Surat Metro logo

● Red Line

Gujarat Metro Rail Corporation Limited
Under Construction
20
Stations
20 Construction
22.77 km
Line Length

Surat Metro Red Line Overview

The Red Line (Line 1) of Surat Metro is an under-construction corridor of about 21.6 km from Sarthana to DREAM City with 20 stations, including an underground section through the old city near Surat railway station. Trial runs began in 2026 on the elevated DREAM City-Althan Tenement stretch, which is targeted to open first. The full line is expected by December 2027. Explore the planned Surat Metro Red Line route, proposed stations, interchange points, current construction status and latest project updates.

Red Line Station List 2026 (0 Active)

Parking  Feeder Bus  ATM  Restroom

Under Construction  ·  Proposed
Sarthana
Nature Park
Varachha Chopati Garden
Shri Swaminarayan Mandir Kalakunj
Kapodra
Labheshwar Chowk
Central Warehouse
Surat Railway Station
Maskati Hospital
Gandhi Baug
Kadarsha Ni Naal
Majura Gate Interchange
Rupali Canal
Althan Tenament
Althan Gam
VIP Road
Woman ITI
Bhimrad
Convention Center
DREAM City

Red Line Route Map 2026

Pan and zoom to explore the GMRC Red Line.

Download JPG
Surat Metro Red Line Route Map 2026
Loading map…
100%
Ctrl + Scroll to zoom · Drag to pan

Red Line History, Facts & Expansion

  • The Red Line is Surat Metro Line 1, from Sarthana to DREAM City.
  • It is about 21.6 km long with 20 stations, of which about 6.5 km is underground.
  • The project is being built by Gujarat Metro Rail Corporation (GMRC).
  • Trial runs began in 2026 on the roughly 8.5 km DREAM City-Althan Tenement elevated section.
  • The DREAM City-Althan Tenement section is targeted to open first, with the full line expected by December 2027.
  • It will interchange with the Green Line in central Surat.
  • Surat Metro Phase 1 covers about 40 km across two lines.
  • Surat railway station will be served by an underground station.
  • Trains will be 3-coach sets.
  • GMRC is also building the Ahmedabad Metro.

Surat Metro Red Line Phase-wise Expansion

Phase 1 - Stage 1: DREAM City-Althan Tenement (Trials)

About 8.5 km; trials since 2026.

Phase 1 - Stage 2: Althan Tenement-Sarthana (Under construction)

Including underground section; full line by December 2027.

Future (Proposed)

Further corridors in Surat may be planned.

Other Surat Metro Lines

Green Line 18 station
Book Metro Tickets on ixigo — First Free Metro Ticket Book Metro Tickets on ixigo — First Free Metro Ticket
Saved Routes
No saved routes yet. Tap Save Route on any route page.