● Green Line
Gujarat Metro Rail Corporation Limited
Under Construction
18
Stations
18 Construction
19.26 km
Line Length
Surat Metro Green Line Overview
The Green Line (Line 2) of Surat Metro is an under-construction elevated corridor of about 18.7 km from Bhesan to Saroli with 18 stations. It will link western Surat with the textile market areas in the east and interchange with the Red Line in the city centre. The line is being built by Gujarat Metro Rail Corporation and is expected to open by December 2027. Explore the planned Surat Metro Green Line route, proposed stations, interchange points, current construction status and latest project updates.
Green Line Station List 2026 (0 Active)
Parking Feeder Bus ATM Restroom
Under Construction ·
Proposed
Bhesan
Botanical Garden
Ugat Varigruh
Palanpur Road
LP Savani School
Performing Art Centre
Adajan Gam
Jagdishchandra Bose Aquarium
Badri Narayan Temple
Athwa Chopati
Majura Gate
Interchange
Udhna Darwaja
Kamela Darwaja
Anjana Farm
Model Town
Magob
Bharat Cancer Hospital
Saroli
Green Line Route Map 2026
Pan and zoom to explore the GMRC Green Line.
Loading map…
100%
Ctrl + Scroll to zoom · Drag to pan
Green Line History, Facts & Expansion
- The Green Line is Surat Metro Line 2, from Bhesan to Saroli.
- It is about 18.7 km long and fully elevated, with 18 stations.
- The project is being built by Gujarat Metro Rail Corporation (GMRC).
- It will serve Adajan, the textile market belt and Saroli in eastern Surat.
- It will interchange with the Red Line in central Surat.
- The line is expected to open by December 2027.
- The line will serve Surat's textile market belt.
- Adajan is one of Surat's major residential areas.
- Trains will be 3-coach sets.
- GMRC is implementing.
Surat Metro Green Line Phase-wise Expansion
Phase 1 Construction (Under construction)
Viaduct and stations in progress.
Phase 1 Opening (Planned)
By December 2027.
Future (Proposed)
Further corridors may be planned.
Other Surat Metro Lines
Red Line
20 station