Find a DMRC Route

Mundka Industrial Area to Bata Chowk Metro Route

Mundka Industrial Area Metro Station is — km away from you

Fare & Timings

Normal Fare: ₹64
Smart Card Fare: ₹58
First Train: 06:26 AM
Last Train: 11:13 PM
Powered by ixigo & ONDC
53 stations 2 interchanges 57.5 km 1 hrs 17 mins
  1. 1
    Start at Mundka Industrial Area station.
  2. 2
    Board the Green Branch Line towards Raja Nahar Singh Ballabhgarh
    Ride 17 stops to Kirti Nagar.
    Change lines here
  3. 3
    Board the Blue Line towards Noida Electronic City · from Platform 4
    Ride 9 stops to Mandi House.
    Change lines here · 5 min Walk Kirti Nagar Metro Station is an elevated interchange station connecting Blue and Green Lines.
  4. 4
    Board the Violet Line towards Raja Nahar Singh Ballabhgarh · from Platform 3
    Ride 25 stops to Bata Chowk.
  5. Arrive at Bata Chowk station. You have reached your destination.
53 stations 4 interchanges 55.2 km 1 hrs 14 mins
  1. 1
    Start at Mundka Industrial Area station.
  2. 2
    Board the Green Line towards Inderlok · from Platform 2
    Ride 15 stops to Ashok Park Main.
    Change lines here
  3. 3
    Board the Green Branch Line towards Kirti Nagar · from Platform 2
    Ride 2 stops to Kirti Nagar.
    Change lines here
  4. 4
    Board the Blue Line towards Noida Electronic City · from Platform 4
    Ride 7 stops to Rajiv Chowk.
    Change lines here
  5. 5
    Board the Yellow Line towards Millennium City Centre (HUDA City Centre) · from Platform 1
    Ride 2 stops to Central Secretariat.
    Change lines here
  6. 6
    Board the Violet Line towards Raja Nahar Singh Ballabhgarh · from Platform 3
    Ride 23 stops to Bata Chowk.
  7. Arrive at Bata Chowk station. You have reached your destination.

Delhi Metro Route Map 2026

Route from Mundka Industrial Area to Bata Chowk on the map.

Loading map…
100%
Ctrl + Scroll to zoom · Drag to pan

Route Summary

How to reach Bata Chowk from Mundka Industrial Area by metro? Board the metro from Mundka Industrial Area station and travel through 51 intermediate metro stations. During the journey, you will need to change train at 2 interchange station(s) before reaching Bata Chowk.

The approximate travel time between Mundka Industrial Area and Bata Chowk is 1 hrs 17 mins. The total distance covered on this metro route is 57.5 Km. The first metro from Mundka Industrial Area departs at 06:26 AM, while the last train leaves at 11:13 PM.

The estimated metro fare for this route is ₹64. Smart card users may receive discounted fares. Parking facility is available at Bata Chowk station.

Estimated Travel Cost Comparison and Savings based on distance & typical fares in Indian cities.

ModeEst. CostSavings vs Metro
🚇 Metro₹64—
🏍 Bike₹480 ₹416 more
🛺 Auto₹720 ₹656 more
🚕 Cab₹1,190 ₹1,126 more
Powered by ixigo & ONDC

Pre-calculated Weekly/Monthly Fare Chart

The fare shown below is calculated for daily, weekly, and monthly travel which includes both up and down journey and for a single person.

PeriodCashSmart Card
Daily₹128₹115
Weekly (5 days)₹640₹576
Weekly (6 days)₹768₹691
Weekly (7 days)₹896₹806
Monthly (20 days)₹2,560₹2,304
Monthly (24 days)₹3,072₹2,765
Monthly (28 days)₹3,584₹3,226

Metro Ride Benefits

  • 🌱 Carbon savings: 8.68 kg CO₂
  • ⛽ Fuel savings: 3.83 litres
  • ⏱ Time saved vs road: 95.8 minutes
  • 🔥 Calories burned (walk to/from station): ~70 kcal

Safety Tips

  • Stand behind the yellow line while waiting for the train.
  • Keep your belongings secure and within sight at all times.
  • Let passengers exit before boarding.
  • Hold handrails while the train is moving.
  • In an emergency, use the help point or alert station staff.
Share route info feedback
Route Info
Fare Info
Timing Info
Platform Info

Address
Mundka Industrial Area, Mundka, Delhi 110081
Network & Line
Delhi Metro
Green Branch Line
Contact
Layout
Elevated
Platform
Side
Areas Around
Loknayak Puram Veena Enclave Balmiki Basti Rasulpur Mundka Industrial Area
Station Amenities
Accessible
Feeder Bus
Station Gates
Gate No.Way ToAccessible
1 DDA Flats Bakkarwala
2 DDA Flats Bakkarwala , Mundka Industrial Area, LoknayakPuram

Address
Mathura Road, Sector 12, New Industrial Town, Faridabad, Haryana 121007
Network & Line
Delhi Metro
Violet Line
Contact
Layout
Elevated
Platform
Side
Areas Around
Parshnath City Mall Eldeco Station 1 Mall SRS Shopping Mall AC Nagar Bata Chowk
Station Amenities
Parking
Accessible
ATM
Station Gates
Gate No.Way ToAccessible
1 Eldeco Station 1 Mall
2 Silver City Mall
3 Radisson Blue Hotel
Train Frequency
PeakOff-Peak
Weekdays 6 min 48 sec 9 min 30 sec
Saturday 8 min 00 sec 10 min 32 sec
Sunday 10 min 20 sec 10 min 20 sec

Mundka Industrial Area to Bata Chowk Metro Route FAQs

There are 53 stations between Mundka Industrial Area and Bata Chowk on this metro route, spanning a total distance of approximately 57.5 km from end to end.

Yes, this journey starts on the Green Branch Line from Mundka Industrial Area and ends on the Violet Line at Bata Chowk, so you will need to interchange 2 time(s) along the way.

The journey from Mundka Industrial Area to Bata Chowk takes approximately 1 hrs 17 mins at an average metro speed of around 45 km/h, covering 57.5 km in total.

This entire route from Mundka Industrial Area to Bata Chowk runs on Delhi Metro.

No, parking facility is not currently available at Mundka Industrial Area metro station, so if you are boarding the Green Branch Line here, consider a drop-off or nearby alternate parking option.

Yes, parking facility is available at Bata Chowk metro station, making it convenient for passengers arriving from Mundka Industrial Area to leave their vehicle if they plan to drive onward afterwards.

The total distance between Mundka Industrial Area and Bata Chowk on this metro route is approximately 57.5 km, covered in about 1 hrs 17 mins at typical metro speeds.

Take the Green Branch Line from Mundka Industrial Area towards Bata Chowk on Delhi Metro.

The estimated normal fare from Mundka Industrial Area to Bata Chowk is ₹64, while smart card users can travel the same 57.5 km route for around ₹58.

The first metro from Mundka Industrial Area towards Bata Chowk departs at 06:26 AM, and the last train on this route leaves at 11:13 PM, so plan your journey within this window.
Book Metro Tickets on ixigo — First Free Metro Ticket Book Metro Tickets on ixigo — First Free Metro Ticket
Saved Routes
No saved routes yet. Tap Save Route on any route page.