- 1
-
2
Board the Blue Line towards Noida Electronic City · from Platform 1
Ride 2 stops to Kirti Nagar.Change lines here -
3
Board the Green Branch Line towards Brigadier Hoshiar Singh · from Platform 3
Ride 17 stops to Ghevra.
Find a DMRC Route
Moti Nagar to Ghevra Metro Route
Fare & Timings
- 1
-
2
Board the Blue Line towards Noida Electronic City · from Platform 1
Ride 2 stops to Kirti Nagar.Change lines here -
3
Board the Green Branch Line towards Brigadier Hoshiar Singh · from Platform 3
Ride 2 stops to Ashok Park Main.Change lines here -
4
Board the Green Line towards Brigadier Hoshiar Singh · from Platform 1
Ride 15 stops to Ghevra.
Delhi Metro Route Map 2026
Route from Moti Nagar to Ghevra on the map.
Route Summary
How to reach Ghevra from Moti Nagar by metro? Board the metro from Moti Nagar station and travel through 18 intermediate metro stations. During the journey, you will need to change train at 1 interchange station(s) before reaching Ghevra.
The approximate travel time between Moti Nagar and Ghevra is 0 hrs 25 mins. The total distance covered on this metro route is 18.5 Km. The first metro from Moti Nagar departs at 06:09 AM, while the last train leaves at 11:30 PM.
The estimated metro fare for this route is ₹43. Smart card users may receive discounted fares. Parking facility is available at Moti Nagar station.
Estimated Travel Cost Comparison and Savings based on distance & typical fares in Indian cities.
| Mode | Est. Cost | Savings vs Metro |
|---|---|---|
| 🚇 Metro | ₹43 | — |
| 🏍 Bike | ₹168 | ₹125 more |
| 🛺 Auto | ₹252 | ₹209 more |
| 🚕 Cab | ₹411 | ₹368 more |
Pre-calculated Weekly/Monthly Fare Chart
The fare shown below is calculated for daily, weekly, and monthly travel which includes both up and down journey and for a single person.
| Period | Cash | Smart Card |
|---|---|---|
| Daily | ₹86 | ₹77 |
| Weekly (5 days) | ₹430 | ₹387 |
| Weekly (6 days) | ₹516 | ₹464 |
| Weekly (7 days) | ₹602 | ₹542 |
| Monthly (20 days) | ₹1,720 | ₹1,548 |
| Monthly (24 days) | ₹2,064 | ₹1,858 |
| Monthly (28 days) | ₹2,408 | ₹2,167 |
Metro Ride Benefits
- 🌱 Carbon savings: 2.80 kg CO₂
- ⛽ Fuel savings: 1.24 litres
- ⏱ Time saved vs road: 30.9 minutes
- 🔥 Calories burned (walk to/from station): ~70 kcal
Safety Tips
- Stand behind the yellow line while waiting for the train.
- Keep your belongings secure and within sight at all times.
- Let passengers exit before boarding.
- Hold handrails while the train is moving.
- In an emergency, use the help point or alert station staff.
| Gate No. | Way To | Accessible |
|---|---|---|
| 1 | Moti Nagar Market | |
| 2 | Fun Cinema | |
| 3 | Kalra Hospital | |
| 4 | Kirti Nagar |
| Peak | Off-Peak | |
|---|---|---|
| Weekdays | 2 min 46 sec | 3 min 30 sec |
| Saturday | 3 min 15 sec | 3 min 30 sec |
| Sunday | 4 min 15 sec | 4 min 30 sec |
| Gate No. | Way To | Accessible |
|---|---|---|
| 1 | Shri Vaishno Devi Mandir, Neelwal Gaon, Late Sahib Singh Verma Swabhimam Sthal, and Hiran Kudna Mor | |
| 2 | Ghevra Railway Station, Ghevra Village, Sawda Colony |