Find a KMRC Route

Salt Lake Sector V to Netaji Metro Route

Salt Lake Sector V Metro Station is — km away from you

Fare & Timings

Normal Fare: ₹50
Smart Card Fare: ₹40
First Train: 06:55 AM
Last Train: 09:52 PM

Station-by-Station Route

19 stations 1 interchange 28 km 0 hrs 56 mins
  1. 1
    Start at Salt Lake Sector V station.
  2. 2
    Board the Green Line towards Howrah Maidan · from Platform 2
    Ride 9 stops to Esplanade.
    Change lines here
  3. 3
    Board the Blue Line towards Kavi Subhash (New Garia) · from Platform 2
    Ride 9 stops to Netaji.
  4. Arrive at Netaji station. You have reached your destination.

Kolkata Metro Route Map 2026

Route from Salt Lake Sector V to Netaji on the map.

Download JPG
Loading map…
100%
Ctrl + Scroll to zoom · Drag to pan

Route Summary

How to reach Netaji from Salt Lake Sector V by metro? Board the metro from Salt Lake Sector V station and travel through 17 intermediate metro stations. During the journey, you will need to change train at 1 interchange station(s) before reaching Netaji.

The approximate travel time between Salt Lake Sector V and Netaji is 0 hrs 56 mins. The total distance covered on this metro route is 28 Km. The first metro from Salt Lake Sector V departs at 06:55 AM, while the last train leaves at 09:52 PM.

The estimated metro fare for this route is ₹50. Smart card users may receive discounted fares. Parking facility is available at Netaji station.

Estimated Travel Cost Comparison and Savings based on distance & typical fares in Indian cities.

ModeEst. CostSavings vs Metro
🚇 Metro₹50—
🏍 Bike₹244 ₹194 more
🛺 Auto₹366 ₹316 more
🚕 Cab₹600 ₹550 more

Pre-calculated Weekly/Monthly Fare Chart

The fare shown below is calculated for daily, weekly, and monthly travel which includes both up and down journey and for a single person.

PeriodCashSmart Card
Daily₹100₹80
Weekly (5 days)₹500₹400
Weekly (6 days)₹600₹480
Weekly (7 days)₹700₹560
Monthly (20 days)₹2,000₹1,600
Monthly (24 days)₹2,400₹1,920
Monthly (28 days)₹2,800₹2,240

Commuting with a Kolkata Metro Smart Card saves up to ₹560 per month on this route.

Metro Ride Benefits

  • Carbon savings: 4.23 kg CO₂
  • Fuel savings: 1.87 litres
  • Time saved vs road: 28.0 minutes
  • Calories burned (walk to/from station): ~70 kcal

Safety Tips

  • Stand behind the yellow line while waiting for the train.
  • Keep your belongings secure and within sight at all times.
  • Let passengers exit before boarding.
  • Hold handrails while the train is moving.
  • In an emergency, use the help point or alert station staff.
Share route info feedback
Route Info
Fare Info
Timing Info
Platform Info

Address
CM Block, Sector V, Bidhannagar, West Bengal 700091
Line & Network
Green Line Kolkata Metro
Layout
Elevated (Side)
Areas Around
CL Block Bidhannagar DN Block Bidhannagar EE Block Bidhannagar Salt Lake Sector V
Station Amenities
Accessible
ATM

Address
Chandi Ghosh Road, Banerjee Para, Tollygunge, Kolkata, West Bengal 700041
Line & Network
Blue Line Kolkata Metro
Layout
Elevated (Side)
Areas Around
Kudghat Ashok Nagar Haridevpur Moor Avenue Netaji
Station Amenities
Accessible
Parking

Salt Lake Sector V to Netaji Metro Route FAQs

There are 19 stations between Salt Lake Sector V and Netaji on this metro route, spanning a total distance of approximately 28 km from end to end.

Yes, this journey starts on the Green Line from Salt Lake Sector V and ends on the Blue Line at Netaji, so you will need to interchange 1 time(s) along the way.

The journey from Salt Lake Sector V to Netaji takes approximately 0 hrs 56 mins at an average metro speed of around 30 km/h, covering 28 km in total.

This entire route from Salt Lake Sector V to Netaji runs on Kolkata Metro.

No, parking facility is not currently available at Salt Lake Sector V metro station, so if you are boarding the Green Line here, consider a drop-off or nearby alternate parking option.

Yes, parking facility is available at Netaji metro station, making it convenient for passengers arriving from Salt Lake Sector V to leave their vehicle if they plan to drive onward afterwards.

The total distance between Salt Lake Sector V and Netaji on this metro route is approximately 28 km, covered in about 0 hrs 56 mins at typical metro speeds.

Take the Green Line from Salt Lake Sector V towards Netaji on Kolkata Metro.

The estimated normal fare from Salt Lake Sector V to Netaji is ₹50, while smart card users can travel the same 28 km route for around ₹40.

The first metro from Salt Lake Sector V towards Netaji departs at 06:55 AM, and the last train on this route leaves at 09:52 PM, so plan your journey within this window.
Book Metro Tickets on ixigo — First Free Metro Ticket Book Metro Tickets on ixigo — First Free Metro Ticket
Saved Routes
No saved routes yet. Tap Save Route on any route page.