● Blue Line
Madhya Pradesh Metro Rail Corporation (MPMRC)
Proposed
13
Stations
13 Construction
12.91 km
Line Length
Terminal Stations
Bhoj Metro Blue Line Overview
The Blue Line is Bhopal Metro's second Phase 1 corridor, planned from Bhadbhada Square to Ratnagiri Tiraha across about 14 km. It will serve areas such as Roshanpura, Polytechnic Square, Lalghati and the BHEL area in the east, and cross the Orange Line in central Bhopal. Civil construction under the BH-05 package is in progress, and no section has opened yet. Explore the planned Bhopal Metro Blue Line route, proposed station list, interchange points, approval and construction status, and the latest project updates.
Blue Line Station List 2026 (0 Active)
Parking Feeder Bus ATM Restroom
Under Construction ·
Proposed
Bhadbhada Chauraha
Depot Chauraha
Jawahar Chowk
Roshanpura Chauraha
Minto Hall
Lilly Talkies
Pul Bogda
Interchange
Prabhat Chauraha
Govindpura
JK Road
Indrapuri
Piplani (BHEL Township)
Ratnagiri Chouraha
Blue Line Route Map 2026
Pan and zoom to explore the MPMRC Blue Line.
Loading map…
100%
Ctrl + Scroll to zoom · Drag to pan
Blue Line History, Facts & Expansion
- The Blue Line is part of Bhopal Metro Phase 1, along with the Orange Line.
- It is planned from Bhadbhada Square to Ratnagiri Tiraha, about 14 km long.
- Its main civil package, BH-05, covers an elevated viaduct and 13 stations.
- Seven firms bid for the civil package in October 2023, and construction is in progress.
- The line will interchange with the Orange Line in central Bhopal.
- No section was open as of October 2026.
- Trains for the Blue Line will share the Alstom Movia fleet and depot with the Orange Line.
- The line will serve Bhadbhada, Roshanpura, Polytechnic Square and Ratnagiri.
- BHEL area is one of the largest industrial townships served.
- It is funded under Bhopal Metro Phase 1.
Bhopal Metro Blue Line Phase-wise Expansion
Phase 1 - Civil Contract (Under construction)
BH-05 package covering viaduct and 13 stations.
Phase 1 - Systems (Upcoming)
Track, signalling and electrification to follow.
Opening (Not announced)
Opening date to be announced.