- 1
-
2
Board the Blue Line towards Dwarka Sector 21 · from Platform 2
Ride 2 stops to Mayur Vihar I.Change lines here -
3
Board the Pink Circular Line towards Yamuna Vihar · from Platform 4
Ride 18 stops to Netaji Subhash Place.
Find Another Metro Route
Mayur Vihar Extension to Netaji Subhash Place Metro Route
Fare & Timings
- 1
-
2
Board the Blue Line towards Dwarka Sector 21 · from Platform 2
Ride 7 stops to Mandi House.Change lines here -
3
Board the Violet Line towards Kashmere Gate · from Platform 4
Ride 5 stops to Kashmere Gate.Change lines here -
4
Board the Red Line towards Rithala · from Platform 3
Ride 8 stops to Netaji Subhash Place.
Delhi Metro Route Map 2026
Route from Mayur Vihar Extension to Netaji Subhash Place on the map.
Route Summary
How to reach Netaji Subhash Place from Mayur Vihar Extension by metro? Board the metro from Mayur Vihar Extension station and travel through 19 intermediate metro stations. During the journey, you will need to change train at 1 interchange station(s) before reaching Netaji Subhash Place.
The approximate travel time between Mayur Vihar Extension and Netaji Subhash Place is 0 hrs 42 mins. The total distance covered on this metro route is 31.9 Km. The first metro from Mayur Vihar Extension departs at 06:19 AM, while the last train leaves at 10:50 PM.
The estimated metro fare for this route is ₹54. Smart card users may receive discounted fares. Parking facility is available at both Mayur Vihar Extension and Netaji Subhash Place stations.
Estimated Travel Cost Comparison and Savings based on distance & typical fares in Indian cities.
| Mode | Est. Cost | Savings vs Metro |
|---|---|---|
| 🚇 Metro | ₹54 | — |
| 🏍 Bike | ₹275 | ₹221 more |
| 🛺 Auto | ₹412 | ₹358 more |
| 🚕 Cab | ₹677 | ₹623 more |
Pre-calculated Weekly/Monthly Fare Chart
The fare shown below is calculated for daily, weekly, and monthly travel which includes both up and down journey and for a single person.
| Period | Cash | Smart Card |
|---|---|---|
| Daily | ₹108 | ₹97 |
| Weekly (5 days) | ₹540 | ₹486 |
| Weekly (6 days) | ₹648 | ₹583 |
| Weekly (7 days) | ₹756 | ₹680 |
| Monthly (20 days) | ₹2,160 | ₹1,944 |
| Monthly (24 days) | ₹2,592 | ₹2,333 |
| Monthly (28 days) | ₹3,024 | ₹2,722 |
Metro Ride Benefits
- 🌱 Carbon savings: 4.81 kg CO₂
- ⛽ Fuel savings: 2.12 litres
- ⏱ Time saved vs road: 53.1 minutes
- 🔥 Calories burned (walk to/from station): ~70 kcal
Safety Tips
- Stand behind the yellow line while waiting for the train.
- Keep your belongings secure and within sight at all times.
- Let passengers exit before boarding.
- Hold handrails while the train is moving.
- In an emergency, use the help point or alert station staff.
| Gate No. | Way To | Accessible |
|---|---|---|
| 1 | Mayur Vihar Extension | |
| 2 | Chilla | |
| 3 | Khichripur |
| Peak | Off-Peak | |
|---|---|---|
| Weekdays | 5 min 32 sec | 7 min 00 sec |
| Saturday | 6 min 30 sec | 7 min 00 sec |
| Sunday | 8 min 30 sec | 9 min 00 sec |
| Gate No. | Way To | Accessible |
|---|---|---|
| 1 | Big Bazar, Ring Road | |
| 2 | Netaji Subhash Palace, District Centre, and D-Mall. | |
| 3 | Dilli Haat (Pitampura), Guru Gobind Singh College, and the TV Tower | |
| 4 | Wazirpur Depot and adjacent service roads. | |
| 5 | Netaji Subhash Commercial Centre/Complex |
| Peak | Off-Peak | |
|---|---|---|
| Weekdays | 6 min 30 sec | 7 min 00 sec |
| Saturday | 7 min 00 sec | 8 min 10 sec |
| Sunday | 8 min 10 sec | 8 min 10 sec |