Find Another Metro Route

Salt Lake Sector V to Jessore Road Metro Route

Fare & Timings

Normal Fare: ₹50
Smart Card Fare: ₹40
First Train: 06:55 AM
Last Train: 09:52 PM

Station-by-Station Route

22 stations 2 interchanges 32.7 km 1 hrs 5 mins
  1. 1
    Start at Salt Lake Sector V station.
  2. 2
    Board the Green Line towards Howrah Maidan · from Platform 2
    Ride 9 stops to Esplanade.
    Change lines here
  3. 3
    Board the Blue Line towards Dakshineswar · from Platform 1
    Ride 9 stops to Noapara.
    Change lines here
  4. 4
    Board the Yellow Line towards Jai Hind (Airport) · from Platform 4
    Ride 2 stops to Jessore Road.
  5. Arrive at Jessore Road station. You have reached your destination.

Kolkata Metro Route Map 2026

Route from Salt Lake Sector V to Jessore Road on the map.

Loading map…
100%
Scroll to zoom · Drag to pan

Route Summary

How to reach Jessore Road from Salt Lake Sector V by metro? Board the metro from Salt Lake Sector V station and travel through 20 intermediate metro stations. During the journey, you will need to change train at 2 interchange station(s) before reaching Jessore Road.

The approximate travel time between Salt Lake Sector V and Jessore Road is 1 hrs 5 mins. The total distance covered on this metro route is 32.7 Km. The first metro from Salt Lake Sector V departs at 06:55 AM, while the last train leaves at 09:52 PM.

The estimated metro fare for this route is ₹50. Smart card users may receive discounted fares. Parking facility is not available at either Salt Lake Sector V or Jessore Road station.

Estimated Travel Cost Comparison and Savings based on distance & typical fares in Indian cities.

ModeEst. CostSavings vs Metro
🚇 Metro₹50
🏍 Bike₹282 ₹232 more
🛺 Auto₹423 ₹373 more
🚕 Cab₹694 ₹644 more

Pre-calculated Weekly/Monthly Fare Chart

The fare shown below is calculated for daily, weekly, and monthly travel which includes both up and down journey and for a single person.

PeriodCashSmart Card
Daily₹100₹80
Weekly (5 days)₹500₹400
Weekly (6 days)₹600₹480
Weekly (7 days)₹700₹560
Monthly (20 days)₹2,000₹1,600
Monthly (24 days)₹2,400₹1,920
Monthly (28 days)₹2,800₹2,240

Metro Ride Benefits

  • 🌱 Carbon savings: 4.94 kg CO₂
  • ⛽ Fuel savings: 2.18 litres
  • ⏱ Time saved vs road: 32.7 minutes
  • 🔥 Calories burned (walk to/from station): ~70 kcal

Safety Tips

  • Stand behind the yellow line while waiting for the train.
  • Keep your belongings secure and within sight at all times.
  • Let passengers exit before boarding.
  • Hold handrails while the train is moving.
  • In an emergency, use the help point or alert station staff.
Share route info feedback
Route Info
Fare Info
Timing Info
Platform Info

Address
CM Block, Sector V, Bidhannagar, West Bengal 700091
Network & Line
Kolkata Metro
Green Line
Layout
Elevated
Platform
Side
Areas Around
CL Block Bidhannagar DN Block Bidhannagar EE Block Bidhannagar Salt Lake Sector V
Station Amenities
Accessible
ATM

Address
kolkata Airport Quarters, Kaikhali, Kolkata, North Dumdum, West Bengal 700028
Network & Line
Kolkata Metro
Yellow Line
Layout
At Grade
Platform
Island
Areas Around
Gorabazar Rajarhat Botanical Garden Durganagar Raiwlay Station Netaji Subhash Chandra Bose International Airport Jessore Road
Station Amenities
Accessible

Salt Lake Sector V to Jessore Road Metro Route FAQs

There are 22 stations between Salt Lake Sector V and Jessore Road on this metro route.

The journey from Salt Lake Sector V to Jessore Road takes approximately 1 hrs 5 mins, covering a distance of about 32.7 km.

No, parking facility is not available at Salt Lake Sector V metro station.

No, parking facility is not available at Jessore Road metro station.
Book Metro Tickets on ixigo — First Free Metro Ticket Book Metro Tickets on ixigo — First Free Metro Ticket
Saved Routes
No saved routes yet. Tap Save Route on any route page.