Find a MPMRC Route
● Yellow Line
Indore Metro Yellow Line Overview
Yellow Line Station List 2026 (16 Active)
Parking Feeder Bus ATM Restroom
| # | Station | Amenities |
|---|---|---|
| 1 |
Devi Ahilya Bai Holkar Terminal
|
|
| 2 |
Maharani Lakshmi Bai
|
|
| 3 |
Rani Avanti Bai Lodhi
|
|
| 4 |
Rani Durgavati
|
|
| 5 |
Veerangana Jhalkari Bai
|
|
| 6 |
Super Corridor 2
|
|
| 7 |
Super Corridor 1
|
|
| 8 |
Bhawarshala Chauraha
|
|
| 9 |
MR 10 Road
|
|
| 10 |
ISBT
|
|
| 11 |
Chandragupta Chauraha
|
|
| 12 |
Hira Nagar
|
|
| 13 |
Bapat Chauraha
|
|
| 14 |
Meghdoot Garden
|
|
| 15 |
Vijay Nagar Chauraha
|
|
| 16 |
Malviya Nagar Chauraha
|
Yellow Line Route Map 2026
Pan and zoom to explore the MPMRC Yellow Line.
Yellow Line History, Facts & Expansion
- Yellow Line is an active metro rail line of Indore Metro, operated by the Madhya Pradesh Metro Rail Corporation Limited (MPMRCL).
- The Yellow Line is planned as a 33.53 km corridor with 29 metro stations, connecting Devi Ahilya Bai Holkar Terminal with the Airport through major areas of Indore.
- As of September 2026, 16 stations are operational over approximately 17 km, with the operational section extended from Devi Ahilya Bai Holkar Terminal to Radisson Square on 6 September 2026.
- The remaining section from Radisson Square towards Rajwada, Indore Railway Station and the Airport is under construction and will complete the full 29-station corridor.
- The corridor includes elevated and underground sections, with the underground section planned around Rajwada, Indore Railway Station, Bada Ganpati and the Airport area.
Indore Metro Yellow Line Extension
The Yellow Line of the Indore Metro is being developed as a major ring corridor connecting key areas of the city, including Devi Ahilya Bai Holkar Terminal, Super Corridor, Radisson Square, Rajwada, Indore Railway Station and the Airport. The planned corridor will span 33.53 kilometers and have 29 stations.
As of September 2026, 16 stations covering approximately 17 kilometers are operational, following the opening of the 11-kilometer extension from Super Corridor-3 to Malviya Nagar Chauraha (Radisson Square) on 6 September 2026. The remaining 14-kilometer section from Radisson Square to Devi Ahilya Bai Holkar International Airport is under construction and is scheduled for completion by the end of 2030.
The remaining extension will include both elevated and underground sections, including approximately 8.6 kilometers of underground metro alignment. Once completed, the Yellow Line will provide a continuous connection between the eastern and northern parts of Indore, the city centre, railway station and the airport.
Yellow Line FAQs
Indore Yellow Line Metro Timings
The Indore Yellow Line Metro runs daily between Devi Ahilya Bai Holkar Terminal and Veerangana Jhalkari Bai Square.
Indore Yellow Line Metro Timings (Monday to Sunday):
- First train: 08:00:00 AM
- Last train: 08:00:00 PM