Find a HMRTC Route

Sector 55 56 to Raj Bagh Metro Route

Sector 55 56 Metro Station is — km away from you

Fare & Timings

Normal Fare: ₹84
HMRTC ₹20 · DMRC ₹64
Smart Card Fare: ₹78
First Train: 06:00 AM
Last Train: 10:00 PM
Powered by ixigo & ONDC

Station-by-Station Route

39 stations 2 interchanges 46.9 km 1 hrs 20 mins
  1. 1
    Start at Sector 55 56 station. Entry Gates
  2. 2
    Board the Rapid Line towards Phase 3 · from Platform 2
    Ride 6 stops to Sikandarpur.
    Change lines here
  3. 3
    Board the Yellow Line towards Samaypur Badli · from Platform 2
    Ride 22 stops to Kashmere Gate.
    Change lines here
  4. 4
    Board the Red Line towards Shaheed Sthal (New Bus Adda) · from Platform 4
    Ride 9 stops to Raj Bagh.
  5. Arrive at Raj Bagh station. You have reached your destination. Exit Gates

Gurgaon Metro Route Map 2026

Route from Sector 55 56 to Raj Bagh on the map.

Download JPG
Loading map…
100%
Ctrl + Scroll to zoom · Drag to pan

Route Summary

How to reach Raj Bagh from Sector 55 56 by metro? Board the metro from Sector 55 56 station and travel through 37 intermediate metro stations. During the journey, you will need to change train at 2 interchange station(s) before reaching Raj Bagh.

The approximate travel time between Sector 55 56 and Raj Bagh is 1 hrs 20 mins. The total distance covered on this metro route is 46.9 Km. The first metro from Sector 55 56 departs at 06:00 AM, while the last train leaves at 10:00 PM.

The estimated metro fare for this route is ₹84. Smart card users may receive discounted fares. Parking facility is not available at either Sector 55 56 or Raj Bagh station.

Estimated Travel Cost Comparison and Savings based on distance & typical fares in Indian cities.

ModeEst. CostSavings vs Metro
🚇 Metro₹84—
🏍 Bike₹395 ₹311 more
🛺 Auto₹593 ₹509 more
🚕 Cab₹978 ₹894 more
Powered by ixigo & ONDC

Pre-calculated Weekly/Monthly Fare Chart

The fare shown below is calculated for daily, weekly, and monthly travel which includes both up and down journey and for a single person.

PeriodCashSmart Card
Daily₹168₹155
Weekly (5 days)₹840₹776
Weekly (6 days)₹1,008₹931
Weekly (7 days)₹1,176₹1,086
Monthly (20 days)₹3,360₹3,104
Monthly (24 days)₹4,032₹3,725
Monthly (28 days)₹4,704₹4,346

Commuting with a Gurgaon Metro Smart Card saves up to ₹358 per month on this route.

Metro Ride Benefits

  • Carbon savings: 7.08 kg CO₂
  • Fuel savings: 3.13 litres
  • Time saved vs road: 60.3 minutes
  • Calories burned (walk to/from station): ~70 kcal

Safety Tips

  • Stand behind the yellow line while waiting for the train.
  • Keep your belongings secure and within sight at all times.
  • Let passengers exit before boarding.
  • Hold handrails while the train is moving.
  • In an emergency, use the help point or alert station staff.
Share route info feedback
Route Info
Fare Info
Timing Info
Platform Info

Address
Sector 56, Ghata, Gurugram, Haryana 122011
Line & Network
Rapid Line Gurgaon Metro
Layout
Elevated (Side)
Areas Around
Ghata Kendriya Vihar Sushant Lok 2 Ghatta Kanarpur Sector 55 56
Station Amenities
Accessible

Address
132/9, Grand Trunk Road, Prakash Industrial Estate, Raj Bagh, Ghaziabad, Uttar Pradesh 201005
Line & Network
Red Line Delhi Metro
Contact
Layout
Elevated (Side)
Areas Around
Shalimar Garden Aradhana Cinema Brindavan Garden Extension Sahibabad Dwarka Enclave Raj Bagh
Station Amenities
Accessible
Train Frequency
PeakOff-Peak
Weekdays 6 min 42 sec 8 min 00 sec
Saturday 7 min 22 sec 8 min 30 sec
Sunday 10 min 00 sec 10 min 00 sec

Sector 55 56 to Raj Bagh Metro Route FAQs

There are 39 stations between Sector 55 56 and Raj Bagh on this metro route, spanning a total distance of approximately 46.9 km from end to end.

Yes, this journey starts on the Rapid Line from Sector 55 56 and ends on the Red Line at Raj Bagh, so you will need to interchange 2 time(s) along the way.

The journey from Sector 55 56 to Raj Bagh takes approximately 1 hrs 20 mins at an average metro speed of around 35 km/h, covering 46.9 km in total.

This route starts on Gurgaon Metro at Sector 55 56 and ends on Delhi Metro at Raj Bagh, so you will interchange between two different operators' systems during the journey.

No, parking facility is not currently available at Sector 55 56 metro station, so if you are boarding the Rapid Line here, consider a drop-off or nearby alternate parking option.

No, parking facility is not currently available at Raj Bagh metro station, so passengers planning to drive from this end are advised to arrange alternate parking nearby in advance.

The total distance between Sector 55 56 and Raj Bagh on this metro route is approximately 46.9 km, covered in about 1 hrs 20 mins at typical metro speeds.

Start on the Rapid Line at Sector 55 56 on Gurgaon Metro, then interchange onto the Red Line to reach Raj Bagh on the Delhi Metro network at the other end.

The estimated normal fare from Sector 55 56 to Raj Bagh is ₹84, while smart card users can travel the same 46.9 km route for around ₹78.

The first metro from Sector 55 56 towards Raj Bagh departs at 06:00 AM, and the last train on this route leaves at 10:00 PM, so plan your journey within this window.
Book Metro Tickets on ixigo — First Free Metro Ticket Book Metro Tickets on ixigo — First Free Metro Ticket
Saved Routes
No saved routes yet. Tap Save Route on any route page.