Find Another Metro Route
Sector 42 43 to Adarsh Nagar Metro Route
Station-by-Station Route
Gurgaon Metro Route Map 2026
Route from Sector 42 43 to Adarsh Nagar on the map.
Route Summary
How to reach Adarsh Nagar from Sector 42 43 by metro? Board the metro from Sector 42 43 station and travel through 31 intermediate metro stations. During the journey, you will need to change train at 1 interchange station(s) before reaching Adarsh Nagar.
The approximate travel time between Sector 42 43 and Adarsh Nagar is 1 hrs 9 mins. The total distance covered on this metro route is 40 Km. The first metro from Sector 42 43 departs at 06:06 AM, while the last train leaves at 10:06 PM.
The estimated metro fare for this route is ₹84. Smart card users may receive discounted fares. Parking facility is not available at either Sector 42 43 or Adarsh Nagar station.
Estimated Travel Cost Comparison and Savings based on distance & typical fares in Indian cities.
| Mode | Est. Cost | Savings vs Metro |
|---|---|---|
| 🚇 Metro | ₹84 | — |
| 🏍 Bike | ₹340 | ₹256 more |
| 🛺 Auto | ₹510 | ₹426 more |
| 🚕 Cab | ₹840 | ₹756 more |
Pre-calculated Weekly/Monthly Fare Chart
The fare shown below is calculated for daily, weekly, and monthly travel which includes both up and down journey and for a single person.
| Period | Cash | Smart Card |
|---|---|---|
| Daily | ₹168 | ₹155 |
| Weekly (5 days) | ₹840 | ₹776 |
| Weekly (6 days) | ₹1,008 | ₹931 |
| Weekly (7 days) | ₹1,176 | ₹1,086 |
| Monthly (20 days) | ₹3,360 | ₹3,104 |
| Monthly (24 days) | ₹4,032 | ₹3,725 |
| Monthly (28 days) | ₹4,704 | ₹4,346 |
Metro Ride Benefits
- 🌱 Carbon savings: 6.04 kg CO₂
- ⛽ Fuel savings: 2.67 litres
- ⏱ Time saved vs road: 51.4 minutes
- 🔥 Calories burned (walk to/from station): ~70 kcal
Safety Tips
- Stand behind the yellow line while waiting for the train.
- Keep your belongings secure and within sight at all times.
- Let passengers exit before boarding.
- Hold handrails while the train is moving.
- In an emergency, use the help point or alert station staff.
| Gate No. | Way To | Accessible |
|---|---|---|
| 1 | Main Golf Course Road | |
| 2 | Main Golf Course Road | |
| 3 | Opens toward DLF Phase 5, servicing the premium residential and corporate hubs in the area. |
| Gate No. | Way To | Accessible |
|---|---|---|
| 1 | Moolchand Colony | |
| 2 | Keval Park, Majlish Park | |
| 3 | New Sabzi Mandi, Adarsh Nagar Indian Railway Station | |
| 4 | Fruit Mandi, Sarai Pipal Thala |
| Peak | Off-Peak | |
|---|---|---|
| Weekdays | 5 min 48 sec | 7 min 00 sec |
| Saturday | 6 min 10 sec | 7 min 10 sec |
| Sunday | 4 min 01 sec | 8 min 02 sec |