Jaipur Pink Line Metro Route, Stations List, Map & Timings

LINE COLOR
Pink
LENGTH OF LINE
12 KM
ACTIVE STATION
11
INACTIVE STATION
0
TERMINAL ONE-SIDE
TERMINAL OTHER-SIDE

Overview & Facts of Pink line metro Jaipur

The Pink Line is a metro line of the Jaipur Metro, a rapid transit system in Jaipur, India. It consists of 11 active stations of all Jaipur Metro network. Explore Pink Line metro route details, also stations list, route map, interchange, fares, time and distance between source and destination, and top attractions nearby etc. YoMetro helps you with information about the Jaipur Metro route, first/last train timings, metro route map, fare chart, interchange, top tourist attractions near a metro station, metro news and more.

Interesting facts about Jaipur Metro Pink line

  • The Jaipur metro Pink line known by our second name is the East-West Corridor of Jaipur.
  • Jaipur metro Pink line has been named as Pink Line, as the line passes through the Pink City.
  • This is the Metro line that got flagged off on 3 June 2015.
  • For Phase 1C, Jaipur Metro Rail Corporation (JMRC) plans to extend the Pink Line from Badi Chaupar to Transport Nagar.
  • According to the extension plan of DPR, the estimated project cost will be Rs 856 crore.
  • The total length of the project will be 2.85km (2.26km Underground and 0.59km Elevated).
  • This project is expected to be completed by March 2025 if the construction takes place.

Jaipur Metro Pink Line Extension in Phase 1C and Phase 1D

Under Phase 1C, the Jaipur Metro Rail Corporation (JMRC) plans to extend the Pink Line from Badi Chaupar to Transport Nagar. The total length of the metro line will be 2.85 km, consisting of 2.26 km underground and 0.59 km elevated. The project was scheduled to be completed by March 2025 but fell short of schedule. After completion, the Mansarovar to Transport Nagar route is expected to carry approximately 1.38 lakh passengers daily by 2031.

For Phase 1D, the Jaipur Metro Rail Corporation (JMRC) plans to extend the Pink Line from Mansarovar to Ajmer Road. The corporation has prepared a detailed project report (DPR) for Phase 1 after gathering public input. According to the DPR, the total length of the project will be 1.312 km, including an elevated station on Ajmer Road and a 0.357 km loop line.

Jaipur Metro Pink Line Stations List

Sign: Interchange, 🅿️ Parking, 🚌 Feeder Bus, 🏧 ATMs️

Station🅿️🚌️🏧️
Mansarovar
New Aatish Market
Vivek Vihar
Shyam Nagar
Ram Nagar
Civil Lines
Railway Station
Sindhi Camp ⨝ Interchange
Chandpole
Chhoti Chaupar
Badi Chaupar

Jaipur Metro Pink Line Route Map 2026

The Jaipur Pink Line Metro connects Mansarovar to Badi Chaupar, providing seamless travel to locations near by Pink Line Metro stations. Check out the latest Jaipur Metro Pink Line Map below to view stations and interchanges:

Download Line Map

Jaipur Metro Network Map 2026

Explore the new Jaipur Metro Metro Network Map 2026 with updated routes and terminal stations:

Jaipur Metro News & Updates

Get the latest news and developments updates from Jaipur Metro Pink Line, including new routes openings, extension plans and official announcements etc:

The Rajasthan Metro Rail Corporation Limited (RMRC) has received bids from 13 firms for the first civil contract of Jaipur Metro Phase 2. In October 2025, RMRC had issued a tender for this contract worth Rs 1145.14 crore and it falls under package NCB: 2C-01.

◷ 2026-01-12 | Metro Rail News

Line 2 of the Jaipur Metro is set to significantly improve connectivity to the city's airport, with plans to provide direct underground passage from the Airport Metro Station to all passenger terminals. Following recent consultations between the Jaipur Metro Rail Corporation (JMRC) and airport authorities, it was confirmed that passengers will be able to travel between the metro station and the three terminals via dedicated tunnels and supported shuttle services. Jaipur Airport, which currently operates with two terminal buildings, will have a third addition when Line 2 becomes operational.

◷ 2025-12-28 | Swarajya Marg

The Jaipur Metro project progressed as the Detailed Project Report (DPR) for Phase-2 of the Jaipur Metro Rail Project was approved during the Public Investment Board (PIB) meeting chaired by the Secretary, Department of Expenditure, Union Ministry of Finance on December 11. The Detailed Project Report (DPR) for Phase-II of the Jaipur Metro describes the main transit corridor stretching in the north-south direction, covering 42.80 km from Todi Mor to Prahladpura and comprising 36 proposed stations.

◷ 2025-12-12 | Metro Rail News

There is confusion regarding the expansion of Metro Line 1C in Jaipur. The state government has decided to conduct a feasibility survey for this project once again. After this decision, not only questions have started being raised on the project, but resentment has also increased regarding the traffic restrictions imposed on Jaipur-Delhi Road for two years.

◷ 2025-07-25 | Patrika

This morning, Jaipur Metro trains suddenly developed a technical fault, due to which the movement of the metro was disrupted for about two and a half hours. Thousands of people who left for work early in the morning were stranded at the station and had to face a lot of trouble due to the delay. According to the Metro administration, this problem occurred at around six in the morning. There was a technical fault in the software system of the metro running from Mansarovar to Badi Chaupad. This disrupted the operation of trains. Due to technical fault, some trains got delayed from their scheduled time.

◷ 2025-07-08 | Patrika

Jaipur Metro Pink Line Route FAQs

Explore frequently asked questions regarding the Jaipur Pink Line Metro, its connectivity, timing, interchange and more:

𝒜. The Jaipur Metro Pink Line has a total of 11 stations. Out of these, 11 stations are operational, 0 stations are under construction, and 0 stations are planned or approved. The line runs from Mansarovar to Badi Chaupar.

𝒜. The Jaipur Metro Pink line has 1 interchange stations those are connected with other lines of the metro. The name of interchange stations are: Sindhi Camp, .

𝒜. Yes, the Jaipur Metro Pink Line is operational today. It runs as per scheduled timings. For updates on delays or maintenance, check the official Jaipur Metro Rail Corporation (JMRC) website or app.

𝒜. The length of Jaipur Metro Pink Line is 12 KM, and it's terminal stations are Mansarovar and Badi Chaupar.

Top Attractions covered by Jaipur Metro Pink Line

Discover the major tourist attractions and key places along the Jaipur Metro Pink Line route:

Jaipur Metro Lines and Routes

Explore all Jaipur Metro lines beyond the Pink Line, including major routes and connections: