Find a DMRC Route

Shaheed Sthal (New Bus Adda) to Mundka Industrial Area Metro Route

Shaheed Sthal (New Bus Adda) Metro Station is — km away from you

Fare & Timings

Normal Fare: ₹64
Smart Card Fare: ₹58
First Train: 06:00 AM
Last Train: 11:00 PM
Powered by ixigo & ONDC

Station-by-Station Route

37 stations 1 interchange 39.3 km 0 hrs 52 mins
  1. 1
    Start at Shaheed Sthal (New Bus Adda) station. Entry Gates
  2. 2
    Board the Red Line towards Rithala · from Platform 1
    Ride 21 stops to Inderlok.
    Change lines here
  3. 3
    Board the Green Line towards Brigadier Hoshiar Singh · from Platform 3
    Ride 15 stops to Mundka Industrial Area.
  4. Arrive at Mundka Industrial Area station. You have reached your destination. Exit Gates

Delhi Metro Route Map 2026

Route from Shaheed Sthal (New Bus Adda) to Mundka Industrial Area on the map.

Download JPG
Loading map…
100%
Ctrl + Scroll to zoom · Drag to pan

Route Summary

How to reach Mundka Industrial Area from Shaheed Sthal (New Bus Adda) by metro? Board the metro from Shaheed Sthal (New Bus Adda) station and travel through 35 intermediate metro stations. During the journey, you will need to change train at 1 interchange station(s) before reaching Mundka Industrial Area.

The approximate travel time between Shaheed Sthal (New Bus Adda) and Mundka Industrial Area is 0 hrs 52 mins. The total distance covered on this metro route is 39.3 Km. The first metro from Shaheed Sthal (New Bus Adda) departs at 06:00 AM, while the last train leaves at 11:00 PM.

The estimated metro fare for this route is ₹64. Smart card users may receive discounted fares. Parking facility is available at Shaheed Sthal (New Bus Adda) station.

Estimated Travel Cost Comparison and Savings based on distance & typical fares in Indian cities.

ModeEst. CostSavings vs Metro
🚇 Metro₹64—
🏍 Bike₹334 ₹270 more
🛺 Auto₹501 ₹437 more
🚕 Cab₹826 ₹762 more
Powered by ixigo & ONDC

Pre-calculated Weekly/Monthly Fare Chart

The fare shown below is calculated for daily, weekly, and monthly travel which includes both up and down journey and for a single person.

PeriodCashSmart Card
Daily₹128₹115
Weekly (5 days)₹640₹576
Weekly (6 days)₹768₹691
Weekly (7 days)₹896₹806
Monthly (20 days)₹2,560₹2,304
Monthly (24 days)₹3,072₹2,765
Monthly (28 days)₹3,584₹3,226

Commuting with a Delhi Metro Smart Card saves up to ₹358 per month on this route.

Metro Ride Benefits

  • Carbon savings: 5.93 kg CO₂
  • Fuel savings: 2.62 litres
  • Time saved vs road: 65.5 minutes
  • Calories burned (walk to/from station): ~70 kcal

Safety Tips

  • Stand behind the yellow line while waiting for the train.
  • Keep your belongings secure and within sight at all times.
  • Let passengers exit before boarding.
  • Hold handrails while the train is moving.
  • In an emergency, use the help point or alert station staff.
Share route info feedback
Route Info
Fare Info
Timing Info
Platform Info

Address
Sector 7, Patel Nagar 2nd, Patel Nagar, Ghaziabad, Uttar Pradesh 201003
Line & Network
Red Line Delhi Metro
Contact
Layout
Elevated (Side)
Areas Around
Islam Nagar Red Mall Pilkhuva Mukund Nagar Patel Nagar 2nd Shaheed Sthal (New Bus Adda)
Station Amenities
Parking
Accessible
ATM
Train Frequency
PeakOff-Peak
Weekdays 6 min 42 sec 8 min 00 sec
Saturday 7 min 22 sec 8 min 30 sec
Sunday 10 min 00 sec 10 min 00 sec

Address
Mundka Industrial Area, Mundka, Delhi 110081
Line & Network
Green Branch Line Delhi Metro
Contact
Layout
Elevated (Side)
Areas Around
Loknayak Puram Veena Enclave Balmiki Basti Rasulpur Mundka Industrial Area
Station Amenities
Accessible
Feeder Bus
Train Frequency
PeakOff-Peak
Weekdays 6 min 15 sec 7 min 45 sec
Saturday 7 min 30 sec 7 min 45 sec
Sunday 8 min 37 sec 8 min 37 sec
Nearby Bus Stop
587 m away
Buses from Mile Stone / Shiv Shankar Dharam Kanta
219EXT 219STL 708 905STL 922 927EXT 927STL 934 934A 938ACL 961 961B 961E

Shaheed Sthal (New Bus Adda) to Mundka Industrial Area Metro Route FAQs

There are 37 stations between Shaheed Sthal (New Bus Adda) and Mundka Industrial Area on this metro route, spanning a total distance of approximately 39.3 km from end to end.

Yes, this journey starts on the Red Line from Shaheed Sthal (New Bus Adda) and ends on the Green Branch Line at Mundka Industrial Area, so you will need to interchange 1 time(s) along the way.

The journey from Shaheed Sthal (New Bus Adda) to Mundka Industrial Area takes approximately 0 hrs 52 mins at an average metro speed of around 45 km/h, covering 39.3 km in total.

This entire route from Shaheed Sthal (New Bus Adda) to Mundka Industrial Area runs on Delhi Metro.

Yes, parking facility is available at Shaheed Sthal (New Bus Adda) metro station, so you can conveniently park your vehicle here before boarding the Red Line towards Mundka Industrial Area.

No, parking facility is not currently available at Mundka Industrial Area metro station, so passengers planning to drive from this end are advised to arrange alternate parking nearby in advance.

The total distance between Shaheed Sthal (New Bus Adda) and Mundka Industrial Area on this metro route is approximately 39.3 km, covered in about 0 hrs 52 mins at typical metro speeds.

Take the Red Line from Shaheed Sthal (New Bus Adda) towards Mundka Industrial Area on Delhi Metro.

The estimated normal fare from Shaheed Sthal (New Bus Adda) to Mundka Industrial Area is ₹64, while smart card users can travel the same 39.3 km route for around ₹58.

The first metro from Shaheed Sthal (New Bus Adda) towards Mundka Industrial Area departs at 06:00 AM, and the last train on this route leaves at 11:00 PM, so plan your journey within this window.
Book Metro Tickets on ixigo — First Free Metro Ticket Book Metro Tickets on ixigo — First Free Metro Ticket
Saved Routes
No saved routes yet. Tap Save Route on any route page.