Guwahati Metro Green Line Overview
The Green Line refers to a proposed corridor of the Guwahati Metro Phase 1 plan, which envisaged four lines totalling about 61.4 km. It corresponds to the shorter ISBT-Paltan Bazar corridor of about 9.4 km with 8 stations, linking the inter-state bus terminus with the city centre and railway station area. The project has not been sanctioned, and no construction has started. Explore the planned Guwahati Metro Green Line route, proposed stations, interchange points, current construction status and latest project updates.
Green Line Route Map 2026
Pan and zoom to explore the GMDA Green Line.
Loading map…
100%
Ctrl + Scroll to zoom · Drag to pan
Green Line History, Facts & Expansion
- The Green Line corresponds to the proposed ISBT-Paltan Bazar corridor of Guwahati Metro.
- It was planned to be about 9.4 km long with 8 stations.
- Phase 1 of Guwahati Metro proposed four corridors totalling about 61.4 km.
- RITES prepared the feasibility study and detailed project report in 2016.
- No construction has started, and the project has not received central approval.
- ISBT Guwahati is the main bus terminal.
- Paltan Bazar is near the Guwahati railway station.
- GMRCL is the agency.
- No funding has been sanctioned.
Guwahati Metro Green Line Phase-wise Plan
Phase 1 DPR (2016) (Completed)
Prepared by RITES.
Approval (Not granted)
On hold.
Alternatives (Under study)
Lower-cost options considered.