Find a JMRC Route
● Pink Line
Jaipur Metro Pink Line Overview
Pink Line Station List 2026 (11 Active)
Parking Feeder Bus ATM Restroom
| # | Station | Amenities |
|---|---|---|
| 1 |
Mansarovar
|
|
| 2 |
New Aatish Market
|
|
| 3 |
Vivek Vihar
|
|
| 4 |
Shyam Nagar
|
|
| 5 |
Ram Nagar
|
|
| 6 |
Civil Lines
|
|
| 7 |
Railway Station
|
|
| 8 |
Sindhi Camp
Interchange
|
|
| 9 |
Chandpole
|
|
| 10 |
Chhoti Chaupar
|
|
| 11 |
Badi Chaupar
|
Pink Line Route Map 2026
Pan and zoom to explore the JMRC Pink Line.
Pink Line History, Facts & Expansion
- The Pink Line, Jaipur's East-West corridor, is named after Jaipur's famous title, the Pink City.
- The Mansarovar-Chandpole section opened on 3 June 2015.
- The Phase 1B underground extension from Chandpole to Badi Chaupar opened on 23 September 2020.
- The line is about 12 km long with 11 stations, including underground stations in the Walled City.
- It connects Mansarovar with Sindhi Camp Bus Stand, Jaipur Junction area, Chandpole and Badi Chaupar near Hawa Mahal.
- The line is operated by Jaipur Metro Rail Corporation (JMRC).
- Badi Chaupar and Chhoti Chaupar are underground stations built within the UNESCO-listed Walled City of Jaipur.
- The underground stations were designed with architecture reflecting Jaipur's heritage.
- Mansarovar is the line's western terminus and has the depot.
- The line is mostly elevated from Mansarovar to Chandpole.
Jaipur Metro Pink Line Phase-wise Expansion
Phase 1A (2015) (Completed)
Mansarovar-Chandpole, about 9.6 km with 9 stations, opened on 3 June 2015.
Phase 1B (2020) (Completed)
Chandpole-Badi Chaupar, about 2.3 km underground with 2 stations, opened on 23 September 2020.
Phase 1C: Badi Chaupar-Transport Nagar (Under construction)
Approved in 2022; revised alignment finalised in 2026 via a new underground station near Galta Ji crossing to an elevated Transport Nagar terminal; completion around July 2028.
Phase 1D: Mansarovar-Ajmer Road (DPR prepared)
An elevated extension of about 1.3 km with one station; awaiting implementation.
Pink Line FAQs
Jaipur Metro Pink Line Timings
Jaipur Metro Pink Line runs on regular schedule throughout the week between Mansarovar and Badi Chaupar.
Jaipur Metro Pink Line Timings from Monday to Saturday:
- First train: 05:20:00 AM (Mansarovar to Badi Chaupar) | 05:20:00 AM (Badi Chaupar to Mansarovar)
- Last train: 22:21:00 PM
Jaipur Metro Pink Line Timings on Sunday:
- First train: 05:20:00 AM (Mansarovar to Badi Chaupar) | 05:20:00 (Badi Chaupar to Mansarovar)
- Last train: 22:21:00 PM