Find Another Metro Route

Shyambazaar to Bengal Chemical Metro Route

Fare & Timings

Normal Fare: ₹25
Smart Card Fare: ₹20
First Train: 07:01 AM
Last Train: 09:44 PM

Station-by-Station Route

12 stations 1 interchange 10.7 km 0 hrs 21 mins
Starts here
Blue Line · Platform No.: 2 · Towards: Kavi Subhash (New Garia)
Change here
Green Line · Towards: Salt Lake Sector V
Ends here
Exit
  1. 1
    Start at Shyambazaar station.
  2. 2
    Board the Blue Line towards Kavi Subhash (New Garia) · from Platform 2
    Ride 7 stops to Esplanade.
    Change lines here
  3. 3
    Board the Green Line towards Salt Lake Sector V · from Platform 1
    Ride 4 stops to Bengal Chemical.
  4. Arrive at Bengal Chemical station. You have reached your destination.

Kolkata Metro Route Map 2026

Route from Shyambazaar to Bengal Chemical on the map.

Loading map…
100%
Scroll to zoom · Drag to pan

Route Summary

How to reach Bengal Chemical from Shyambazaar by metro? Board the metro from Shyambazaar station and travel through 10 intermediate metro stations. During the journey, you will need to change train at 1 interchange station(s) before reaching Bengal Chemical.

The approximate travel time between Shyambazaar and Bengal Chemical is 0 hrs 21 mins. The total distance covered on this metro route is 10.7 Km. The first metro from Shyambazaar departs at 07:01 AM, while the last train leaves at 09:44 PM.

The estimated metro fare for this route is ₹25. Smart card users may receive discounted fares. Parking facility is not available at either Shyambazaar or Bengal Chemical station.

Estimated Travel Cost Comparison and Savings based on distance & typical fares in Indian cities.

ModeEst. CostSavings vs Metro
🚇 Metro₹25
🏍 Bike₹106 ₹81 more
🛺 Auto₹159 ₹134 more
🚕 Cab₹254 ₹229 more

Pre-calculated Weekly/Monthly Fare Chart

The fare shown below is calculated for daily, weekly, and monthly travel which includes both up and down journey and for a single person.

PeriodCashSmart Card
Daily₹50₹40
Weekly (5 days)₹250₹200
Weekly (6 days)₹300₹240
Weekly (7 days)₹350₹280
Monthly (20 days)₹1,000₹800
Monthly (24 days)₹1,200₹960
Monthly (28 days)₹1,400₹1,120

Metro Ride Benefits

  • 🌱 Carbon savings: 1.62 kg CO₂
  • ⛽ Fuel savings: 0.71 litres
  • ⏱ Time saved vs road: 10.7 minutes
  • 🔥 Calories burned (walk to/from station): ~70 kcal

Safety Tips

  • Stand behind the yellow line while waiting for the train.
  • Keep your belongings secure and within sight at all times.
  • Let passengers exit before boarding.
  • Hold handrails while the train is moving.
  • In an emergency, use the help point or alert station staff.
Share route info feedback
Route Info
Fare Info
Timing Info
Platform Info

Address
Bhupendra Bose Ave, Hati Bagan, Shyambazar, Kolkata, West Bengal 700004
Network & Line
Kolkata Metro
Blue Line
Layout
Underground
Platform
Island
Areas Around
Baghbazar RG Kar Medical College Daspara Hatibagan Market Shyambazaar
Station Amenities
Accessible
Station Gates
Gate No.Way ToAccessible
1 Main Gate- Shyambazar Five Point
2 RGKMCH Gate
3 MMC College Gate
4 Bhupen Bose Avenue- Gate

Address
SH 3, Kadapara, Phool Bagan, Kankurgachi, Kolkata, West Bengal 700054
Network & Line
Kolkata Metro
Green Line
Layout
Elevated
Platform
Side
Areas Around
FB Block Bidhannagar DA Block Bidhannagar Bengal Chemical
Station Amenities
Accessible
ATM

Shyambazaar to Bengal Chemical Metro Route FAQs

There are 12 stations between Shyambazaar and Bengal Chemical on this metro route.

The journey from Shyambazaar to Bengal Chemical takes approximately 0 hrs 21 mins, covering a distance of about 10.7 km.

No, parking facility is not available at Shyambazaar metro station.

No, parking facility is not available at Bengal Chemical metro station.
Book Metro Tickets on ixigo — First Free Metro Ticket Book Metro Tickets on ixigo — First Free Metro Ticket
Saved Routes
No saved routes yet. Tap Save Route on any route page.