Find a KMRC Route

Netaji to Salt Lake Sector V Metro Route

Netaji Metro Station is — km away from you

Fare & Timings

Normal Fare: ₹50
Smart Card Fare: ₹40
First Train: 07:03 AM
Last Train: 09:55 PM

Station-by-Station Route

19 stations 1 interchange 28 km 0 hrs 56 mins
  1. 1
    Start at Netaji station.
  2. 2
    Board the Blue Line towards Dakshineswar · from Platform 1
    Ride 10 stops to Esplanade.
    Change lines here
  3. 3
    Board the Green Line towards Salt Lake Sector V · from Platform 1
    Ride 8 stops to Salt Lake Sector V.
  4. Arrive at Salt Lake Sector V station. You have reached your destination.

Kolkata Metro Route Map 2026

Route from Netaji to Salt Lake Sector V on the map.

Download JPG
Loading map…
100%
Ctrl + Scroll to zoom · Drag to pan

Route Summary

How to reach Salt Lake Sector V from Netaji by metro? Board the metro from Netaji station and travel through 17 intermediate metro stations. During the journey, you will need to change train at 1 interchange station(s) before reaching Salt Lake Sector V.

The approximate travel time between Netaji and Salt Lake Sector V is 0 hrs 56 mins. The total distance covered on this metro route is 28 Km. The first metro from Netaji departs at 07:03 AM, while the last train leaves at 09:55 PM.

The estimated metro fare for this route is ₹50. Smart card users may receive discounted fares. Parking facility is available at Netaji station.

Estimated Travel Cost Comparison and Savings based on distance & typical fares in Indian cities.

ModeEst. CostSavings vs Metro
🚇 Metro₹50—
🏍 Bike₹244 ₹194 more
🛺 Auto₹366 ₹316 more
🚕 Cab₹600 ₹550 more

Pre-calculated Weekly/Monthly Fare Chart

The fare shown below is calculated for daily, weekly, and monthly travel which includes both up and down journey and for a single person.

PeriodCashSmart Card
Daily₹100₹80
Weekly (5 days)₹500₹400
Weekly (6 days)₹600₹480
Weekly (7 days)₹700₹560
Monthly (20 days)₹2,000₹1,600
Monthly (24 days)₹2,400₹1,920
Monthly (28 days)₹2,800₹2,240

Commuting with a Kolkata Metro Smart Card saves up to ₹560 per month on this route.

Metro Ride Benefits

  • Carbon savings: 4.23 kg CO₂
  • Fuel savings: 1.87 litres
  • Time saved vs road: 28.0 minutes
  • Calories burned (walk to/from station): ~70 kcal

Safety Tips

  • Stand behind the yellow line while waiting for the train.
  • Keep your belongings secure and within sight at all times.
  • Let passengers exit before boarding.
  • Hold handrails while the train is moving.
  • In an emergency, use the help point or alert station staff.
Share route info feedback
Route Info
Fare Info
Timing Info
Platform Info

Address
Chandi Ghosh Road, Banerjee Para, Tollygunge, Kolkata, West Bengal 700041
Line & Network
Blue Line Kolkata Metro
Layout
Elevated (Side)
Areas Around
Kudghat Ashok Nagar Haridevpur Moor Avenue Netaji
Station Amenities
Accessible
Parking

Address
CM Block, Sector V, Bidhannagar, West Bengal 700091
Line & Network
Green Line Kolkata Metro
Layout
Elevated (Side)
Areas Around
CL Block Bidhannagar DN Block Bidhannagar EE Block Bidhannagar Salt Lake Sector V
Station Amenities
Accessible
ATM

Netaji to Salt Lake Sector V Metro Route FAQs

There are 19 stations between Netaji and Salt Lake Sector V on this metro route, spanning a total distance of approximately 28 km from end to end.

Yes, this journey starts on the Blue Line from Netaji and ends on the Green Line at Salt Lake Sector V, so you will need to interchange 1 time(s) along the way.

The journey from Netaji to Salt Lake Sector V takes approximately 0 hrs 56 mins at an average metro speed of around 30 km/h, covering 28 km in total.

This entire route from Netaji to Salt Lake Sector V runs on Kolkata Metro.

Yes, parking facility is available at Netaji metro station, so you can conveniently park your vehicle here before boarding the Blue Line towards Salt Lake Sector V.

No, parking facility is not currently available at Salt Lake Sector V metro station, so passengers planning to drive from this end are advised to arrange alternate parking nearby in advance.

The total distance between Netaji and Salt Lake Sector V on this metro route is approximately 28 km, covered in about 0 hrs 56 mins at typical metro speeds.

Take the Blue Line from Netaji towards Salt Lake Sector V on Kolkata Metro.

The estimated normal fare from Netaji to Salt Lake Sector V is ₹50, while smart card users can travel the same 28 km route for around ₹40.

The first metro from Netaji towards Salt Lake Sector V departs at 07:03 AM, and the last train on this route leaves at 09:55 PM, so plan your journey within this window.
Book Metro Tickets on ixigo — First Free Metro Ticket Book Metro Tickets on ixigo — First Free Metro Ticket
Saved Routes
No saved routes yet. Tap Save Route on any route page.