹1,064
Monthly (20 days)₹3,200₹3,040
Monthly (24 days)₹3,840₹3,648
Monthly (28 days)₹4,480₹4,256

Metro Ride Benefits

  • 🌱 Carbon savings: 3.50 kg CO₂
  • ⛽ Fuel savings: 1.54 litres
  • ⏱ Time saved vs road: 29.8 minutes
  • 🔥 Calories burned (walk to/from station): ~70 kcal

Safety Tips

  • Stand behind the yellow line while waiting for the train.
  • Keep your belongings secure and within sight at all times.
  • Let passengers exit before boarding.
  • Hold handrails while the train is moving.
  • In an emergency, use the help point or alert station staff.
Share route info feedback
Route Info
Fare Info
Timing Info
Platform Info

Address
Old Madras Road, New Baiyyappanahalli Extension, Sarvagnanagar, Bengaluru, Karnataka 560038
Network & Line
Bangalore Metro
Purple Line
Layout
Elevated
Platform
Side
Areas Around
Krishnamurti Nagar Michael Palaya Suddaguntapalya Bayarappa Layout Swami Vivekananda Road
Station Amenities
Parking
Accessible
Feeder Bus
Station Gates
Gate No.Way ToAccessible
A
B

Address
Kanakapura Road, Paramount Gardens, Talaghattapura, Bengaluru, Vajarahalli, Karnataka 560062
Network & Line
Bangalore Metro
Green Line
Layout
Elevated
Platform
Side
Areas Around
Vajarahalli Ganigarapalya Adarsha Layout Reshme nagara Thalaghattapura
Station Amenities
Accessible
Station Gates
Gate No.Way ToAccessible
A Towards Post Office side
B Towards SJS Enterprises Pvt. Ltd. side

Swami Vivekananda Road to Thalaghattapura Metro Route FAQs

There are 24 stations between Swami Vivekananda Road and Thalaghattapura on this metro route, spanning a total distance of approximately 23.2 km from end to end.

Yes, this journey starts on the Purple Line from Swami Vivekananda Road and ends on the Green Line at Thalaghattapura, so you will need to interchange 1 time(s) along the way.

The journey from Swami Vivekananda Road to Thalaghattapura takes approximately 0 hrs 40 mins at an average metro speed of around 35 km/h, covering 23.2 km in total.

This entire route from Swami Vivekananda Road to Thalaghattapura runs on Bangalore Metro.

Yes, parking facility is available at Swami Vivekananda Road metro station, so you can conveniently park your vehicle here before boarding the Purple Line towards Thalaghattapura.

No, parking facility is not currently available at Thalaghattapura metro station, so passengers planning to drive from this end are advised to arrange alternate parking nearby in advance.

The total distance between Swami Vivekananda Road and Thalaghattapura on this metro route is approximately 23.2 km, covered in about 0 hrs 40 mins at typical metro speeds.

Take the Purple Line from Swami Vivekananda Road towards Thalaghattapura on Bangalore Metro.

The estimated normal fare from Swami Vivekananda Road to Thalaghattapura is ₹80, while smart card users can travel the same 23.2 km route for around ₹76.

The first metro from Swami Vivekananda Road towards Thalaghattapura departs at 05:28 AM, and the last train on this route leaves at 11:13 PM, so plan your journey within this window.
Book Metro Tickets on ixigo — First Free Metro Ticket Book Metro Tickets on ixigo — First Free Metro Ticket
Saved Routes
No saved routes yet. Tap Save Route on any route page.