Overview & Facts of Violet line metro Ahmedabad
Interesting facts about Ahmedabad Metro Violet line
- The first part of the second phase covers a distance of 21 kilometres and includes eight new metro stations.
- Phase 2 will integrate with the current part 2 of Phase 1, eventually connecting Sector 1 of Gandhinagar to Mahatma Mandir, an important convention and exhibition centre.
- The project is developed by the Gujarat Metro Rail Corporation (GMRC) in collaboration with the state and central governments.
- The project will connect major locations such as Gujarat National Law University (GNLU), Pandit Deendayal Energy University (PDEU), GIFT City, Raison, Randesan, Dholakuwa, Infocity and Sector-1.
- The new extension will dramatically reduce travel time between Ahmedabad and Gandhinagar, which are about 25 km apart.
- Passengers can travel from APMC to GIFT City in less than an hour at a fare of around Rs 35. Services from Sector-1 metro station to Motera Stadium metro station will run from 7:20 am to 6:40 pm.
- Trains running between GNLU metro station and GIFT City metro station will be available from 8:20 am to 6:25 pm.
Ahmedabad Metro Violet Line Stations List
Sign: ⨝ Interchange, 🅿️ Parking, 🚌 Feeder Bus, 🏧 ATMs️
| Station | 🅿️ | 🚌️ | 🏧️ | |
|---|---|---|---|---|
| ⇓◉ | GNLU ⨝ Interchange | ✕ | ✕ | ✓ |
| ⇅◉ | PDPU | ✕ | ✕ | ✓ |
| ⇑◉ | Gift City | ✕ | ✕ | ✓ |
Ahmedabad Metro Violet Line Route Map 2026
The Ahmedabad Violet Line Metro connects GNLU to Gift City, providing seamless travel to locations near by Violet Line Metro stations. Check out the latest Ahmedabad Metro Violet Line Map below to view stations and interchanges:
Ahmedabad Metro Network Map 2026
Explore the new Ahmedabad Metro Metro Network Map 2026 with updated routes and terminal stations:
Ahmedabad Metro News & Updates
Get the latest news and developments updates from Ahmedabad Metro Violet Line, including new routes openings, extension plans and official announcements etc:
Gujarat Metro Rail Corporation has invited bids for the appointment of a detailed design consultant for Ahmedabad Metro Phase 2. The selected detailed design consultant (DDC) will be responsible for providing comprehensive design and engineering services for two metro extensions under Ahmedabad Metro Rail Project Phase 2A and Phase 2B.
◷ 2025-11-04 | ☍ Metro Rail NewsThe number of people using the Ahmedabad Metro daily has increased significantly. In 2019, an average of 35,000 passengers used the metro services daily, and this figure will reach nearly 1.5 lakh by 2025. With a 99.84 percent punctuality rate, more than 10.38 crore citizens have traveled by the Ahmedabad Metro so far.
◷ 2025-10-12 | ☍ Indian ExpressOn Vijayadashami 2025, the Gujarat Metro Rail Corporation (GMRC) conducted a trial run of the metro between the State Secretariat and Mahatma Mandir in Gandhinagar. This extension marks the progress of the Ahmedabad-Gandhinagar Metro Phase 2 project. The route, which previously ended at the Secretariat, has now been tested through five additional stations: Akshardham, Old Secretariat, Sector 16, Sector 24, and Mahatma Mandir, the last stop on the line.
◷ 2025-10-02 | ☍ Money ControlGujarat Metro Rail Corporation (GMRC) Ltd on Sunday said it is planning to launch the metro rail link between Narendra Modi Stadium, Mahatma Mandir and Gift City in May-June this year after getting mandatory permissions. GMRC conducted the trial run of the metro between Gujarat National Law University (GNLU) and Gujarat International Finance-Tech City (GIFT City) as part of Phase-2 of the metro project.
◷ 2024-03-11 | ☍ Indian ExpressGujarat Metro Rail Corporation (GMRC) Limited has announced that the trial run for the second phase of 20 km from Motera to Gandhinagar will begin in March. The trial run will be between Sector-I of Motera and Gandhinagar via GIFT City. Metro officials said the entire stretch up to Mahatma Mandir is likely to be completed by the end of this year.
◷ 2024-02-14 | ☍ Times of IndiaAhmedabad Metro Violet Line Route FAQs
Explore frequently asked questions regarding the Ahmedabad Violet Line Metro, its connectivity, timing, interchange and more:
𝒜. The Ahmedabad Metro Violet line has total 3 stations which includes elevated, overground, and underground stations.
𝒜. The Ahmedabad Metro Violet line has 1 interchange stations those are connected with other lines of the metro. The name of interchange stations are: GNLU, .
𝒜. You should check the official website or offical twitter handle for this information.
𝒜. The length of Ahmedabad Metro Violet Line is 5.4 KM, and it's terminal stations are GNLU and Gift City.
Ahmedabad Metro Lines and Routes
Explore all Ahmedabad Metro lines beyond the Violet Line, including major routes and connections: