-
1
Start at Begumpul RRTS station.
-
2
Board the Line 1 towards New Ashok Nagar RRTS · from Platform 2
Ride 10 stops to Shaheed Sthal (New Bus Adda).Change lines here -
3
Board the Red Line towards Rithala · from Platform 1
Ride 20 stops to Inderlok.Change lines here -
4
Board the Green Line towards Brigadier Hoshiar Singh · from Platform 3
Ride 15 stops to Mundka Industrial Area.
Find a Namo Bharat Route
Begumpul RRTS to Mundka Industrial Area Metro Route
Fare & Timings
-
1
Start at Begumpul RRTS station.
-
2
Board the Line 1 towards New Ashok Nagar RRTS · from Platform 2
Ride 11 stops to Anand Vihar RRTS.Change lines here -
3
Board the Blue Branch Line towards New Ashok Nagar RRTS
Ride 18 stops to Kirti Nagar.Change lines here -
4
Board the Green Branch Line towards Brigadier Hoshiar Singh · from Platform 3
Ride 16 stops to Mundka Industrial Area.
Delhi Metro Route Map 2026
Route from Begumpul RRTS to Mundka Industrial Area on the map.
Route Summary
How to reach Mundka Industrial Area from Begumpul RRTS by metro? Board the metro from Begumpul RRTS station and travel through 45 intermediate metro stations. During the journey, you will need to change train at 2 interchange station(s) before reaching Mundka Industrial Area.
The approximate travel time between Begumpul RRTS and Mundka Industrial Area is 1 hrs 1 mins. The total distance covered on this metro route is 80.9 Km. The first metro from Begumpul RRTS departs at 06:08 AM, while the last train leaves at 10:05 AM.
The estimated metro fare for this route is ₹174. Smart card users may receive discounted fares. Parking facility is available at Begumpul RRTS station.
Estimated Travel Cost Comparison and Savings based on distance & typical fares in Indian cities.
| Mode | Est. Cost | Savings vs Metro |
|---|---|---|
| 🚇 Metro | ₹174 | — |
| 🏍 Bike | ₹667 | ₹493 more |
| 🛺 Auto | ₹1,001 | ₹827 more |
| 🚕 Cab | ₹1,658 | ₹1,484 more |
Pre-calculated Weekly/Monthly Fare Chart
The fare shown below is calculated for daily, weekly, and monthly travel which includes both up and down journey and for a single person.
| Period | Cash | Smart Card |
|---|---|---|
| Daily | ₹348 | ₹313 |
| Weekly (5 days) | ₹1,740 | ₹1,566 |
| Weekly (6 days) | ₹2,088 | ₹1,879 |
| Weekly (7 days) | ₹2,436 | ₹2,192 |
| Monthly (20 days) | ₹6,960 | ₹6,264 |
| Monthly (24 days) | ₹8,352 | ₹7,517 |
| Monthly (28 days) | ₹9,744 | ₹8,770 |
Metro Ride Benefits
- 🌱 Carbon savings: 12.21 kg CO₂
- ⛽ Fuel savings: 5.39 litres
- ⏱ Time saved vs road: 182.0 minutes
- 🔥 Calories burned (walk to/from station): ~70 kcal
Safety Tips
- Stand behind the yellow line while waiting for the train.
- Keep your belongings secure and within sight at all times.
- Let passengers exit before boarding.
- Hold handrails while the train is moving.
- In an emergency, use the help point or alert station staff.
| Peak | Off-Peak | |
|---|---|---|
| Weekdays | 10 min | 15 min |
| Saturday | 10 min | 15 min |
| Sunday | 10 min | 15 min |
| Gate No. | Way To | Accessible |
|---|---|---|
| 1 | DDA Flats Bakkarwala | |
| 2 | DDA Flats Bakkarwala , Mundka Industrial Area, LoknayakPuram |
| Peak | Off-Peak | |
|---|---|---|
| Weekdays | 6 min 15 sec | 7 min 45 sec |
| Saturday | 7 min 30 sec | 7 min 45 sec |
| Sunday | 8 min 37 sec | 8 min 37 sec |